• Title/Summary/Keyword: Hazard management

Search Result 1,096, Processing Time 0.03 seconds

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Exposure and Risk Assessments of Multimedia of Arsenic in the Environment (환경 중 비소의 매체통합 노출평가 및 위해성평가 연구)

  • Sim, Ki-Tae;Kim, Dong-Hoon;Lee, Jaewoo;Lee, Chae-Hong;Park, Soyeon;Seok, Kwang-Seol;Kim, Younghee
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.2
    • /
    • pp.152-168
    • /
    • 2019
  • The element arsenic, which is abundant in the Earth's crust, is used for various industrial purposes including materials for disease treatment and household goods. Various human activities, such as the disposal of soil waste, metal mining and smelting, and combustion of fossil fuels, have caused the pollution of the environment with arsenic. Recently, guidelines for arsenic in rice have been adopted by the Korean ministry of food and drug safety to prevent health risks based on rice consumption. Because of the exposure to arsenic and its accumulation in the human body through various channels, such as air inhalation, skin contact, ingestion of drinking water, and food consumption, integrated multimedia risk assessment is required to adopt appropriate risk management policies. Therefore, integrated human health risk assessment was carried out in this study using integrated exposure assessment based on multimedia (e.g., air, water, and soil) and multi-route (e.g., oral, inhalation, and dermal) scenarios. The results show that oral uptake via drinking water is the most common pathway of arsenic into the human body, accounting for 57%-96% of the total arsenic exposure. Among various age groups, the highest exposures to arsenic were observed in infants because the body weight of infants is low and the surface areas of infant bodies are large. Based on the results of the exposure assessment, the cancer and non-cancer risks were calculated. The cancer risk for CTE and RME is in the range of 2.3E-05 to 6.7E-05 and thus is negligible because it does not exceed the cancer probability of 1.0E-04 for all age groups. On the other hand, the cancer risk for RME varies from 6.4E-05 to 1.8E-04 and from 1.3E-04 to 1.8E-04 for infants and preschool children, exceeding the excess cancer risk of 1.0E-04. The non-cancer risks range from 5.4E-02 to 1.9E-01 and from 1.5E-01 to 6.8E-01, respectively. They do not exceed the hazard index 1 for all scenarios and all ages.

Experimental Study on Ignition and Explosion Hazard by Measuring the Amount of Non-volatile (NVR) and Explosion Limit of Biodiesel Mixture (바이오디젤 혼합물의 가열잔분측정과 폭발한계 측정을 통한 발화 및 폭발위험성에 대한 실험적인 연구)

  • Kim, Ju Suk;Koh, Jae-Sun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.182-193
    • /
    • 2022
  • Purpose: By measuring and evaluating the risk of biodiesel through non-volatile residue (NVR) and flash point and explosion limit measurement at a specific temperature according to ASTM test standards, the risk of chemical fire causative substances is identified and a universal evaluation method By derivation and securing the risk-related data of the material, it can be used for the identification and analysis of the cause of the fire, and it can be applied to the risk assessment of other chemical substances Method: In order to measure the risk of biodiesel, it was measured using the non-volatile residue(NVR) measurement method, which measures how much flammable liquid is generated at a specific temperature. Heating was tested by applying KS M 5000: 2009 Test Method 4111. In addition, the flash point was measured using the method specified in ASTM E659-782005, and the energy supply method was measured using the constant temperature method. In addition, the explosion limit measurement was conducted in accordance with ASTM E 681-04 「Standard test method for concentration limits of flammability of chemicals(Vapors and gases)」 test standard. Result: As a result of checking the amount of combustible liquid by the non-volatile residue (NVR)measurement method, the non-volatile residue(NVR) of general diesel when left at 105±2℃ for 3 hours was about 30% (70% of volatile matter) and about 4% of biodiesel. In addition, similar results were obtained for the non-volatile residue(NVR)heating temperature of 150±2℃, 3 hours and 200±2℃ for 1 hour, and white smoke was generated at 200℃ or higher. In addition, similar values were obtained as a result of experimentally checking the explosion (combustion) limits of general diesel, general diesel containing 20% biodiesel, and 100% biodiesel. Therefore, it was confirmed that the flammability risk did not significantly affect the explosion risk. Conclusion: The results of this study suggested the risk judgment criteria for mixtures through experimental research on flammable mixtures for the purpose of securing the effectiveness, reliability, and reproducibility of the details of the criteria for determining dangerous substances in the existing Dangerous Materials Safety Management Act. It will be possible to provide reference data for the judgment criteria for flammable liquids that are regulated in the field. In addition, if the know-how for each test method is accumulated through this study, it is expected that it will be used as basic data in the research on risk assessment of dangerous substances and as a basis for research on the determination of dangerous substances.

