• Title/Summary/Keyword: High-speed Operation

Search Result 2,228, Processing Time 0.035 seconds

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

Thermohydrodynamic Lubrication Analysis of High Speed Journal Bearing Considering Variable Density and Specific Heat (변화하는 밀도와 비열을 고려한 고속 저어널 베어링의 열유체 윤활해석)

  • 전상명;장시열
    • Tribology and Lubricants
    • /
    • v.17 no.4
    • /
    • pp.297-306
    • /
    • 2001
  • Under the condition of variable density and specific heat, maximum pressure, maximum temperature, bearing load, friction and side leakage in high-speed journal bearing operation are examined within some degree of Journal misalignment. The results are compared with the calculation results under the conditions of constant density and specific heat, and variable density and constant specific heat. It is found that the condition of variable density and specific heat play important roles in determining friction and load of Journal bearing at high speed operation.

Applying Hybrid Type Energy Storage System in AC High Speed Railway (하이브리드 타입 에너지 저장장치의 교류 고속철도 적용)

  • Jeon, Yong-Joo;Kang, Byoung-Wook;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.60-66
    • /
    • 2014
  • In case of DC railway, value of ESS(Energy Storage System) is already approved. Whereas AC railway system, there are a lot of differences such as system design and operation pattern. Therefore there is doubt about AC ESS usefulness. Especially, regenerative energy can return to the source. So in case of AC 25kV system, it is necessary to consider different operation algorithm compare to DC railway system. In this paper ESS which is installed in AC high-speed railway was introduced. Power consumption pattern of High speed trains were analyzed, proper storage material was reviewed and operation algorithm was suggested. Super capacitor and Battery was used with hybrid type. Super capacitor was used to handle short term energy movement because of its prompt response and battery was used to handle long term energy movement because of its high energy density. Also in case of operation algorithm, phase control method was upgraded compare to voltage magnitude detection method.

Analysis of risk for high-speed trains caused by crosswind in subgrade settlement zones based on CFD-FE coupling

  • Qian Zhang;Xiaopei Cai;Tao Wang;Yanrong Zhang;Shusheng Yang
    • Wind and Structures
    • /
    • v.37 no.4
    • /
    • pp.275-287
    • /
    • 2023
  • Subgrade differential settlement of high-speed railways was a pivotal issue that could increase the risk of trains operation. The risk will be further increased when trains in the subsidence zone are affected by crosswinds. In this paper, the computational fluid dynamics (CFD) model and finite element (FE) model were established, and the data transmission interface of the two models was established by fluid-solid interaction (FSI) method to form a systematic crosswind-train-track-subgrade dynamic model. The risk of high-speed train encountering crosswind in settlement area was analyzed. The results showed that the aerodynamic force of the trains increased significantly with the increase in crosswind speed. The aerodynamic force of the trains could reach 125.14 kN, significantly increasing the risk of derailment and overturning. Considering the influence of crosswind, the risk of train operation could be greatly increased. The safety indices and the wheel-rail force both increased with the increase of the wind speed. For the high-speed train running at 350 km/h, the warning value of wind speed was 10.2 m /s under the condition of subgrade settlement with wavelength of 20 m and amplitude of 15 mm.

Deformation Measurement of Roadbed in Full-scale Field Test to Determine an Optimum Trackbed of High-Speed Railway (고속철도 노반의 최적단면 결정을 위한 실대형 모형시험에서의 노반 변형 계측)

  • Jung, Young-Hoon;Kim, Hak-Sung;Byeon, Bo-Hyeon;Lee, Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2821-2829
    • /
    • 2011
  • Since the KTX was in operation in 2004, a number of researches on increasing the train speed have been conducted. Currently, the Honam High-speed train system is designed for the operation velocity of 350km/h. The societal demand expects higher operation speed, whereas the existing construction method and design specification are questioned in the KTX operation in the velocity over 350 km/h. In this study, a full-scale model test was conducted to obtain the preliminary data that is necessary to understand deformation characteristics of the reinforced road bed and the subgrade layers. In the full-scale model test, direct arrival seismic tests, crosshole seimic test, in-situ bender element test and sensing bar test were employed to measure the stiffness and deformation of the trackbed. The systematic analysis on the different set of measurements enhances the understanding of the behavior of the trackbed.

