Design of type 316L stainless steel 700 ℃ high-temperature piping

  • Hyeong-Yeon Lee;Hyeonil Kim;Jaehyuk Eoh
    • Nuclear Engineering and Technology
    • /
    • v.55 no.10
    • /
    • pp.3581-3590
    • /
    • 2023
  • High-temperature design evaluations were conducted on Type 316L stainless steel piping for a 700 ℃ large-capacity thermal energy storage verification test loop (TESET) under construction at KAERI. The hot leg piping with sodium coolant at 700 ℃ connects the main components of the loop heater, hot storage tank, and air-to-sodium heat exchanger. Currently, the design rules of ASME B31.1 and RCC-MRx provide design procedures for high-temperature piping in the creep range for Type 316L stainless steel. However, the design material properties around 700 ℃ are not available in those rules. Therefore, a number of material tests, including creep tests at various temperatures, were conducted to determine the insufficient material properties and relevant design coefficients so that high-temperature design on the 700 ℃ piping may be possible. It was shown that Type 316L stainless steel can be used in a 700 ℃ high-temperature piping system of Generation IV reactor systems or a renewable energy systems, such as thermal energy storage systems, for a limited operation time.

Technology of Inspection and Real-time Displacement Monitoring on Critical Pipe for Power Plant (발전용 고온 배관의 점검 및 실시간 변위감시 기술)

  • Hyun, Jung-Seob;Heo, Jae-Sil;Cho, Sun-Young;Heo, Jeong-Yeol;Lee, Seong-Kee
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.33 no.10
    • /
    • pp.1177-1186
    • /
    • 2009
  • High temperature steam pipes of thermal power plant are subject to a severe thermal range and usually operates well into the creep range. Cyclic operation of the plant subjects the piping system to mechanical and thermal fatigue damages. Also, poor or malfunctional supports can impose massive loads or stress onto the piping system. In order to prevent the serious damage and failure of the critical piping system, various inspection methods such as visual inspection, computational analysis and on-line piping displacement monitoring were developed. 3-dimensional piping displacement monitoring system was developed with using the aluminum alloy rod and rotary encoder sensors, this system was installed and operated on the high temperature steam piping of "Y" thermal power plant successfully. It is expected that this study will contribute to the safety of piping system, which could minimize stress and extend the actual life of critical piping.

Prediction of Creep Stress in High Temperature Piping System Using Elastic Follow-up Factor (탄성추종계수를 이용한 고온 배관계의 크리프 응력 예측)

  • Seo, Jun-Min;Youn, Gyo-Geun;Lee, Hyun-Jae;Oh, Young-Jin;Kim, Yun-Jae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.14 no.1
    • /
    • pp.32-37
    • /
    • 2018
  • When designing high temperature piping system, creep phenomena must be considered. Since ASME code does not provide detailed methods of design by rule (DBR) for high temperature piping, Finite element analysis should be performed. However, In the case of piping system with frequent design changes, creep analysis of the entire piping system for every change is ineffective and practically impossible. Therefore, based on elastic and elastic-plastic analysis, which takes a relatively short time, the creep stress is predicted by using elastic follow-up factor method provided in R5 code and plastic-creep analogy presented by Hoff. The predicted creep stress for a virtual piping system was compared with the creep analysis result and the two results showed similar stress relaxation tendency in time.

Thermal stress analysis for high pressure and temperature pipelines in ultra steam turbine (UST) system

  • Choi, Dae-keon
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.52 no.2
    • /
    • pp.19-24
    • /
    • 2015
  • A reliable assessment and analysis of the condition of high pressure and temperature steam pipelines requires defining stress state, which will take into consideration not just the impact of internal pressure and temperature but all applied loads. For that, usage of modeling and numerical methods for calculation and analysis of stress state is essential. The main aim of piping stress analysis is to check the design of piping layout, which will allow simple, efficient and economical piping supports and provide flexibility to the piping system for loads and stresses. The piping stress analysis is carried out using CAESER II software. By using this software we can evaluate stresses, stress ratios, flange condition, support loads, element forces and displacements at each node and points. In this paper, only the maximum and minimum displacement results are tabulated, which is also shown in detail by an example of main steam pipelines of UST Main Engine System [1].

Thin-Plate-Type Embedded Ultrasonic Transducer Based on Magnetostriction for the Thickness Monitoring of the Secondary Piping System of a Nuclear Power Plant

  • Heo, Taehoon;Cho, Seung Hyun
    • Nuclear Engineering and Technology
    • /
    • v.48 no.6
    • /
    • pp.1404-1411
    • /
    • 2016
  • Pipe wall thinning in the secondary piping system of a nuclear power plant is currently a major problem that typically affects the safety and reliability of the nuclear power plant directly. Regular in-service inspections are carried out to manage the piping system only during the overhaul. Online thickness monitoring is necessary to avoid abrupt breakage due to wall thinning. To this end, a transducer that can withstand a high-temperature environment and should be installed under the insulation layer. We propose a thin plate type of embedded ultrasonic transducer based on magnetostriction. The transducer was designed and fabricated to measure the thickness of a pipe under a high-temperature condition. A number of experimental results confirmed the validity of the present transducer.

