• Title/Summary/Keyword: High-power reactors

Search Result 149, Processing Time 0.026 seconds

Role of Radio Frequency and Microwaves in Magnetic Fusion Plasma Research

  • Park, Hyeon K.
    • Journal of electromagnetic engineering and science
    • /
    • v.17 no.4
    • /
    • pp.169-177
    • /
    • 2017
  • The role of electromagnetic (EM) waves in magnetic fusion plasma-ranging from radio frequency (RF) to microwaves-has been extremely important, and understanding of EM wave propagation and related technology in this field has significantly advanced magnetic fusion plasma research. Auxiliary heating and current drive systems, aided by various forms of high-power RF and microwave sources, have contributed to achieving the required steady-state operation of plasmas with high temperatures (i.e., up to approximately 10 keV; 1 eV=10000 K) that are suitable for future fusion reactors. Here, various resonance values and cut-off characteristics of wave propagation in plasmas with a nonuniform magnetic field are used to optimize the efficiency of heating and current drive systems. In diagnostic applications, passive emissions and active sources in this frequency range are used to measure plasma parameters and dynamics; in particular, measurements of electron cyclotron emissions (ECEs) provide profile information regarding electron temperature. Recent developments in state-of-the-art 2D microwave imaging systems that measure fluctuations in electron temperature and density are largely based on ECE. The scattering process, phase delays, reflection/diffraction, and the polarization of actively launched EM waves provide us with the physics of magnetohydrodynamic instabilities and transport physics.

Effect of DUPIC Cycle on CANDU Reactor Safety Parameters

  • Mohamed, Nader M.A.;Badawi, Alya
    • Nuclear Engineering and Technology
    • /
    • v.48 no.5
    • /
    • pp.1109-1119
    • /
    • 2016
  • Although, the direct use of spent pressurized water reactor (PWR) fuel in CANda Deuterium Uranium (CANDU) reactors (DUPIC) cycle is still under investigation, DUPIC cycle is a promising method for uranium utilization improvement, for reduction of high level nuclear waste, and for high degree of proliferation resistance. This paper focuses on the effect of DUPIC cycle on CANDU reactor safety parameters. MCNP6 was used for lattice cell simulation of a typical 3,411 MWth PWR fueled by $UO_2$ enriched to 4.5w/o U-235 to calculate the spent fuel inventories after a burnup of 51.7 MWd/kgU. The code was also used to simulate the lattice cell of CANDU-6 reactor fueled with spent fuel after its fabrication into the standard 37-element fuel bundle. It is assumed a 5-year cooling time between the spent fuel discharges from the PWR to the loading into the CANDU-6. The simulation was carried out to calculate the burnup and the effect of DUPIC fuel on: (1) the power distribution amongst the fuel elements of the bundle; (2) the coolant void reactivity; and (3) the reactor point-kinetics parameters.

Management of Spent Ion-Exchange Resins From Nuclear Power Plant by Blending Method

  • Kamaruzaman, Nursaidatul Syafadillah;Kessel, David S.;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.1
    • /
    • pp.65-82
    • /
    • 2018
  • With the significant increase in spent ion-exchange resin generation, to meet the requirements of Waste Acceptance Criteria (WAC) of the Wolsong disposal facility in Korea, blending is considered as a method for enhancing disposal options for intermediate level waste from nuclear reactors. A mass balance formula approach was used to enable blending process with an appropriate mixing ratio. As a result, it is estimated around 44.3% of high activity spent resins can be blended with the overall volume of low activity spent resins at a 1:7.18 conservative blending ratio. In contrast, the reduction of high activity spent resins is considered a positive solution in reducing the amount of spent resins stored. In an economic study, the blending process has been proven to lower the disposal cost by 10% compared to current APR1400 treatment. Prior to commencing use of this blending method in Korea, coordinated discussion, and safety and health assessment should be undertaken to investigate the feasibility of fitting this blending method to national policy as a means of waste predisposal processing and management in the future.

