Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Citic Tower Construction Key Technology

  • Xu, Lishan
    • 국제초고층학회논문집
    • /
    • 제8권3호
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

OWAS기법을 활용한 초고층 코어월 공사의 근로자 작업자세 분석 (Working Posture Analysis Using OWAS method of Core Wall Construction in High-rise Building)

  • 이준혁;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2016
  • Working Posture is an important factor directly connected with quality and productivity of the construction project. In particular, High-rise building construction is required to manage the working posture due to the repetitive task and unfavorable working condition such as high place work, limited space. However existing construction planning of high-rise building construction has a negative effect on the labor's productivity because it is not insufficiently considered for working posture. Therefore the purpose of this study is to suggest a work that needs improvement by analyzing labor's working posture quantitatively using OWAS method. These results would provide the basic information to improve the productivity of the construction project by supporting the construction plan considering the working posture in high-rise building.

  • PDF

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • 국제초고층학회논문집
    • /
    • 제10권3호
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

초고층 건설공사 시공단계 리스크 요인 도출 및 분석 (Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project)

  • 김수용;김성현;양진국
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.90-98
    • /
    • 2016
  • 고층 건설 프로젝트는 다양한 위험 요인이 있다. 주요 위험 요인은 시간 지연과 비용의 증가 등의 부정적인 결과이다. 따라서, 본 연구는 PROMETHEE 기법을 사용하여 초고층 건설공사 시공 단계에서의 위험 요인을 분석하였다. 이를 위해, 본 연구는 전문가 표적집단면접법(FGI)을 통해 위험 인자를 확인 하였다. 그리고 PROMETHEE는 초고층 건설공사 위험 분석을 위한 설정 평가기준으로 사용 하였다. 다음으로, 평가지표 계산의 기준은 PDRI에서 정의 레벨을 사용하여 구성하였다. 선호지수 및 평가 지표는 설문을 통해 규명되었다. 이러한 과정을 통해, PROMETHEE 기법을 이용하여 본 연구는 초고층 건설공사 시공 리스크의 중요도를 산정하였다. 그 결과, 높은 수준의 위험 요인은 다음과 같이 나타났다. 이것은 '재료 리프팅 운영 계획', '아웃리거 벨트 트러스 건설', '고층 건물의 기초 작업 계획'과 '고층 건물의 구조 개념을 고려'이다.

초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구 (A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings)

  • 김상환;최원철;김주형;김재준
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구 (Comparative Study of Strength and Weakness of System Form in High-rise Building Project)

  • 박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

초고층 복합시설물의 4D CAD 모델링 사례연구 (Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project)

  • 권오성;박우열;조훈희;강경인
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.187-192
    • /
    • 2001
  • 국내 건설생산체계는 설계단계에 시공성의 반영이 어려워 시공단계에서 많은 시행착오와 잦은 선계변경이 요구되고 있다 특히 불확실성이 높은 도심지 건축될, 그 중에서도 초고층 복합 건물 프로젝트의 경우, 시공과정을 반영한 설계의 중요성은 더욱 중요한 요소가 된다. 본 연구에서는 국내 정보분류체계를 근간으로 기초조사를 통하여 현장의 시공계획에 필요한 데이터를 수집 이를 시스템화 할 수 있는 방안을 모색하였다. 또한, 이를 본 시스템에 적용하여 3D CAD와 공사 계획 및 시뮬레이션 시스템으로 공정 시뮬레이션 및 타워 크레인 시뮬레이션을 구현하여 초고층 공사 수행시 발생할 수 있는 문제점을 미리 검토 및 해결하여 초고층 프로젝트 공사의 합리화와 생산성 향상을 위한 공사관리시스템을 실제 프로젝트에 구현하였다.

  • PDF

Multi-Dimensional Hybrid Design and Construction of Skyscraper Cluster -Innovative Engineering of Raffles City Chongqing-

  • Wang, Aaron J.
    • 국제초고층학회논문집
    • /
    • 제6권3호
    • /
    • pp.261-269
    • /
    • 2017
  • Designed by star architect of Moshes Safdie, Raffles City Chongqing includes a total of 6 mega high-rise towers 250 to 380 m tall, a sky conservatory, a 5-storey high shopping mall and a 3-storey basement car parking. Located at the confluence of the Yangtze and Jailing Rivers, the site for the project is imbued with a significance that is immediately symbolic, both as a sign of Chongqing's important past and as a vivid indicator of the city's thriving present and future. The design for the project to be situated at this gateway takes as its governing idea the image of powerful sails upon the water. The outer facades of the project's eight towers - the transparent surfaces that will face the water to the north - are meant to recall a fleet of ancient Chinese ships, with their huge rectangles of white canvas filled by the wind. This is a $1.13million\;m^2$ mega scale integrated project of office, retail, hotel, service residence and high-end residence with the transportation hub and traffic circulation at various levels of the project. This paper presents the multi-dimensional hybrid design, engineering and construction of this mega scale project. The innovations and the cutting-edge technology used in this project are introduced and discussed benchmarking the design and construction of the skyscraper cluster in a major city like Chongqing of China.

초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석 (An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project)

  • 김남균;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.73-83
    • /
    • 2013
  • 최근 국내 외 대도시를 중심으로, 글로벌 경제 위기와 부동산 경기 침체로 중단되거나 연기되었던 초고층 프로젝트들이 재개되고 있으며, 이를 수주하기 위한 건설사들의 경쟁은 전보다 더욱 치열해지고 있다. 국내 건설사들이 초고층 건축 분야에서 경쟁력을 높이기 위해서는, 전체 프로젝트의 근간이 되는 중요한 요소인 양중계획의 체계적인 리스크 관리가 반드시 수반되어야 하지만, 여전히 개인적 경험에 의존하여 작성 된, 양중계획의 오류로 인한, 현장 전체의 공기 지연 및 원가 관리 실패의 문제가 빈번하게 발생하고 있다. 따라서 본 연구에서는, 양중계획의 정확성을 높이기 위한 방안으로, 현행 양중계획 체계의 문제점을 분석하고, 계획 요소에 따라 실패 유형을 도출하였으며, 각 실패 유형이 전체 프로젝트의 공정, 원가, 안전관리에 미치는 영향도를 분석하였다. 또한 양중 장비별 세부 리스크 요인을 분석하고, 이를 바탕으로 FMEA 기법을 적용하여 초고층 프로젝트 양중계획의 핵심 리스크 요인을 도출하였다.