• Title/Summary/Keyword: High-performance train

Search Result 585, Processing Time 0.027 seconds

Design and Performance Study of Propulsion System for Korean High Speed Train (한국형 고속전철의 추진시스템 설계 및 성능 연구)

  • 박광복;김현철
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.349-358
    • /
    • 1998
  • This study was carried out about the design and the performance study of propulsion system for Korean High Speed Train of maximum operating speed of 350km/h. The propulsion system was studied to two parts the formation of power transmission and the performance of traction system base on Korean-TGV. For maximum operating speed of 350km/h at Seoul-Pusan high speed line, the power of train should be have the remaining acceleration of 0.058m/s/s and the slopeability of 6%o. This performance study of propulsion system would be continued for defining of adhesion factor, friction factor and aerodynamic factor assumed to analysis and simulation.

  • PDF

A Study on Performance Characteristic of Electric Equipments for High Speed Train by on-Line Test (시운전시험을 통한 고속전철 전장품의 성능 특성)

  • Han Young-Jae;Kim Seog-Won;Kim Gi-Hwan;Han Seong-Ho;Lee Su-Gil;Kim Jong-Young;Kno Ae-Suk
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1404-1407
    • /
    • 2004
  • An electric railway system is composed of high-tech subsystems, among which main electric equipments such as transformers, converter and traction motors are critical components determining the performance of rolling stock. We developed a measurement system for on-line test and evaluation of performances of Korean High Speed Train. The measurement system is composed of software part and hardware part. Perfect interface between multi-users is possible. A new method to measure temperature was applied to the measurement system. By using the system, measurement and evaluation for the performance of electric equipments in Korean High Speed Train was conducted during test running.

  • PDF

Research on Transition of Road Bed of Wuhan-Guangzhou Passenger Line and Bridge

  • Kang, Bo-Soon;Jun, Yang
    • International Journal of Railway
    • /
    • v.2 no.4
    • /
    • pp.180-186
    • /
    • 2009
  • High speed railway challenge the design, construction and maintaining of traditional railway, many traditional design concepts have been changed. Transition of railway and bridge has two main problems. one is that different lines have different ability of resisting distortion in area of trial load, which was known that problem of smooth transition of stiffness, the other is that differential settlement between artificial structure and earth structure cause bending of railway. The two problems have effect on train moving. The principle of processing transition of railway and bridge is same in world, but it is difficult to find relationship between design standard of transition, vehicle performance, line standard, design speed and so on form documentation and data reports. Based on mechanics, the paper analyzed dynamic performance of transition of high speed railway, studied various rough elements which is effective to train moving, built mathematical model of interaction of train and transition of high speed railway and developed numerical simulation software. In various different work conditions, we did great quantity of numerical simulation, comprehensive analysis and performance analysis.

  • PDF

Design and Control of Levitation and Guidance Systems for a Semi-High-Speed Maglev Train

  • Kim, Min;Jeong, Jae-Hoon;Lim, Jaewon;Kim, Chang-Hyun;Won, Mooncheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.117-125
    • /
    • 2017
  • Research on Maglev (Magnetic Levitation) train is currently being conducted in Korea, concerning Urban Transit (110 km/h of maximum speed), semi-high-speed (200 km/h of maximum speed), and high-speed (550 km/h of maximum speed) trains. This paper presents a research study on the levitation and guidance systems for the Korean semi-high-speed maglev train. A levitation electromagnet was designed, and the need for a separate guidance system was analyzed. A guidance electromagnet to control the lateral displacement of the train and ensure its stable operation was then also designed, and its characteristics were analyzed. The dynamic performance of the designed levitation and guidance electromagnets was modeled and analyzed, using a linearized modeling of the system equations of motion. Lastly, a test setup was prepared, including manufactured prototypes of the designed system, and the validity of the design was verified and examined with performance evaluation tests.

A Study on Optimization of the Overall Measurement System for HEMU-400X (차세대고속열차 종합계측시스템 최적화 방안 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Lee, Jin-Jong;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1-6
    • /
    • 2011
  • In Korea, high-speed train(HEMU-400X) system with distributed power is being developed, and the highest test speed of this train is 400km/h. This developed the first high-speed train as a distributed power train in Korea, as well as for the development of train system and evaluation system included evaluation technology is needed. Accordingly, a comprehensive and efficient OMS(Overall Measurement System) was build up for verifying the performance of HEMU-400X. By the case study of the G7 and TTX, OMS of HEMU-400X was improved the test performance and maintainability. In particular, the existing Window-based systems has a limit to the control, due to this reason OMS applying enhanced RT(Real-time) system. In this study, compare the advantages and disadvantages of RT systems with Window-based systems, as well as the configuration of the RT systems.

