• Title/Summary/Keyword: Heavy maintenance

Search Result 304, Processing Time 0.028 seconds

A Study on the Rolling Stock Assembly using Heavy Maintenance Factory (전동차 중정비 시설을 활용한 완성차 조립에 관한 연구)

  • Lee, Duk-Gyu;Park, Man-Su;Song, Moon-Shuk;Son, Young-Jin;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1418-1425
    • /
    • 2011
  • Subway operators in the country have their own heavy maintenance facilities for maintaining rolling stock(EMU). However, it is true that the heavy maintenance facilities are not utilized 100% with the recent trend of lengthening maintenance cycle(intervals). With the fact, this enabled the existing maintenance facilities to be utilized for other purposes. By taking advantage of spare facilities and the maintenance staff with rolling stock assembly abilities, subway operators can assemble rolling stock by procuring parts for the assembly instead of purchasing trains from other companies. It is estimated that this will enhance the operator's technology and have a great impact on the management skill as well. This study attempts to find out how the heavy maintenance factory can be utilized for rolling stock assembly.

  • PDF

A Study on the Maintenance Management in Korean Industry (국내 제조업의 보전관리에 관한 조사연구)

  • 강인선
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.45
    • /
    • pp.247-251
    • /
    • 1998
  • From the early 90's TPM(Total Productive Maintenance) plays important roles to improve productivity and quality to keep enterprise's competivity. This study presents the results of an enquiry for the maintenance management of Korean industry in 1996. The response rate was 35.8% (43 companies) that the corporations were divided into four industrial groups, heavy process, light process, heavy assembly and light assembly. 40 question were asked, including maintenance organization, maintenance personnel, maintenance cost, measurement of maintenance performance and improvements achieved. This paper compares the results with those of an earlier Japanese and British enquiry.

  • PDF

A Study on Vacuum Circuit Breaker Driving Mechanism (전공차단기 구동 메카니즘 연구)

  • Kim, Chang-Wook;Kim, Jin-Soo;Jang, Yong-Gu;Lee, Sang-Hun;Choi, Myung-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.804-806
    • /
    • 2003
  • In these days the Vacuum Circuit Breaker(VCB) is used in most medium voltage level because VCB has merits of simple structure, long life, free maintenance and environment friendly characteristics. Most of VCBs adopt mechanical spring drive mechanism to operate vacuum interrupter, but this mechanism is composed of many components and needs frequent maintenance works. In this paper, we study about the VCB drive mechanism with Permanent Magnet Actuator (PMA). Design methods and design flows about PMA are presented. The magnetic equivalent circuit is used for elementary and detailed design to determine the size of PMA. Finite Element Method (FEM) analysis is performed to evaluate the behavior characteristics of PMA in both static and transient state. Finally we manufacture sample PMA and verify FEM analysis through experiments.

  • PDF

A Study on the Verification of Heavy Overhaul Maintenance Allowances for the Maintenance Shop (시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수 여유율 검증)

  • Choi, Sung-Hwan;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.9-15
    • /
    • 2010
  • When designing the size of a heavy maintenance shop for rolling stock, it is required to arrange buildings and facilities in the minimum site so as to improve the maintenance efficiency. However, the fluctuation rate (hereinafter "allowance rate") on which factors such as service and maintenance fluctuation should be applied when estimating the size of the maintenance shop has been used without verification. The objective of the study is to calculate a reasonable allowance rate and to review its appropriateness through the analysis of the facilities layout and process simulation to absorb the above elements into the staying time in the heavy maintenance shop. Since the working time, in this study, is assumed to be average working time, 10~20% was given to the standard deviation of working time in consideration of difference between workers, and possible allowance rate was drawn by analysis of the simulation results. In the future, it is required to optimize the size of the shop by applying appropriate allowance rate through scientific review of such factors as O&M plan, R/S reserve rate, capability of the shop, outsourcing rate, standard work amount, and so on.

Evaluation of Permit Vehicle Weight for Simple Girder Bridges (단순거더교의 중차량 통과허용하중 설정에 관한 연구)

  • Kim, Sang-Hyo;Yang, Nam-Seok;Kim, Jong-Hak;Juhn, Gui-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.4
    • /
    • pp.211-218
    • /
    • 2000
  • Many bridges are severely damaged by the overloaded heavy vehicle and the trend will become more serious because the traffic volume is continuously increasing. Currently, the vehicles with gross weights over 40 tonf or axle weight over 10 tonf are not allowed on the public road. However, this regulation is not based on a systematic study on the bridge capacity and assumed to be much too conservative depending on the vehicle types and bridge types. In this study, the permit weights of heavy vehicles of diverse axle spacings and axle load distribution are calculated considering the structural characteristics of bridge superstructures. In order to consider the various load effects of heavy weight vehicle crossings, three conditions are considered in the calculation of permit vehicle load. From the results, the permit vehicle weights of the simple girder bridges are calculated.