High heat flux limits of the fusion reactor water-cooled first wall

  • Zacha, Pavel;Entler, Slavomir
    • Nuclear Engineering and Technology
    • /
    • v.51 no.5
    • /
    • pp.1251-1260
    • /
    • 2019
  • The water-cooled WCLL blanket is one of the possible candidates for the blanket of the fusion power reactors. The plasma-facing first wall manufactured from the reduced-activation ferritic-martensitic steel Eurofer97 will be cooled with water at a typical pressurized water reactor (PWR) conditions. According to new estimates, the first wall will be exposed to peak heat fluxes up to $7MW/m^2$ while the maximum operated temperature of Eurofer97 is set to $550^{\circ}C$. The performed analysis shows the capability of the designed flat first wall concept to remove heat flux without exceeding the maximum Eurofer97 operating temperature only up to $0.75MW/m^2$. Several heat transfer enhancement methods (turbulator promoters), structural modifications, and variations of parameters were analysed. The effects of particular modifications on the wall temperature were evaluated using thermo-hydraulic three-dimensional numerical simulation. The analysis shows the negligible effect of the turbulators. By the combination of the proposed modifications, the permitted heat flux was increased up to $1.69MW/m^2$ only. The results indicate the necessity of the re-evaluation of the existing first wall concepts.

POTENTIAL APPLICATIONS FOR NUCLEAR ENERGY BESIDES ELECTRICITY GENERATION: A GLOBAL PERSPECTIVE

  • Gauthier, Jean-Claude;Ballot, Bernard;Lebrun, Jean-Philippe;Lecomte, Michel;Hittner, Dominique;Carre, Frank
    • Nuclear Engineering and Technology
    • /
    • v.39 no.1
    • /
    • pp.31-42
    • /
    • 2007
  • Energy supply is increasingly showing up as a major issue for electricity supply, transportation, settlement, and process heat industrial supply including hydrogen production. Nuclear power is part of the solution. For electricity supply, as exemplified in Finland and France, the EPR brings an immediate answer; HTR could bring another solution in some specific cases. For other supply, mostly heat, the HTR brings a solution inaccessible to conventional nuclear power plants for very high or even high temperature. As fossil fuels costs increase and efforts to avoid generation of Greenhouse gases are implemented, a market for nuclear generated process heat will be developed. Following active developments in the 80's, HTR have been put on the back burner up to 5 years ago. Light water reactors are widely dominating the nuclear production field today. However, interest in the HTR technology was renewed in the past few years. Several commercial projects are actively promoted, most of them aiming at electricity production. ANTARES is today AREVA's response to the cogeneration market. It distinguishes itself from other concepts with its indirect cycle design powering a combined cycle power plant. Several reasons support this design choice, one of the most important of which is the design flexibility to adapt readily to combined heat and power applications. From the start, AREVA made the choice of such flexibility with the belief that the HTR market is not so much in competition with LWR in the sole electricity market but in the specific added value market of cogeneration and process heat. In view of the volatility of the costs of fossil fuels, AREVA's choice brings to the large industrial heat applications the fuel cost predictability of nuclear fuel with the efficiency of a high temperature heat source tree of Greenhouse gases emissions. The ANTARES module produces 600 MWth which can be split into the required process heat, the remaining power drives an adapted prorated electric plant. Depending on the process heat temperature and power needs, up to 80% of the nuclear heat is converted into useful power. An important feature of the design is the standardization of the heat source, as independent as possible of the process heat application. This should expedite licensing. The essential conditions for success include: ${\bullet}$ Timely adapted licensing process and regulations, codes and standards for such application and design ${\bullet}$ An industry oriented R&D program to meet the technological challenges making the best use of the international collaboration. Gen IV could be the vector ${\bullet}$ Identification of an end user(or a consortium of) willing to fund a FOAK

