• Title/Summary/Keyword: High energy heat source

Search Result 291, Processing Time 0.024 seconds

Study on the characteristic of heat exchange for vertical geothermal system using the numerical simulation (수치 시뮬레이션을 이용한 수직밀폐형 지열시스템의 채열특성에 관한 연구)

  • Nam, Yu-Jin;Oh, Jin-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.2
    • /
    • pp.66-72
    • /
    • 2014
  • Ground source heat pump system can achieve high efficiency of performance by utilizing annually constant underground temperature to provide heat source for space heating and cooling. Generally, the depth of constant-temperature zone under the ground depends on surface heat flux and soil properties. The deeper the ground heat exchanger is installed, the higher the heat exchange rate can be acquired. However, in order to optimally design the system, it is necessary to consider both the installation cost and the system performance. In this study, performance analysis of ground source heat pump system according to the depth has been conducted through the case study.

Toward residential building energy conservation through the Trombe wall and ammonia ground source heat pump retrofit options, applying eQuest model

  • Ataei, Abtin;Dehghani, Mohammad Javad
    • Advances in Energy Research
    • /
    • v.4 no.2
    • /
    • pp.107-120
    • /
    • 2016
  • The aim of this research is to apply the eQuest model to investigate the energy conservation in a multifamily building located in Dayton, Ohio by using a Trombe wall and an ammonia ground source heat pump (R-717 GSHP). Integration of the Trombe wall into the building is the first retrofitting measure in this study. Trombe wall as a passive solar system, has a simple structure which may reduce the heating demand of buildings significantly. Utilization of ground source heat pump is an effective approach where conventional air source heat pump doesn't have an efficient performance, especially in cold climates. Furthermore, the type of refrigerant in the heat pumps has a substantial effect on energy efficiency. Natural refrigerant, ammonia (R-717), which has a high performance and no negative impacts on the environment, could be the best choice for using in heat pumps. After implementing the eQUEST model in the said multifamily building, the total annual energy consumption with a conventional R-717 air-source-heat-pump (ASHP) system was estimated as the baseline model. The baseline model results were compared to those of the following scenarios: using R-717 GSHP, R410a GSHP and integration of the Trombe wall into the building. The Results specified that, compared to the baseline model, applying the R-717 GSHP and Trombe wall, led to 20% and 9% of energy conservation in the building, respectively. In addition, it was noticed that by using R-410a instead of R-717 in the GSHP, the energy demand increased by 14%.

A Study on the Operating Performance of a Cascade Heat Pump (캐스케이드 열펌프시스템의 운전 특성에 관한 연구)

  • Chang, Ki-Chang;Baik, Young-Jin;Ra, Ho-Sang;Kim, Ji-Young;Lee, Jea-Hun
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.5 no.1
    • /
    • pp.7-11
    • /
    • 2009
  • The purpose of this study is to investigate the performance of a water heat source cascade heat pump system R717(Ammonia) is used for a low-stage working fluid while R134a is for a high-stage. In order to gain a high temperature supply water in winter season, the system is designed to perform a cascade cycle. In this study, two experiments were carried out. One is a system starting test from the low load temperature of $10^{\circ}C$. The other is a system performance investigation over the R717 compressor capacity changes. Experimental results show that when it starts from the low load temperature, the suction temperature of the low-stage compressor is higher than that of a high-stage. The system performance increases when a water source temperature or a low-stage compressor rotational frequency goes higher.

  • PDF

A Design and Test of a Sea Water Source Heat Pump System (해수열원 히트펌프 시스템의 설계 및 운전)

  • Lee, Jae-Hun;Kim, Ji-Young;Baik, Young-Jin;Chang, Ki-Chang;Ra, Ho-Sang;Shin, Kwang-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1273-1278
    • /
    • 2008
  • A sea water source cascade heat pump was designed and tested in this study. The system was designed to perform a single stage operation in summer, as well as a cascade operation in winter to ensure the high temperature lift. A steady-state simulation model was developed to analyze and optimize its performance. The simulation results show that the R717 exhibits best performance among combinations considered in this study. A R410A also exhibits the highest performance among HFCs with the smallest compressor displacement. A 15-RT R410A-R134a pilot system was installed in the 5-story commercial building at Samcheok City by the East Sea. A scroll type R410A compressor, a reciprocating type R134a compressor, plate type condenser/ evaporator/ cascade heat exchanger and two electronic expansion valves were used to build a pilot. A titanium plate type heat exchanger is also used for the heat exchanging with a sea water. The heat source/sink water is supplied from the well below the seashore in the depth of 5 m. In the initial test of the system, supply water temperature was rising up to $67^{\circ}C$ using a sea water heat source of $9^{\circ}C$, while an ambient temperature was $4.5^{\circ}C$.

  • PDF

Evaluation of Deployment Barriers to Solar Thermal and Ground Source Heat Pump for Buildings (건물용 태양열과 지열의 보급 장벽 평가)

  • Ilhyun Cho;Jaeseok Lee
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.61-69
    • /
    • 2024
  • This study investigates the barriers to the deployment of solar thermal and ground source heat pump (GSHP) from the perspective of consumers and businesses, as well as evaluates priorities for improving the barriers via expert AHP evaluation. From a consumer's perspective, the overall satisfaction with solar thermal is significantly lower than that with PV and needs to be improved at the installation and use stages. GSHP needs to be improved at the prior-information search stage. From a business perspective, the non-distinction between heat and electricity in mandatory installations in public buildings, the difficulty in assessing the value of heat, and high initial costs impede the deployment. Based on the result of AHP analysis, the priorities for improving the barriers to the wide utilization of solar thermal are evaluated in the order of economic feasibility, policy, acceptability, and technology, where high installation cost is shown to be the greatest barrier. Barriers for GSHP are evaluated in the order of policy, acceptability, economic feasibility, and technology, where policy means improvement is evaluated as the most important factor in promoting the deployment of GSHP.

