• Title/Summary/Keyword: Heat recovery steam generator

Search Result 88, Processing Time 0.021 seconds

Noise and vibration reductions in exhaust duct system of cogeneration power plants (열병합발전소 배기 덕트 시스템의 소음 진동 저감)

  • Kim, W.H.;Joo, W.H.;Bae, J.G.
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.641-646
    • /
    • 2004
  • Noise and vibration was encountered in exhaust duct system which is connected with a gas turbine and a heat recovery steam generator(HRSG) of a cogeneration power plants. Especially, these problems occurred when water was added to the fuel injection to reduce NOx contents of the exhaust gas. Through the cavity mode analysis and measurements, It was concluded that these problems occurred due to the acoustic resonance between the duct cavity mode and the excitation force induced by turbulent gas flow during water injection. To reduce the noise and vibration, optimal baffle plate to change the cavity mode was installed inside of duct and noise levels of about 8 dB(A) are reduced in duct system. The effects of baffle plate and guide vane to the HRSG or inlet duct vibration were also evaluated and it was verified that there is no relation to the resonance phenomena. So, vibration of inlet duct was easily reduced by the reinforcement of structures.

  • PDF

Performance Analysis of CHP Condersing Season heat load Conditions (계절별 부하 특성을 고려한 CHP 성능 해석)

  • Seo, Young-Ho;Lee, Joon-Hee;Kim, Nam-Jin;Kim, Jong-Yoon;Cho, Sung-Kap;Jeon, Yong-Han
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.7
    • /
    • pp.454-459
    • /
    • 2010
  • This paper is a actual design case applied to make a bid for CHP plant construction in some country. The purpose of this study is to optimize the system performance for the requirement conditions written in ITB by the client. The system consists of gas turbine, steam turbine, heat recovery steam generator and heat exchangers for district heating. The performance analysis is conducted for various seasons conditions and heat load. As a result, air density and heat load is reduced in accordance with decreasing of the outdoor temperature, therefore the system power is reduced. Considering this, the design parameters to meet the requriement conditions are optimized.

A Technique of the Combined Cycle Heat Rate Allocation for the On-Line Performance Monitoring System (복합화력 온라인 성능감시 구현을 위한 열소비율 분담 기법)

  • 주용진;김시문
    • Journal of Energy Engineering
    • /
    • v.13 no.3
    • /
    • pp.173-180
    • /
    • 2004
  • A technique of the heat rate allocation was devised to monitor the performance of Combined Cycle Power Plant. This calculates the expected heat rate of current conditions and compares it with actual values. Loss allocation in heat rate is reconciled by calculating the magnitude of the deficiency contributed by major components, such as the gas turbine, heat recovery steam generator (HRSG), steam turbine and condenser. Expected power output is determined by a detailed model and correction curves of the plant.

The thermodynamic efficiency characteristics of combined cogeneration system of 120MW (120MW급 열병합 복합발전시스템의 열역학적 효율 특성)

  • Choi, Myoungjin;Kim, Hongjoo;Kim, Byeongheon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.6
    • /
    • pp.29-36
    • /
    • 2017
  • In this study, acombined cogeneration power plant produced two types of thermal energy and electric or mechanical power in a single process. The performance of each component of the gas turbine-combined cogeneration system was expressed as a function of the fuel consumption of the entire system, and the heat and electricity performance of each component. The entire system consisted of two gas turbines in the upper system, and two heat recovery steam generators (HRSG), a steam turbine, and two district heat exchangers in the lower system. In the gas turbine combined cogeneration system, the performance test after 10,000 hours of operation time, which is subject to an ASME PTC 46 performance test, was carried out by the installation of various experimental facilities. The performance of the overall output and power plant efficiency was also analyzed. Based on the performance test data, the test results were compared to confirm the change in performance. This study performed thermodynamic system analysis of gas turbines, heat recovery steam generators, and steam turbines to obtain the theoretical results. A comparison was made between the theoretical and actual values of the total heat generation value of the entire system and the heat released to the atmosphere, as well as the theoretical and actual efficiencies of the electrical output and thermal output. The test results for the performance characteristics of the gas turbine combined cogeneration power plant were compared with the thermodynamic efficiency characteristics and an error of 0.3% was found.

