• Title/Summary/Keyword: Heave compensator

Search Result 6, Processing Time 0.023 seconds

Numerical Analysis of Offshore Installation Using a Floating Crane with Heave Compensator in Waves (Heave Compensator를 고려한 파랑 중 해상 크레인 설치작업 수치해석)

  • Nam, Bo-Woo;Hong, Sa-Young;Kim, Jong-Wook;Lee, Dong-Yeop
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.1
    • /
    • pp.70-77
    • /
    • 2012
  • In this study, a numerical analysis of offshore installation using a floating crane with heave compensator is carried out in time domain. The motion analysis of crane vessels is based on floating body dynamics using convolution integral and the crane wire is treated as simple spring. The lifted structure is assumed as a rigid body with 3 degree-of-freedom translational motion. The heave compensator is numerically modelled by the generalized spring-damper system. Firstly, forced motion simulations of crane wire system are carried out to figure out the basic principle of heave compensator. The transfer function of crane wire system is obtained and effective wave period of heave compensator are found. Then, coupled analysis of crane vessel, crane wire, and lifted structure are performed in regular and irregular sea conditions. Two different crane vessels and two lifted structures (suction pile and manifold) are considered in this study. Through a series of numerical calculations, the effective zone of heave compensator is investigated with respect to wave period and crane wire length.

Analysis of Hydraulic-Pneumatic System for Offshore Plant Heave Compensator (해양플랜트용 수직 보상기의 유공압 시스템 해석)

  • Jung, Yong-Gil;Hwang, Sung-Gu;Kim, Gwi-Nam;Yoon, Yung-Hwan;Hyun, Jang-Hwan;Huh, Sun-Chul
    • Journal of Power System Engineering
    • /
    • v.19 no.1
    • /
    • pp.76-82
    • /
    • 2015
  • An analysis model is developed using a commercial software 'simulationX' for designing hydraulic-pneumatic system of heave compensator for offshore drilling operations. Reliability verification of the analysis model for the test equipment of 1/5 scale compensator was conducted by comparing test results and simulation results. An analysis of full scale heave compensator is developed on the basis of verified a model. Then, the results of simulation were analyzed to obtain following conclusion. The displacement of crown block about excitation input amplitude (${\pm}3,000mm$) of the steward platform using a 'simulationX' is attenuated under ${\pm}35mm$, and the compensation rate is 98.7%. In this study, goal of a compensation rate is more than 95%. The previously results are satisfied with the objectives of compensation rate.

Study on the Applicability of a New Multi-body Dynamics Program Through the Application to the Heave Compensation System (상하동요 감쇠장치 적용을 통한 새로운 다물체동역학 프로그램의 적용성 검토)

  • Ku, Nam-Kug;Ha, Sol;Roh, Myung-Il
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.4
    • /
    • pp.247-254
    • /
    • 2013
  • In this paper, dynamic response analysis of a heave compensation system is performed for offshore drilling operations based on multibody dynamics. With this simulation, the efficiency of the heave compensation system can be virtually confirmed before it is applied to drilling operations. The heave compensation system installed on a semi-submersible platform consists of a passive and an active heave compensator. The passive and active heave compensator are composed of several bodies that are connected to each other with various types of joints. Therefore, to carry out the dynamic response analysis, the dynamics kernel was developed based on mutibody dynamics. To construct the equations of motion of the multibody system and to determine the unknown accelerations and constraint forces, the recursive Newton-Euler formulation was adapted. Functions of the developed dynamics kernel were verified by comparing them with other commercial dynamics kernels. The hydrostatic force with nonlinear effects, the linearized hydrodynamic force, and the pneumatic and hydraulic control forces were considered as the external forces that act on the platform of the semi-submersible rig and the heave compensation system. The dynamic simulation of the heave compensation system of the semi-submersible rig, which is available for drilling operations with a 3,600m water depth, was carried out. From the results of the simulation, the efficiency of the heave compensation system were evaluated before they were applied to the offshore drilling operations. Moreover, the calculated constraint forces could serve as reference data for the design of the mechanical system.

Integrated Simulations of a Floating Crane Installation Vessel with DP systems in Waves

  • Nam, B.W.;Hong, S.Y.;Kim, Y.S.;Kim, J.W.
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.1 no.2
    • /
    • pp.85-93
    • /
    • 2015
  • The nonlinear time-domain analysis method was implemented to carry out a series of integrated simulations for a deep-water crane vessel system composed of four sub components, including a floating vessel, lifted equipment, hoisting cable and dynamic positioning (hereinafter DP) system. The analysis of the coupled dynamics consists of the crane vessel and equipment connected using the crane wire, and the DP is modeled according to the wind, wave and current conditions. The DP systems were numerically implemented using a classical PD feedback controller, and various simulations of the deepwater installation were conducted using different conditions in order to evaluate the global performance of the floating crane vessel combined with the DP system.

Experimental and numerical study on coupled motion responses of a floating crane vessel and a lifted subsea manifold in deep water

  • Nam, B.W.;Kim, N.W.;Hong, S.Y.
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.5
    • /
    • pp.552-567
    • /
    • 2017
  • The floating crane vessel in waves gives rise to the motion of the lifted object which is connected to the hoisting wire. The dynamic tension induced by the lifted object also affects the motion responses of the floating crane vessel in return. In this study, coupled motion responses of a floating crane vessel and a lifted subsea manifold during deep-water installation operations were investigated by both experiments and numerical calculations. A series of model tests for the deep-water lifting operation were performed at Ocean Engineering Basin of KRISO. For the model test, the vessel with a crane control system and a typical subsea manifold were examined. To validate the experimental results, a frequency-domain motion analysis method is applied. The coupled motion equations of the crane vessel and the lifted object are solved in the frequency domain with an additional linear stiffness matrix due to the hoisting wire. The hydrodynamic coefficients of the lifted object, which is a significant factor to affect the coupled dynamics, are estimated based on the perforation value of the structure and the CFD results. The discussions were made on three main points. First, the motion characteristics of the lifted object as well as the crane vessel were studied by comparing the calculation results. Second, the dynamic tension of the hoisting wire were evaluated under the various wave conditions. Final discussion was made on the effect of passive heave compensator on the motion and tension responses.