Evaluation of High Cycle Thermal Fatigue on Mixing Tee in Nuclear Power Plant (원전 Mixing Tee에서의 고주기 열피로 평가)

  • Lee, Sun Ki
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.16 no.1
    • /
    • pp.22-29
    • /
    • 2020
  • In nuclear power plants, there is a risk of thermal fatigue in equipment and piping affecting system soundness because the temperature change of the system accompanies in every operation and shutdown. Therefore, in order to prevent the excess of the fatigue limit during the lifetime of plants, the fatigue limit of each piping material is determined in the designing stage. However, there are many cases where equipment or piping is locally subjected to thermal fatigue that is not considered in the design, resulting in damage to the equipment and piping, and failure during operation. Currently, local thermal fatigue generation mechanisms that are not taken into account in the design stage are gradually being identified. In this paper, the effects of the fluid temperature fluctuations on the piping soundness due to the mixing of hot and cold water, one of the local thermal fatigue generating mechanisms, were evaluated.

Development for Life Assessment System for Pipes of Thermal Power Plants

  • Hyun, Jung-Seob;Heo, Jae-Sil;Kim, Doo-Young;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.583-588
    • /
    • 2016
  • The high-temperature steam pipes of thermal power plants are subjected to severe conditions such as creep and fatigue due to the power plant frequently being started up and shut down. To prevent critical pipes from serious damage and possible failure, inspection methods such as computational analysis and online piping displacement monitoring have been developed. However, these methods are limited in that they cannot determine the life consumption rate of a critical pipe precisely. Therefore, we set out to develop a life assessment system, based on a three-dimensional piping displacement monitoring system, which is capable of evaluating the life consumption rate of a critical pipe. This system was installed at the "M" thermal power plant in Malaysia, and was shown to operate well in practice. The results of this study are expected to contribute to the increase safety of piping systems by minimizing stress and extending the actual life of critical piping.

A Study on System Stress Analysis of High Temperature Plant Piping with Expansion Joints and Load Hangers (신축이음과 하중행거가 함께 설치된 고온플랜트 배관계의 시스템응력 해석 연구)

  • Park, Do Jun;Yu, Jong Min;Han, Seung Yeon;Yoon, Kee Bong;Kim, Ji Yoon
    • Journal of Energy Engineering
    • /
    • v.23 no.3
    • /
    • pp.116-124
    • /
    • 2014
  • In the plants operated under high temperature condition, piping system load analysis is often performed to prevent accidents caused by thermal deformation and also to locate inspection prioritity points of the piping system. In this study, piping system stress analysis was performed for a pipe system between the reactors in a process plant. The piping system includes typically installed hangers and expansion joints. In order to evaluate the effects of structural components such as hangers and expansion joints, the case for the expansion joint or the hanger under abnormal operation is considered. By comparison anlaysis results of piping system during normal operation and abnormal operation, the role of each pipe components are studied.

A Study on Thermal Stress of Power Piping due to Loop Design (루프디자인에 따른 배관시스템의 열응력에 관한 연구)

  • Lee, JungHyun;Park, JiSung
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.23 no.5
    • /
    • pp.450-455
    • /
    • 2014
  • Domestic power plants have consistently been developed over the years in industrially developed nations with high standards of living. Considering the power plant development strategy, design efficiency is of upmost importance. Therefore, an improper design directly affects the power plant's risk management plan and the potential risks of the piping system. Therefore, in this study, research is intended to be carried out to allow efficient power plant operation, through optimization of the design of the piping system. The purpose of the study is to confirm economic feasibility by changing the piping loop design, expanding the length of pipe loops, and to investigate the thermal stress influence on the piping system through simulations of systems similar in condition to those currently used in existing plants in Korea.

Evaluation of High Temperature Structural Integrity of Intermediate Heat Exchanger in a Steady State Condition for PGSFR (PGSFR중간열교환기의 정상상태 고온 구조 건전성 평가)

  • Lee, Seong-Hyeon;Koo, Gyeong-Hoi;Kim, Sung-Kyun
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.1
    • /
    • pp.107-114
    • /
    • 2016
  • Four cylindrically shaped IHXs(Intermediate Heat Exchangers) are installed in the PHTS(Primary Heat Transfer System) of the PGSFR(Prototype Gen IV Sodium cooled Fast Reactor). As for the IHX, the temperature difference of structure is inevitable result caused by heat transfer between primary coolant sodium and IHTS(Intermediate Heat Transport System) sodium. It is necessary to evaluate the high temperature structural integrity of IHXs which operate at the elevated temperature condition over the creep temperature. In this paper, the high temperature structural integrity of IHX under assumed loading conditions has been reviewed according to ASME code.