Epidemiologic Study of Frostbites and Its Current Managements in Community Hospital (지역 병원에서 동상 환자에 대한 역학에 관한 연구 및 최근 치료)

  • Kim, Dong Chul;Min, Byung Duk;Kim, Ji Hoon;Chung, Chang Eun;Lee, Chong Kun;Yu, Sung Hoon
    • Journal of the Korean Burn Society
    • /
    • v.24 no.2
    • /
    • pp.21-29
    • /
    • 2021
  • Purpose: Frostbite is a hazard to people exposed to cold environments. With the progression of modern industrial development and change of leisure behavior encountering cold environments, frequent accidental exposure to frostbite injury during work and human behavior is increasing, and the predisposing factors of frostbite were greatly changed than before. The purpose of this study was to make epidemiological analysis, and to review the treatment outcomes of frostbite. Methods: From March 2010 to February 2021, this study has included 27 patients with second- to third-degree frostbite injuries in Advanced Burn Reconstruction Center, Bundang Jesaeng Hosptial. A retrospective study was made about the distribution of age, gender, predisposing factors, prevalent area, type of managements, and the length of treatment period. Results: In our institution, acute management of frostbite patients has included rewarming, anticoagulation therapy (acetylsalicylic acid), and agents to improve vascular perfusion (lipo-prostaglandin E1 [Eglandin®]). The 25 frostbite patients with second-degree frostbite (92.6%) were successfully managed by the conservative treatment alone with a mean of 20.3 days healing time. Two patients with third-degree frostbite (7.4%) also showed good outcomes after surgical reconstruction with a mean of 59 days healing time. In our clinical experiences of third-degree frostbite, definitive surgical reconstruction should be recommended to wait for more than 4~6 weeks for identification of clear demarcation of necrotic tissue caused by frostbite. In this study, 43 frostbite injuries site in 27 frostbite patients occurred. Among them, 15 patients (55.6%) had multiple-site frostbite injury. The most common predisposing cause of frostbite was refrigerant gas accidents (44.4%), followed by outdoor activity in cold environments (40.8%), misapplying ice pack for treatment purposes (7.4%), barefoot walking on the cold ground (3.7%), and loss of consciousness in cold grounds (3.7%). The most prevalent sites of frostbite injuries revealed as the hand (58.1%), followed by the foot (32.6%), face (7.0%), and abdomen (2.3%). And in the winter season from the November to March, the incidence rate of frostbite injuries was high at 74.1%. Conclusion: This study included 27 frostbite patients with 43 frostbite sites since last decade in a single institution at the community hospital. The frostbite patients with second-degree frostbite (92.6%) were successfully healed by the conservative treatment alone with a mean of 20.3 days healing time. The most common predisposing cause of frostbite was refrigerant gas accidents (44.4%), followed by outdoor activity in cold environments, etc. The most prevalent site of frostbite injuries was the hand (58.1%). And the most prevalent seasonal incidence of frostbite was from November to March (74.1%).

The Causes of Conflict and the Effect of Control Mechanisms on Conflict Resolution between Manufacturer and Supplier (제조-공급자간 갈등 원인과 거래조정 방식의 갈등관리 효과)