DEVELOPMENT OF THE DUAL COUNTING AND INTERNAL DOSE ASSESSMENT METHOD FOR CARBON-14 AT NUCLEAR POWER PLANTS

  • Kim, Hee-Geun;Kong, Tae-Young;Han, Sang-Jun;Lee, Goung-Jin
    • Journal of Radiation Protection and Research
    • /
    • v.34 no.2
    • /
    • pp.55-64
    • /
    • 2009
  • In a pressurized heavy water reactor (PHWR), radiation workers who have access to radiation controlled areas submit their urine samples to health physicists periodically; internal radiation exposure is evaluated by the monitoring of these urine samples. Internal radiation exposure at PHWRs accounts for approximately 20 $\sim$ 40% of total radiation exposure; most internal radiation exposure is attributed to tritium. Carbon-14 is not a dominant nuclide in the radiation exposure of workers, but it is one potential nuclide to be necessarily monitored. Carbon-14 is a low energy beta emitter and passes relatively easily into the body of workers by inhalation because its dominant chemical form is radioactive carbon dioxide ($^{14}CO_2$). Most inhaled carbon-14 is rapidly exhaled from the worker's body, but a small amount of carbon-14 remains inside the body and is excreted by urine. In this study, a method for dual analysis of tritium and carbon-14 in urine samples of workers at nuclear power plants is developed and a method for internal dose assessment using its excretion rate result is established. As a result of the developed dual analysis of tritium and carbon-14 in urine samples of radiation workers who entered the high radiation field area at a PHWR, it was found that internal exposure to carbon-14 is unlikely to occur. In addition, through the urine counting results of radiation workers who participated in the open process of steam generators, it was found that the likelihood of internal exposure to either tritium or carbon-14 is extremely low at pressurized water reactors (PWRs).

Performance of different absorber materials and move-in/out strategies for the control rod in small rod-controlled pressurized water reactor: A study based on KLT-40 model

  • Zhiqiang Wu;Jinsen Xie;Pengyu Chen;Yingjie Xiao;Zining Ni;Tao Liu;Nianbiao Deng;Aikou Sun;Tao Yu
    • Nuclear Engineering and Technology
    • /
    • v.56 no.7
    • /
    • pp.2756-2766
    • /
    • 2024
  • Small rod-controlled pressurized water reactors (PWR) are the ideal energy source for vessel propulsion, benefiting from their high reactivity control efficiency. Since the control rods (CRs) increase the complexity of reactivity control, this paper seeks to study the performance of CRs in small rod-controlled PWRs to extend the lifetime and reduce power offset due to CRs. This study investigates CR grouping, move-in/out strategies, and axially non-uniform design effects on core neutron physics metrics. These metrics include axial offset (AO), core lifetime (CL), fuel utilization (FU), and radial power peaking factor (R-PPF). To simulate the movement of the CRs, a "Critical-CR-burnup" function was developed in OpenMC. In CR designs, the CRs are grouped into three banks to study the simultaneous and prioritized move-in/out strategies. The results show CL extension from 590 effective full power days (EFPDs) to 638-698 EFPDs. A lower-worth prioritized strategy minimizes AO and the extremum values decrease from -0.69 and + 0.81 to -0.28 and + 0.51. Although an axially non-uniform CR design can improve AO at the beginning of cycle (BOC), considering the overall CR worth change is crucial, as a significant decrease can adversely impact axial power distribution during the middle of cycle (MOC).

