• 제목/요약/키워드: HRSG

검색결과 80건 처리시간 0.032초

멀티버너 보일러용 열교환기 모듈 특성 시험 - 부하별 특성 결과 - (Experimental Study on Thermal Characteristics of Heat Exchanger Modules for Multi Burner Boiler - Part Load Test Results -)

  • 김종진;최규성;기호충;강새별
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.1025-1030
    • /
    • 2008
  • We develop heat exchanger modules for a multi-burner boiler. The heat exchanger module is kind of a heat recovery steam generator (HRSG). This heat recovery system has 4 heat exchanger modules. The 1st module consists of 27 bare tubes due to high temperature exhaust gas and the others consist of 27 finned tubes. The maximum steam pressure of each module is 10 bar and tested steam pressure is 4 bar. In order to test these heat exchanger modules, we make a 0.5t/h flue tube boiler (LNG, $40\;Nm^3/h$). The test results of 100% boiler load show that heat transfer rate of 1st module is 49.7 Mcal/h which is 34% of total heat transfer rate and that of 2nd module is 82.6 Mcal/h which is 57% of total heat transfer rate. The reason of higher the heat transfer rate of 2nd module than that of 1st module is that the 2nd heat exchanger module has finned tubes instead of bare tube. The boiler load 50% results show that only 2 heat exchanger modules are needed to extract the heat from the flue gas to water. From this result, it is very important of optimum design of the first finned tube among all water tubes.

  • PDF

기기냉각수 폐열회수용 흡수식 히트펌프의 부분부하 성능에 관한 연구 (A Study on Partial Load Performance of Absorption Type Heat Pump for Waste Heat Recovery of Closed Cooling Water)

  • 박병철;김태형;김광수
    • 에너지공학
    • /
    • 제28권2호
    • /
    • pp.47-54
    • /
    • 2019
  • 복합화력발전소 에너지절감 사업으로 폐열회수용 흡수식 히트펌프가 설치됨에 따라 부분부하(Partial Load)에서의 성능 데이터 확인을 위해 성능시험을 실시하였다. 부분 부하에서 히트펌프 가동에 따른 운전 데이터 변화는 다음과 같다. 기기냉각수(CCW) 배열 및 배열회수열교환기(HRSG)로부터 공급되는 저압증기(LP STM)의 일부가 히트펌프의 열원으로 공급되므로 지역난방열 생산이 증대된다. 그러나 증기터빈으로 공급되는 저압증기의 유량감소에 따라 증기터빈 출력이 감소된다. 또한 고압 지역난방열교환기(HP-DH) 및 저압 지역난방열교환기(LP-DH)로 공급되는 고압터빈(HPT) 배기증기의 유량 저하에 따라 HP-DH 및 LP-DH의 열생산량도 감소한다. 부분부하에서는 정격부하 대비 히트펌프에 운전에 따른 터빈 출력 저하가 큰 것으로 나타났으며, 이에 따라 부분 부하에서는 발전소 전체의 열 생산 증가량, 전기출력 감소량을 종합적으로 고려하여 히트펌프 운전 여부를 결정해야 한다.

증기연계 공정을 가지는 석탄가스화 복합발전플랜트의 성능해석 (Performance Analysis of the Integrated Gasification Combined Cycle Power Plant with Steam Integration)

  • 이찬
    • 한국유체기계학회 논문집
    • /
    • 제12권1호
    • /
    • pp.43-50
    • /
    • 2009
  • Waste heat recovery process designs and performance analyses are conducted on the IGCC(Integrated Gasification Combined Cycle) power plants integrated with two different coal gasification and gas cleanup processes by Shell and GE/Texaco. Through the analysis results, the present study provides the steam integration concept between the HRSG and the chemical processes of IGCC power plant, and investigates the effect of steam integration on the power generation of IGCC power plant. The present simulation results show less steam power output and higher overall IGCC efficiency of the Shell-based power plant than the GE/Texaco.

관류형 아임계압 배열회수보일러의 열성능 모델링과 검증 (Modelling and Verification of Once-Through Subcritical Heat Recovery Steam Generator)

  • 이채수;최영준;김현기;양옥철;정재헌
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 추계학술대회
    • /
    • pp.1692-1697
    • /
    • 2004
  • The once-through heat recovery steam generator is ideally matched to very high temperature and pressure, well into the supercritical range. Moreover this type of boiler is structurally simpler than drum type boiler. In drum type boiler, each tube play a well-defined role: water preheating, vaporization, superheating. Empirical equations are available to predict the average heat transfer coefficient for each regime. For once-through heat recovery steam generator, this is no more the case and mathematical models have to be adapted to account for the disappearance of drum type economizer, boiler, superheater. General equations have to be used for each tube of boiler, and actual heat transfer condition in each tube has to be identified.