  • Rhee, Jin Hwa
    • Journal of Distribution Research
    • /
    • v.17 no.4
    • /
    • pp.55-80
    • /
    • 2012
  • I. Introduction Developing the relationships between companies is very important issue to ensure a competitive advantage in today's business environment (Bleeke & Ernst 1991; Mohr & Spekman 1994; Powell 1990). Partnerships between companies are based on having same goals, pursuing mutual understanding, and having a professional level of interdependence. By having such a partnerships and cooperative efforts between companies, they will achieve efficiency and effectiveness of their business (Mohr and Spekman, 1994). However, it is difficult to expect these ideal results only in the B2B corporate transaction. According to agency theory which is the well-accepted theory in various fields of business strategy, organization, and marketing, the two independent companies have fundamentally different corporate purposes. Also there is a higher chance of developing opportunism and conflict due to natures of human(organization), such as self-interest, bounded rationality, risk aversion, and environment factor as imbalance of information (Eisenhardt 1989). That is, especially partnerships between principal(or buyer) and agent(or supplier) of companies within supply chain, the business contract itself will not provide competitive advantage. But managing partnership between companies is the key to success. Therefore, managing partnership between manufacturer and supplier, and finding causes of conflict are essential to improve B2B performance. In conclusion, based on prior researches and Agency theory, this study will clarify how business hazards cause conflicts on supply chain and then identify how developed conflicts have been managed by two control mechanisms. II. Research model III. Method In order to validate our research model, this study gathered questionnaires from small and medium sized enterprises(SMEs). In Korea, SMEs mean the firms whose employee is under 300 and capital is under 8 billion won(about 7.2 million dollar). We asked the manufacturer's perception about the relationship with the biggest supplier, and our key informants are denied to a person responsible for buying(ex)CEO, executives, managers of purchasing department, and so on). In detail, we contact by telephone to our initial sample(about 1,200 firms) and introduce our research motivation and send our questionnaires by e-mail, mail, and direct survey. Finally we received 361 data and eliminate 32 inappropriate questionnaires. We use 329 manufactures' data on analysis. The purpose of this study is to identify the anticipant role of business hazard (environmental dynamism, asset specificity) and investigate the moderating effect of control mechanism(formal control, social control) on conflict-performance relationship. To find out moderating effect of control methods, we need to compare the regression weight between low versus. high group(about level of exercised control methods). Therefore we choose the structural equation modeling method that is proper to do multi-group analysis. The data analysis is performed by AMOS 17.0 software, and model fits are good statically (CMIN/DF=1.982, p<.000, CFI=.936, IFI=.937, RMSEA=.056). IV. Result V. Discussion Results show that the higher environmental dynamism and asset specificity(on particular supplier) buyer(manufacturer) has, the more B2B conflict exists. And this conflict affect relationship quality and financial outcomes negatively. In addition, social control and formal control could weaken the negative effect of conflict on relationship quality significantly. However, unlikely to assure conflict resolution effect of control mechanisms on relationship quality, financial outcomes are changed by neither social control nor formal control. We could explain this results with the characteristics of our sample, SMEs(Small and Medium sized Enterprises). Financial outcomes of these SMEs(manufacturer or principal) are affected by their customer(usually major company) more easily than their supplier(or agent). And, in recent few years, most of companies have suffered from financial problems because of global economic recession. It means that it is hard to evaluate the contribution of supplier(agent). Therefore we also support the suggestion of Gladstein(1984), Poppo & Zenger(2002) that relational performance variable can capture the focal outcomes of relationship(exchange) better than financial performance variable. This study has some implications that it tests the sources of conflict and investigates the effect of resolution methods of B2B conflict empirically. And, especially, it finds out the significant moderating effect of formal control which past B2B management studies have ignored in Korea.

  • PDF

The Analysis of Radiation Exposure of Hospital Radiation Workers (병원 방사선 작업 종사자의 방사선 피폭 분석 현황)

  • Jeong Tae Sik;Shin Byung Chul;Moon Chang Woo;Cho Yeong Duk;Lee Yong Hwan;Yum Ha Yong
    • Radiation Oncology Journal
    • /
    • v.18 no.2
    • /
    • pp.157-166
    • /
    • 2000
  • Purpose : This investigation was peformed in order to improve the health care of radiation workers, to predict a risk, to minimize the radiation exposure hazard to them and for them to realize radiation exposure danger when they work in radiation area in hospital. Methods and Materials : The documentations checked regularly for personal radiation exposure in four university hospitals in Pusan city in Korea between January 1, 1993 and December 31, 1997 were analyzed. There were 458 persons in this documented but 111 persons who worked less then one year were excluded and only 347 persons were included in this study. Results : The average of yearly radiation exposure of 347 persons was 1.52$\pm$1.35 mSv. Though it was less than 50mSv, the limitaion of radiation in law but 125 (36%) people received higher radiation exposure than non-radiation workers. Radiation workers under 30 year old have received radiation exposure of mean 1.87$\pm$1.01 mSv/year, mean 1.22$\pm$0.69 mSv between 31 and 40 year old and mean 0.97$\pm$0.43 mSv/year over 41year old (p<0.001). Men received mean 1.67$\pm$1.54 mSv/year were higher than women who received mean 1.13$\pm$0.61 mSv/year (p<0.01). Radiation exposure in the department of nuclear modicine department in spite of low energy sources is higher than other departments that use radiations in hospital (p<0.05). And the workers who received mean 3.59$\pm$1.81 msv/year in parts of management of radiation sources and injection of sources to patient receive high radiation exposure in nuclear medicine department (p<0.01). In department of diagnostic radiology high radiation exposure is in barium enema rooms where workers received mean 3.74$\pm$1.74 mSv/year and other parts where they all use fluoroscopy such as angiography room of mean 1.17$\pm$0.35 mSv/year and upper gastrointestinal room of mean 1.74$\pm$1.34 mSv/year represented higher radiation exposure than average radiation exposure in diagnostic radiology (p<0.01). Doctors and radiation technologists received higher radiation exposure of each mean 1.75$\pm$1.17 mSv/year and mean 1.50$\pm$1.39 mSv/year than other people who work in radiation area in hospital (p<0.05). Especially young doctors and technologists have the high opportunity to receive higher radiation exposure. Conclusions : The training and education of radiation workers for radiation exposure risks are important and it is necessary to rotate worker in short period in high risk area. The hospital management has to concern health of radiation workers more and to put an effort to reduce radiation exposure as low as possible in radiation areas in hospital.

  • PDF