Estimation of Uranium Requirements Based on Future Reactor Strategies

  • Hahn, Do-Hee;Chung, Chang-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.22-35
    • /
    • 1981
  • The U$_3$O$_{8}$ requirements are estimated for the high, intermediate, and low growth projections of nuclear power in Korea. To each projection, four illustrative reactor-mix strategies and four fuel cycle options are applied for estimating the requirements. The reactor types considered are PWR, PHWR. and FBR. The fuel cycles considered are once-through cycle, U/Pu recycle, and improved once-through cycle. Also the amount of Pu-fissile recovered from U recycle is estimated. The maximum cumulative (to the year 2000) requirements of U$_3$O$_{8}$ occupy about 4 to 5 percent of the WOCA requirements and are about 23 times larger than the U$_3$O$_{8}$ resources in Korea. For the high nuclear power growth projection, the cumulative amount of Pu-fissile recovered from U recycle is sufficient for the startup of 2 units of 1200 MWe fast reactors by the year 2000. 2000.

  • PDF

A NEW High Efficiency Soft-Switching Three-Phase PWM Rectifier (새로운 고효율 소프트 스위칭 3상 PWM 정류기)

  • Mun Sang-Pil;Suh Ki-Young;Lee Hyun-Woo;Kwon Soon-Kurl
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.42 no.2 s.302
    • /
    • pp.49-58
    • /
    • 2005
  • A new soft switching three-phase PWM rectifier with simple circuit configuration and high efficiency has been developed. The proposed circuit is a kind of the auxiliary resonant commutated Pole(ARCP)converter The conventional ARCP converter requires three-auxiliary reactors and six-auxiliary switches for the soft switching auxiliary circuit and for these switching elements, a gate drive circuit and a control circuit are required, resulting in high part as a disadvantage. In the main circuit proposed in this paper, the auxiliary soft switching circuit is composed of two-auxiliary reactors, two-auxiliary switches and several diodes. In addition, common use of the PWM control circuit for two-switches will make the control circuit of the auxiliary switches simple. By means of function of the soft switching auxiliary circuit, the main switching element performs zero voltage switching operation and the auxiliary switches perform the zero current switching. In this paper, the circuit configuration and the operational analysis of the proposed circuit are described at first and then, experimental results will be reported. By using a prototype with 5[kW] capacity, the conversion efficiency of maximum $98.8[\%]$ and the power factor of $99[\%]$ or higher were obtained.

Vulnerability Analysis on a VPN for a Remote Monitoring System

  • Kim Jung Soo;Kim Jong Soo;Park Il Jin;Min Kyung Sik;Choi Young Myung
    • Nuclear Engineering and Technology
    • /
    • v.36 no.4
    • /
    • pp.346-356
    • /
    • 2004
  • 14 Pressurized Water Reactors (PWR) in Korea use a remote monitoring system (RMS), which have been used in Korea since 1998. A Memorandum of Understanding on Remote Monitoring, based on Enhanced Cooperation on PWRs, was signed at the 10th Safeguards Review Meeting in October 2001 between the International Atomic Energy Agency (IAEA) and Ministry Of Science and Technology (MOST). Thereafter, all PWR power plants applied for remote monitoring systems. However, the existing method is high cost (involving expensive telephone costs). So, it was eventually applied to an Internet system for Remote Monitoring. According to the Internet-based Virtual Private Network (VPN) applied to Remote Monitoring, the Korea Atomic Energy Research Institute (KAERI) came to an agreement with the IAEA, using a Member State Support Program (MSSP). Phase I is a Lab test. Phase II is to apply it to a target power plant. Phase III is to apply it to all the power plants. This paper reports on the penetration testing of Phase I. Phase I involved both domestic testing and international testing. The target of the testing consisted of a Surveillance Digital Integrated System (SDIS) Server, IAEA Server and TCNC (Technology Center for Nuclear Control) Server. In each system, Virtual Private Network (VPN) system hardware was installed. The penetration of the three systems and the three VPNs was tested. The domestic test involved two hacking scenarios: hacking from the outside and hacking from the inside. The international test involved one scenario from the outside. The results of tests demonstrated that the VPN hardware provided a good defense against hacking. We verified that there was no invasion of the system (SDIS Server and VPN; TCNC Server and VPN; and IAEA Server and VPN) via penetration testing.