  • PDF

Test and Evaluation of the Pantograph for Korean High Speed Train (한국형 고속전철 집전장치의 성능 계측 및 평가)

  • 서승일;박춘수;조용현;최강윤;목진용
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.2
    • /
    • pp.94-99
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed by home-grown technology. In this study, test and evaluation of the current collection performance of the pantograph is conducted. For this purpose, a measuring system is developed and installed on the prototype high speed train. Measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing system. It monitors the hazard behavior of the pantograph and measures acceleration and vertical force of the pan head. By applying the measuring system, accurate evaluation of the performance of the pantograph and safety assessment of the interface system of pantograph and catenary is facilitated.

Design of Train Driving Simulator (철도차량 운전자교육을 위한 훈련용 시뮬레이터의 설계)

  • Lee Ji-Sun;Park Sung-Ho;Choi Jong-Muk
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.175-180
    • /
    • 2005
  • As the high performance computer system increases, improving of reality and usefulness causes the virtual environment of simulator to be used widely as training and assessment tool. Although some domestic companies have developed train driving simulators since about mid of 1990s, accumulation of technology and experience is not yet sufficient compared to foreign makers. This paper describes system composition, training and assessment regimes for high level train driving simulator. When the subsystems are designed, comprehension of train system is emphasized and the functions that simulator should provide are discussed.

  • PDF

Numerical study on the effect of three-dimensional unsteady tunnel entry flow characteristics on the aerodynamic performance of high-speed train (터널진입시 비정상 유동특성이 고속전철의 공력성능에 미치는 영향에 관한 수치해석적 연구)

  • 정수진;김태훈;성기안
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.596-606
    • /
    • 2002
  • The three-dimensional unsteady compressible Euler equation solver with ALE, CFD code, PAM-FLOW based on FEM method has been applied to analyze the flow field around the high speed train which is entering into a channel. From the present study, the pressure and flow transients were calculated and analyzed. The generation of compression wave was observed ahead of train and the high pressure in the gap between the train and the tunnel was also found due to the blockage effects. It was found that abrupt fluctuation in pressure exists in the region from train nose to shoulder of train corresponding to 10% of total length of train during tunnel entry. Computed time history of aerodynamic forces of train during tunnel entry show that drag coefficient rapidly rises and saturates at about non-dimensional time 0.31. The total increase of drag coefficient before and after tunnel entry is about 1.1%. Transient profile of lift force shows similar pattern to drag coefficient except abrupt drop after saturation and lift force in the tunnel increases 0.08% more than that before tunnel entry.

Test and evaluation on the suitability of operating high speed train in electrified conventional line through test run of HSR-350x (한국형 고속열차를 활용한 기존선 전철화 구간에서 고속열차 운행의 적합성 평가)

  • Mok, Jin-Yong;Kim, Young-Guk;Kim, Ki-Hwan;Cho, Min-Young
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.229-235
    • /
    • 2007
  • The KTX, which have opened the revenue service in April 2004, is operating in Kyoung-Bu high-speed line and electrified conventional Ho-Nam line, and the more the electrification are enlarged, the more the requirement of operating of high speed train would be increased. In this paper, the result of test run and evaluation on the suitability of operating high speed train in electrified conventional line between Dae-jeon and East Dae-gu was reviewed. Evaluation and analysis was executed in specific categories, such as operation & running performance of the train considering vibration characteristics based on UIC 518, ride comfort and current collection, and response sensitivity of ATS device for signalling from track facility. The result of this running test was evaluated and considered as a good practice for revenue operation of high speed train in electrified conventional line between Dae-jeon and Dae-gu.

  • PDF

A Study on the estimation of transport demand in accordance with the changed operating environment of high speed train (고속열차 운행 환경변화에 따른 수송수요예측 연구)

  • Kim, Ick-Hee;Lee, Kyung-Tae;Yang, You-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.721-729
    • /
    • 2009
  • Recently, there has been growing necessity to estimate the future travel demand of high speed train because the circumstance of high speed train service is rapidly changing with the launching of 2011 second stage of Gyeongbu high speed railway(Dongdaegu-Busan) and the completion of 2014 first stage of Honam high speed railway(Yongsan-Gwangju), etc. This study was designed to estimate future travel demand by analyzing the transport performance and train service characteristics of Gyeongbu and Honam line. This study presents the maximum load section and the changed future travel demand, which will be applied to establish a train operation plan.

  • PDF