The newly established high speed railway station may function not only just as a traffic convergence but also as an energizing force with multiple roles in the context of municipal environment. As a result, the development of high speed railway station zone will be considered as great opportunities as well to enhance quality of life of the neighboring inhabitants, as to develop new footholds for the inner-municipal growth and mobilization. The main purpose of this article is to offer guidelines about the effects of development of the high speed railway station zone seen from multiple aspects of municipal lifes and functions. To attain this purpose, the definition of high speed railway station zone, its characteristics, and its roles will be handled with the case of advanced countries such as Japan and France. And some lessons will be proposed based on them.
Station is an important building in high-speed railway, and its vibration and noise may significantly affect the comfort of waiting passengers. A coupling vibration model for train-structure system is established to analyze and evaluate the vibration level of a typical waiting hall under dynamic train load. The motion of a four-axle vehicle with two suspension system is modeled in multi-body dynamics with linear springs and dampers employed. The station is modeled as a whole finite element structure which is 113 m in longitudinal and 163.5 m in lateral, and the stiffness of the station foundation is considered. According to the assumptions that both wheel and rail are rigid bodies and keep contact to each other in vertical direction, and the wheel/rail interaction and displacement coordination in horizontal direction is defined by the simplified Kalker creep theory, the vehicle spatial vibration model has 27 degrees-of-freedom. An overall analysis procedure is made of the train moving through the station, by which the dynamic responses of the train and the station are calculated. According to the comparison between analysis and test results, the actual connection status between different parts of the station is estimated and the vibration level of the waiting hall is evaluated.
Dong-tan Station, shared by high-speed railway and urban express railway, is a very complicated underground station having 6 tracks together with barrier and shafts between them, therefore it seems very hard to investigate the aerodynamic effects including the pressure variation and train gust in the station when a high-speed train runs through it. In this study, the aerodynamic effects on the structures and platform passengers when a high-speed train runs through an underground station have been studied using Computational Fluid Dynamics. STAR-CCM+ has been employed for numerical simulation based on Navier-Stokes equation and 2-equation turbulence model and moving mesh scheme supported by STAR-CCM+ has also been used to represent the relative motion between a train and station. Based on the simulation results, the unsteady flow fields in the underground station induced by the high-speed train have been analyzed and the pressures on the PSDs and pressure variation at the platform have quantitatively assessed.
The introduction of high speed railway system a significant impact on the conventional inter-urban transport systems by inducing a significant traffic from the existing modes as well as generating a new traffic. It is also closely related to intra-urban transport systems as the inter-urban traffic has its origin and destination in a city. In the context of mode choice, for high speed transport systems, it has been argued that the accessibility is the most important attribute conceived by users. Thus this study attempts to analysis the importance of the accessibility for the planned high speed railway systems particularly with respect to the location of Busan Station. For this Stated-Preference approach, which is considered appropriate for such study, is adopted, and disaggregate binary logit models for mode choice between the high speed railway and air service in Busan-Seoul corridor are developed. The elasticities for cost and service variables are also derived. The results disclose that cost is the most important which is inconsistent with most previous studies ; accessibility has considerable impact on the choice ; and frequency however has a little impacts. Concerning location of the high speed railway station the results suggest that the longer the access distance is, the more important the accessibility is. This implies that the connection of reliable access transport services such as underground are essential between the terminal and urban center.
Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
/
v.6
no.7
/
pp.427-437
/
2016
This study has the goal of analyzing the techniques and characteristics of urban development, after additionally constructing the high-speed railway in Japan's Kyushu district and building a new railway station to enable the existing traditional stations accommodate with the high-speed railway. Such analysis is made in order to draw the conclusion of its intended (designed) meaning and attributes and to further research on finding an applicable urban development method in the domestic railway station development. The object of this study includes examples of stations renewed within the five years when Shinkansen in the Kyushu district was extended or stations which are in process of development such as Hakata station, Kumamoto station, and Kagoshima-chuo station. From the analysis of this study, the strategies are as follows.; active connecting both geographical location and function of Station, re-establishment of relation with city center and Station, establishment of close linking system for both tourist spot development, methods of Shinkansen line construction and extension a development opposite site of railway, securing the living population from high density & Mixed use development of Station Building.
The Design manual for adjusting the capacity and LOS of facilities has been shared in urban railways and high-speed railway stations. However, the pattern of urban railways users and those of high-speed railway users are different from each other. For an example, the high-speed railway users tend to carry voluminous luggages and the transportation disadvantaged such as children and the elderlies. Accordingly, we see that the scale of facilities and the station itself should be constructed differently. The transfer facilities in the high-speed railway stations are classified widely into walking assisting facilities and convenient facilities. We invented the concept of PME(Pedestrian Moving Equivalent) and PWE(Pedestrian Waiting Equivalent)for the spatial calculation of those who are with wheeled luggages, back packs, and children to reflect the uniqueness of users in high-speed railway stations. These equivalents have been applied to the design of the facilities to asses the new Capacity and LOS that are users' favored.
This primary study has some bounds md limits owing to the descriptive reviews but not detailed analyses. However, 1 tried to do the comparative analyses and case studies about location and size of rail station for future efficient use of spatial structure. Therefore, I reviewed the location of railway station and some design standards of railway station facilities by type (high speed rail, conventional rail and urban rail), and also, suggested future direction for rail station as the core of city development relating with urban structures and human settlement system reformation.
This paper is designed the accessibilities at rail station and near facilities without distinguishing transportation handicapped or not handicapped people. Therefore, I would like to refer that this study is the just beginning such as the development for sustainable railway. This primary paper intends to present alternatives of trans-modal systems as the final goal in an attempt to set a direction for future policy making in the high speed rail sector. The alternatives recommended in this report stress two important elements for maximized utility of high speed rail at the station areas.
During the last several years, the high speed railway system has been constructed and it is scheduled to open sometime in 2004. To fulfil its duties, it is essential to view intermodalism in the context of broader technological developments in easy access to high speed railway station. And also, to understand the economic importance of intermodal transportation, continual research is needed on the costs and distributional effects of alternative intermodal mechanisms for public works, including direct service to local station or easy transfer to other mass transportation modes. In this paper, necessary courses for local governments involvement are taken, and additional resources must be found that will benefit the entire railway system.
Centering on KTX stations, Korea is implementing specialized development of metropolitan business zones nationwide and is in the process of building the transfer link system of transportation in order to actualize intermodalism nationwide. Daejeon station, hub of high-speed railway requires the effective transportation transfer system considering Daejeon station area reorganization plan and opening of second phase high-speed railway. Based on the analysis of the possibility and validity of building a transit center under the Transportation System Efficiency Act, it is necessary to make a mutual benefit in a regional development by installing the resonable transfer system between railway and other transportation services. Through analysis of current situations and technical, economic and environmental feasibility evaluation, design plan of effective transportation transfer system in Daejeon station is proposed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.