• Title/Summary/Keyword: High Frequency Triangular Excitation

Search Result 2, Processing Time 0.015 seconds

A Real-Time Measurement of Slug Flow Using Electromagnetic Flowmeter with High frequency Triangular Excitation (고주파 삼각파 여자법을 사용한 실시간 슬러그 유동 측정용 전자기유량계)

  • Ahn, Yeh-Chan;Cha, Jae-Eun;Kim, Moo-Hwan
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.26 no.11
    • /
    • pp.1570-1577
    • /
    • 2002
  • In order to investigate the characteristics of two-phase slug flow, an electromagnetic flowmeter with 240Hz triangular AC excitation was designed and manufactured. The signals and noise from the flowmeter were obtained, and analyzed in comparison with the observations with a high speed CCD camera. The uncertainty of the flowmeter under single-phase flow was $\pm$ 2.24% in real-time. For two-phase slug flow, electromagnetic flowmeter provided real-time simultaneous measurements of the mean film velocity around Taylor bubble and the relative location and the length of the bubble. Besides, it is an easier and cheaper method for measuring mean film velocity than others such as photochromic dye activation method or particle image velocimetry.

The Design of Parameters to Improve Actuating Performance in High Frequency Vibro-Hammer(HFVH) and the Study of Characteristic Propagation and Attenuation of Piling Vibration (초고주파 진동항타기의 구동 성능향상을 위한 파라미터 설계 및 항타진동의 전달과 감쇠특성에 관한 연구)

  • Jang, Tae-In;Park, Joon-Hyuk;Baek, Yoon-Su;Kim, Sung-Bae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.6
    • /
    • pp.763-773
    • /
    • 2004
  • This paper suggests the 2 D.O.F mathematical model of the High Frequency Vibro-Hammer (HFVH), introduces an experimental method for measuring of the attenuation of piling vibration and proves what experiments are coincident with the equation of wave propagation. As vibratory installation of piles and casings has many economic merits in the construction field, most of all contractors prefer to vibratory pile driving method than the other. Compared to impact pile driving, vibratory installation has the advantage of reducing vibration or noise pollution and can drive piles under high frequency. Experiments serve estimations of capabilities and limitations of the HFVH's excitation force and finding of sensitivity for important soil resistance parameters. Also, we discuss the HFVH that can drive with three kinds of input waves (triangular, sine and square wave) and propose the design of parameters to improve actuating performance in it.