The Operation Characteristics of a Sea Water Source Heat Pump System (해수열원 히트펌프 시스템의 운전특성)

  • Chang, Ki-Chang;Baik, Young-Jin;Ra, Ho-Sang;Kim, Ji-Young;Lee, Jae-Hoon
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1353-1357
    • /
    • 2008
  • A sea water source cascade heat pump was designed and tested in this study. The system was designed to perform a single stage operation in summer, as well as a cascade operation in winter to ensure the high temperature lift. A steady-state simulation model was developed to analyze and optimize its performance. The simulation results show that the R717 exhibits best performance among combinations considered in this study. A R410A also exhibits the highest performance among HFCs with the smallest compressor displacement. A 15-RT R410A-R134a pilot system was installed in the 5-story commercial building at Samcheok City by the East Sea. A scroll type R410A compressor, a reciprocating type R134a compressor, plate type condenser/ evaporator/ cascade heat exchanger and two electronic expansion valves were used to build a pilot. A titanium plate type heat exchanger is also used for the heat exchanging with a sea water. The heat source/sink water is supplied from the well below the seashore in the depth of 5 m. In the initial test of the system, supply water temperature was rising up to $67^{\circ}C$ using a sea water heat source of $9^{\circ}C$, while an ambient temperature was $4.5^{\circ}C$.

  • PDF

Study on feasibility analysis for ground source heat pump system using the building foundation (건물기초 이용 지열시스템의 도입 타당성 분석에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.155-157
    • /
    • 2013
  • Ground source heat pump(GSHP) systems have been attracted as high-efficient energy-saving technology, but the building clients and designers have hesitated to use GSHP systems which is a expensive initial installation and a uncertain economic feasibility. Therefore In order to reduce the initial cost, many researchers have focused on the energy-pile system using the structure of the building as a heat exchanger. Even though many of experimental studies for energy pile system have been conducted, there was not enough data of a quantitative evaluation with the economic analysis and comprehensive analysis for energy-pile. In this study, the feasibility study for the energy pile system with a barrette pile was conducted by the performance analysis and LCC assessment.

  • PDF

A Study on The Operation Characteristics of 2-Stage Compression Heat Pump using Treated sewage (하수처리수를 이용한 2단 압축 열펌프 시스템의 운전특성에 관한 연구)

  • Kim, Ji-Young;Baik, Young-Jin;Lee, Young-Soo;Chang, Ki-Chang;Ra, Ho-sang
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.299-303
    • /
    • 2008
  • The treated sewage temperature is about $5^{\circ}C$ lower in summer and $5{\sim}10^{\circ}C$ higher in winter than ambient air. It can be used heat pump heat source and is good heat source on high performance of heat pump. In this study, to develop 100RT 2-stage compression heat pump use treated sewage water heat source and system applies to sewage disposal plant. Although heat pump is better performance, the large temperature difference between load and source makes the performance degradation of a heat pump. To solve this problem screw 2-stage compression is considered. The experiment was focused on the system operating performance variations over supply water and treated sewage water a temperature in the field. The results show that system of heating performance is higher then general heat pump and is enough to supply a hot water of $70^{\circ}C$.

  • PDF

Design of Heat Pump System in Air Heat Source Type (공기열원 히트 펌프 시스템 설계)

  • Lee, Yun-Min;Shin, Jin-Seob
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.6
    • /
    • pp.73-77
    • /
    • 2019
  • In this paper, the heat pump system was designed using heat absorption of the refrigerant or condensation heat. The cooperation system has been developed to pass a heat source of low temperature to a high temperature or to pass the heat source of high temperature to a low temperature. Heat pump for using the valve as a function of switching a condenser and an evaporator in a refrigerating cycle. As a result, heat pump system was developed by air source method. Therefore cooperating system for energy saving to solve at the same time as the cooling and heating by system of one was equipped.

Analysis on the Effect of Local Climate on the Unit-type Ground Heat Exchanger (지역 기후가 유닛형 지중열교환기 성능에 미치는 영향)

  • Bae, Sangmu;Kim, Jae-Min;Nam, Yujin
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.1
    • /
    • pp.67-76
    • /
    • 2019
  • A ground source heat pump (GSHP) system can stable system operation by using underground heat source and has high reliability for energy production. However, wide-spread of the GSHP system is delayed to high initial investment costs. In previous studies, horizontal and unit-type ground heat exchanger (GHX) have developed to overcome disadvantages such as high initial cost. However, these performances of GHXs are greatly influenced by climate and weather conditions. It is necessary to analyze the performance of GHX according to the ground temperature change in the installation site. In this study, the ground temperature of each installation site confirmed and performance of unit-type GHX quantitatively analyzed by numerical analysis. As the result, the performance of the unit type GHX was 33.9 W/m in Seoul, 34.2 W/m in Daejeon, and 37.2 W/m in Busan.The result showed the difference performance of GHX according to local climate was maximum of 9.7%.