  • PDF

A Study on the Outsourcing of Aircraft Maintenance Contracts

  • Cho, Kyung Rak
    • Journal of Aerospace System Engineering
    • /
    • v.15 no.6
    • /
    • pp.66-71
    • /
    • 2021
  • With the exception of some large domestic airlines with adequate maintenance capability, most low-cost and small airlines do not have the facilities, equipment/tools, or manpower to perform periodic inspections over "C check." They are repaired according to maintenance programs specified by manufacturers. The outsourcing (domestic or overseas) of maintenance contracts is thus crucial to achieve good quality service at low cost, and these contracts therefore need to be signed with a full understanding of what is to be expected. This study aims to determine the requirements to be considered prior to finalizing such contracts.

A Development of Remote Ship Maintenance System Based on Ship Area Network (선박 통합 통신망 기반 원격 선박 유지보수 시스템 개발)

  • Moon, Dae-Keun;Bae, Jeong-Yeon;Park, Jun-Hee;Lee, Kwang-Il;Kim, Hag-Bae
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.47 no.5
    • /
    • pp.751-756
    • /
    • 2010
  • The rapid growth of IT technology has enabled ship automation systems to gain better functionality and safety with reduced costs and crew numbers. Nowadays, the remote maintenance services for the systems are required because a ship may be located in a very remote area. To provide the remote maintenance services, some issues such as how to collect the ship automation systems data, how to monitor a ship's data from onshore offices, how to get support from experts while sailing, and how to reduce the maintenance costs, should be addressed. In this paper, we propose a remote ship maintenance system for remote monitoring and diagnostics of ship automation systems, which is based on both a ship area network to integrate separate system networks and a ship-shore communication infrastructure to support a remote access using satellite communications. Finally, we present the function test to verify the applicability of the proposed system.

Evaluation on the Applicability of Heavy Weight Waste Glass as Fine Aggregate of Shielding Concrete (고밀도 폐유리의 차폐 콘크리트 잔골재로의 활용가능성 평가)

  • Choi, So-Yeong;Choi, Yoon-Suk;Won, Min-Sik;Yang, Eun-Ik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.4
    • /
    • pp.101-108
    • /
    • 2015
  • The quantities of heavy weight waste glass have been progressively increased because of the rapid industrialization and the change of quality of life. And, the most of them are not recycled. The heavy weight waste glass have been treated by illegal dumping or being buried in landfills. Meanwhile, in order to ensure the safety of nuclear power plant structure, the excellent construction materials are socially required for shielding performance. Concrete is the most widely used construction material, the huge amounts of natural resources are required to make concrete. So, it is needed to investigate the possibility of recycling of heavy weight waste glass as concrete material ingredient. In this study, the heavy weight waste glass was evaluated for the applicability as fine aggregate of shielding concrete. From the results, when heavy weight waste glass was replaced as fine aggregate of mortar, shielding performance can be improved due to increasing in unit weight of mortar. It showed that the strength decreased according to mixing of heavy weight waste glass, Non-Washed heavy weight waste glass is more advantageous in the strength development than Washed case.

Burn-in Test Case Study for Heavy Maintenance to Improve the Reliability (중정비 신뢰성 향상을 위한 Burn-in 시험 적용 사례연구)

  • Kim, Hanyoung;Lee, Jinchoon
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.566-571
    • /
    • 2012
  • The door systems in urban railway vehicles, through heavy maintenance checks by six years, 75 parts for 34 part types in 75 units have to be replaced periodically, and the remaining 68 parts for 40 part types to be replaced occasionally based on the necessity. Even though this process makes the door systems almost to be initial status, the systems have complicated mixes of components with new parts and used and then have different property from the original ones. This study suggested a burn-in test as a subsidiary tool to improve the reliability of urban railway vehicles, and suitable for testing conditions and the proposed new target value.

A Study on the Improvement of Pavement for Bus Rapid Transit System in Seoul (서울시 중앙버스전용차로 포장방법 개선방안 연구)

  • Bae, Yoon Shin;Kwon, Wan Taeg;Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • PURPOSES: This study is to suggest the improvement for bus rapid transit system in Seoul METHODS: The maintenance cost for bus lane damages and plastic deformations are increased by bus passing speed, heavy bus weight, and climate change (localized torrential downpour, subtropical climate) and the accident risk has been increased. RESULTS: Recent analysis of pavement damage indicates that bus lane damage caused by heavy weight is overwhelming and it is urgent to prepare countermeasures. CONCLUSIONS : Pavement data of bus rapid transit system, bus transit numbers and pavement damage elements were analyzed. By analyzing pavement maintenance, design and construction, the countermeasures for the improvement of bus lane pavement and effective maintenance were suggested.