Numerical Study on Heat Transfer Characteristics of Turbulent Flow in Transition Duct (안내덕트 내부 난류유동구조에 따른 열전달 특성변화 수치해석)

  • Yoo, Geun-Jong;Choi, Hoon-Ki;Choi, Kee-Lim
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.9
    • /
    • pp.923-932
    • /
    • 2011
  • Because of the instability of a flow pattern in the inlet transition square duct (hereinafter referred to as "transition duct") of a heat recovery steam generator (hereinafter referred to as "HRSG") in a combined cycle power plant, the Reynolds number in the first row of a tube bank is differs sharply from that in the sectional area of the transition duct. This causes differences in the heat flux in each tube in the tube bank. The computational fluid dynamics (CFD) predictions provide three-dimensional results for velocity, temperature, and other flow parameters over the entire domain of the duct and HRSG. A renormalization group theory (RNG) based k-${\epsilon}$�� turbulent model is used for obtaining the results cited in this study. A porous media option is used for modeling the tube banks and the number of transfer units method is used for determining the heat transfer characteristics. This study describes a comparison between the numerical simulation results and actual design output.

Solar tower combined cycle plant with thermal storage: energy and exergy analyses

  • Mukhopadhyay, Soumitra;Ghosh, Sudip
    • Advances in Energy Research
    • /
    • v.4 no.1
    • /
    • pp.29-45
    • /
    • 2016
  • There has been a growing interest in the recent time for the development of solar power tower plants, which are mainly used for utility scale power generation. Combined heat and power (CHP) is an efficient and clean approach to generate electric power and useful thermal energy from a single heat source. The waste heat from the topping Brayton cycle is utilized in the bottoming HRSG cycle for driving steam turbine and also to produce process steam so that efficiency of the cycle is increased. A thermal storage system is likely to add greater reliability to such plants, providing power even during non-peak sunshine hours. This paper presents a conceptual configuration of a solar power tower combined heat and power plant with a topping air Brayton cycle. A simple downstream Rankine cycle with a heat recovery steam generator (HRSG) and a process heater have been considered for integration with the solar Brayton cycle. The conventional GT combustion chamber is replaced with a solar receiver. The combined cycle has been analyzed using energy as well as exergy methods for a range of pressure ratio across the GT block. From the thermodynamic analysis, it is found that such an integrated system would give a maximum total power (2.37 MW) at a much lower pressure ratio (5) with an overall efficiency exceeding 27%. The solar receiver and heliostats are the main components responsible for exergy destruction. However, exergetic performance of the components is found to improve at higher pressure ratio of the GT block.

Performance Analysis of CHP(Combined Heat and Power) for Various Ambient Conditions (외기조건변화에 따른 CHP 성능 해석)

  • Jeon, Yong-Han;Kim, Jong-Yoon;Kim, Nam-Jin;Lim, Kyung-Bum;Seo, Young-Ho;Kim, Ki-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.8
    • /
    • pp.3353-3359
    • /
    • 2011
  • The co-generation system consisted of gas a turbine, a steam turbine, heat recovery steam generator and a heat exchangers for district heating was investigated in the present study. A back-pressure steam turbine (non-condensing type) was used. A partial load analysis according to the outdoor temperature in winter was conducted and optimal thermal load and power conditions was examined using the commercial computing software Thermoflex. As a result, under a constant thermal load, the power outputs of gas turbine and overall system increased as an outdoor temperature decreased. On the other hand, the reduction in exhaust gas temperature led to the decrease in output of steam turbine. Considering the portion of gas turbine in overall system in terms of the power output, it can be known that the tendency in power output of overall system was similar to that of the gas turbine.