  • PDF

Performance analysis of High Speed rolling stock propulsion system (고속철도차량 추진시스템 성능해석)

  • Son, Kyoung-So;Jang, Seok-Myeong;Yun, Cha-Jung
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.461-469
    • /
    • 2010
  • Up to now, High speed train was widely used in France, Germany and Japan. In korea, High speed train was introduced from France train model and operation was made in year 2004. With this high speed operation Know-How, HSR-350 train was developed with our own technology. And now KTX-II which was made by our own technology are running in commercial line. High speed rolling stock system acceleration technology is train propulsion system and this is composed with traction motor, Power transfer system and auxiliary power system. This paper, introduced the performance of the traction propulsion system and other equipment that has been installed at the KTX-II will be secured.

  • PDF

Test and evaluation on the suitability of operating high speed train in electrified conventional line through test run of HSR-350x (한국형 고속열차를 활용한 기존선 전철화 구간에서 고속열차 운행의 적합성 평가)

  • Mok, Jin-Yong;Kim, Young-Guk;Kim, Ki-Hwan;Cho, Min-Young
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.229-235
    • /
    • 2007
  • The KTX, which have opened the revenue service in April 2004, is operating in Kyoung-Bu high-speed line and electrified conventional Ho-Nam line, and the more the electrification are enlarged, the more the requirement of operating of high speed train would be increased. In this paper, the result of test run and evaluation on the suitability of operating high speed train in electrified conventional line between Dae-jeon and East Dae-gu was reviewed. Evaluation and analysis was executed in specific categories, such as operation & running performance of the train considering vibration characteristics based on UIC 518, ride comfort and current collection, and response sensitivity of ATS device for signalling from track facility. The result of this running test was evaluated and considered as a good practice for revenue operation of high speed train in electrified conventional line between Dae-jeon and Dae-gu.

  • PDF

A Design Methodology on Signal Paths for Enhanced Signal Integrity of High-speed Communication System and a BIST Design for Backplane Boards Testing (고속 통신 시스템의 신호충실성 향상을 위한 선로 설계 방법론 및 Backplane Boards Testing를 위한 BIST 설계)

  • Jang, Jong-Gwon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.4
    • /
    • pp.1263-1270
    • /
    • 2000
  • The operation frequency of High-speed Communication System becomes very fast with the advanced technology of VLSI chips and system implementation. There may exist various types of noise sources degrading the signal integrity in this system. The present main system is made of backplane, so faults can be brought whenever a board is removed, replaced or added. This backplane boards testing is a very important process to verify the operation of system. firstly, we model the effects of the internal noises in the High-speed Communication System to the signal line and propose a new design method to minimize these effects. For the design methodology, we derive the characterization value for each mode land them construct the optimal simulation model. We compare the result of own proposing method with that fo the existing methods, through simulation and show that the quality of High-speed Communication System is significantly enhanced. Secondary our proposing BIST for the Backplane Boards Testing is designed to guarantee that there is no fault in the high-speed communication system.

  • PDF

Research for possible Service Interval of High Speed KTX train in conventional KyoungBu-Line (기존 경부선 구간의 고속열차 운행가능시격에 대한 연구)

  • Lee, Chang-Mu;Kim, Joo-Rak;Lee, Han-Min;Oh, Se-Chan;Kim, Gil-Dong
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1461-1467
    • /
    • 2006
  • In case of accidents at the line of Seoul-Pusan high speed railway, high speed train should be operated with making a detour by using existing Seoul-Pusan railroad. For Dae-jeon$\sim$Dae-Gu section which has fragile structures, following points are investigated. In operating existing train, train running time is analyzed by the case of only high speed train being in service and the case of high speed train being in service on condition that existing train is operated. Also the possibility about operation on present train headway and train headway that is applicable to operation and vocational problems would be examined.

  • PDF

Suppression method for current oscillation of V/F controlled high speed induction motor (V/F 제어 고속 유도전동기의 전류 진동 억제 방법)

  • Lee, Jin-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2017.07a
    • /
    • pp.150-151
    • /
    • 2017
  • This paper deals with the suppression of subharmonic current oscillation of V/F controlled high speed induction motor drive in turbo blower applications. High speed induction motor has a relatively low stator impedance for high speed operation and therefore the dc link voltage ripple may result in subharmonic current oscillation at the steady state in high speed operation. This paper shows that the subharmonic oscillation is caused by the dc link voltage ripple and also proposes the suppression method, which generates the compensation voltage through the proportional current controller to reduce the subharmonic current oscillation. The simulation and experimental results show that the proposed suppression method reduces the subharmonic current oscillation to the acceptable low level in turbo blower applications.

  • PDF