The CFD Analysis for the Fatigue Life Evaluation of HRSG Structure (배열회수 보일러 구조물의 피로수명 평가를 위한 유동해석)

  • Kim, Jinbeom;Kim, Chulho
    • Journal of Energy Engineering
    • /
    • v.29 no.3
    • /
    • pp.7-17
    • /
    • 2020
  • Heat recovery steam generator(HRSG) generate steam using the high-temperature exhaust energy of gas turbines. Structures of HRSG are damaged by flow induced vibration of flue gas in some cases. In order to evaluate fatigue life to predict damage to a structure, a vibration analysis caused from flue gas should be used to derive the Power Spectral Density(PSD). However, it is very difficult to experimentally derive the vibrations generated by the exhaust gas form of gas turbines, which is very fast and complex. It was able to establish a way to identify vibration characteristics depending on the location of the structure by using high computing resources, large eddy simulation (LES). Random vibration analysis through these vibration characteristics(PSD) can evaluate the fatigue life of a structure.

Performance test of scale-up $20Nm^3/hr$ scale hydrogen generator for hydrogen station (수소스테이션용 $20Nm^3/hr$급 수소제조장치 스케일-업 및 성능시험)

  • Oh, Young-Sang;Baek, Young-Soon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.37-42
    • /
    • 2006
  • In this study, $20Nm^3/hr$ scale compact hydrogen generator which can be apply to the hydrogen station was tested for hydrogen station application. $20Nm^3/hr$ scale compact hydrogen generator was developed by upgrading concept of stacking plate reactor from former $20Nm^3/hr$ scale plate hydrogen generator. concepts for improving system efficiency and performance include such as idea of heat recovery from the exhaust, exhaust duct which is especially design for plate type reactor reinforcement of insulation, enlargement of heat exchange area of reactor, introduction of desulphurizer reactor and PROX rector in a compact design, introduction of back fire protection structure of plate burner and so on, We can learn that final prototype of scale-up $20Nm^3/hr$ scale compact hydrogen generator can be operated steadily in 100% road at which over 94% of methane conversion(S/C=3.75) was obtained. In case of making up the weak point, we expect that it is possible to apply to hydrogen station by way of showing an example.

  • PDF

A Numerical Analysis of Flow Characteristics in a Heat Recovery Steam Generator with the Change of Inlet Flow Conditions (배열회수보일러(HRSG)의 입구유동 경계조건에 따른 유동특성 변화에 관한 연구)

  • Kim, Tae-Kwon;Lee, Boo-Yoon;Ha, Ji-Soo
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.3
    • /
    • pp.53-57
    • /
    • 2011
  • The present study has been carried out to analyze the flow characteristics of a heat recovery steam generator with the change of inlet flow conditions by using numerical flow analysis. The inlet of HRSG corresponds the outlet of gas turbine exit and the flow after gas turbine has strong swirl flow and turbulence. The inlet flow condition of HRSG should be included the exit flow characteristics of gas turbine. The present numerical analysis adopted the flow analysis result of gas turbine exit flow as a inlet flow condition of HRSG analysis. The computational flow analysis result of gas turbine exit shows that the maximum axial velocity appears near circular duct wall and the maximum turbulent kinetic energy and dissipation rate exist relatively higher gradient region of axial velocity. The comparison of flow analysis will be executed with change of inlet turbulent flow condition. The first case is using the inlet turbulent properties from the result of computational analysis of gas turbine exit flow, and the second case is using the assumed turbulent intensity with the magnitude proportional to the velocity magnitude and length scale. The computational results of flow characteristics for two cases show great difference especially in the velocity field and turbulent properties. The main conclusion of the present study is that the flow inlet condition of HRSG should be included the turbulent properties for the accurate computational result of flow analysis.