  • PDF

타워용 태양열발전 시스템 흡수기 기술동향 (Technical Trend of Receiver for Solar Power Tower)

  • 김종규;김진수;이상남;강용혁
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.161-164
    • /
    • 2008
  • For the development of solar thermal power tower plant from the early 80' to today, various kinds of receiver have been tested and evaluated. Most of 1st generation receiver used water/steam as a working fluid to operate steam turbine and now the first commercial solar power tower PS-10 also makes saturated steam. However, to increase thermal efficiency of storage system and to obtain practical use of solar energy, molten salt system have been used from THEMIS project in France at 1984. The Solar Tres plant of 17 MWe power generation will be constructed in Spain and have plan to operate 24 hours in summer. The air volumetric receiver system can be integrated with combined cycle of gas turbine and HRSG and also with steam turbine easily. Therefore, related researches to develop higher efficient solar power tower plant and to operate with stable are widely performed in the world.

  • PDF

엑서지 단가를 각 작동유체별로 나눈 열경제학 (CGAM 문제해석) (Thermoeconomics to divided the energetic cost into each working fluid (CGAM problem analysis))

  • 김덕봉;김덕진
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 추계학술대회논문집B
    • /
    • pp.222-227
    • /
    • 2000
  • At representative thermoeconomic theory to determine the unit cost of multiple products, there are the $\ulcorner$SPECO$\lrcorner$ method of Tsatsaronis's study group and the $\ulcorner$MOPSA$\lrcorner$ method of chung-ang university phase laboratory. Against this theory, we propose new theory called $\ulcorner$Thermoeconomics to divide the exergetic cost into each working fluid$\lrcorner$ in this study. Also, we apply new thermoeconomic theory to CGAM problem (30MW-grade imaginary gas turbine cogeneration power plant) that it is representative power system in thermoeconomics theory, and we fixed to interpreted the unit cost of electricity on the part of gas turbine and the unit cost of steam exergy(enthalpy) on the part of HRSG.

  • PDF

폐열회수 보일러의 동특성 시뮬레이션 (Dynamic Simulation of Heat Recovery Steam Generator)

  • 이기현;이동수;조창호
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.847-852
    • /
    • 2001
  • A thorough understanding of the transient behavior during load following and start-up is essential in the design and operation of an heat recovery steam generator(HRSG). During this period of time, material that is exposed to high temperature and experiences a large temperature variation is subject to high thermal stress. APESS(Advanced Plant Engineering & Simulation System) is a dynamic simulation software for power plant which is under being developed by Doosan Heavy Industries & Construction Co., Ltd. This paper present the introduction of APESS and the result of simulation for an heat recovery steam generator.

  • PDF

복합화력발전을 위한 통합감시제어 시스템 개발 (A Development of the integrated monitoring and control system for the combined cycle power plant)

  • 이봉국;신용학;전태영;이승주;이광순;원왕연
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1553-1554
    • /
    • 2008
  • 본 논문에서 복합 화력 발전을 위한 개방화 되고 표준화된 보일러/터빈 통합 감시제어 시스템을 개발하였고, 검증하였다. 통합 감시 제어 시스템은 복합 화력 공정의 HRSG, BOP, DEHC 계통을 위한 통합 감시 제어 시스템이다. 복합 화력 공정에서 시스템은 다양한 운전모드와 잦은 기동, 정지에 의해 운영되는 특징이 있다. 통합감시제어시스템은 복합모드 제어를 수행하고 고급제어를 포함하는 고기능제어 시스템으로 개발되었다. 타 시스템과의 효율적인 연계를 위해 표준화된 인터페이스의 개방형 시스템으로 개발하였으며, 원거리관리를 위한 Web monitoring 기능을 수행하고, 효율적인 실시간 이력 시스템을 포함한다. 개발된 시스템은 현장에서 실제로 검증되었다.

  • PDF

현장탐방 - (주)세일엔지니어링

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • 통권304호
    • /
    • pp.76-85
    • /
    • 2015
  • 최근들어 전력 소비량이 크게 늘어나자 정부는 원활한 전력 공급을 위해 제5차 및 제6차 전력수급계획을 세우고 2022년까지 발전소 건설을 목표로 함에 따라 전국 곳곳에서 발전소 건설공사가 한창이다. 이 중 PMP(주)가 경기도 파주시에 건설 중인 장문 천연가스발전소는 1,820MW 규모의 천연가스복합화력 발전소다. 지난 6월 1일 착공에 들어가 오는 2017년 3월 말까지 완공될 예정이다. 장문 천연가스발전소는 제5차 전력 수급기본계획에 따른 국가 기간산업으로 수도권 북부지역에 전력을 충분히 공급함은 물론 주변지역의 대규모 산업단지와 기업체에도 공급 가능성이 큰 대규모 발전소다. 또한 SK그룹은 풍부한 발전소 운영경험을 기반으로 고효율 발전설비를 갖춤으로써 전력시장에서 높은 경쟁력을 확보할 수 있을 것으로 기대하고 있다. (주)세일엔지니어링(대표 오세현)은 장문 현장에서 #11, #12의 2기 HRSG(Heat Recovery steam Generator) 설치공사를 SK건설(현장소장 이원기)로부터 하도급 받아 시공하고 있다. 본지는 2017년 3월 말까지의 완공을 목표로 무결점 시공에 올인하고 있는 (주)세일엔지니어링의 주남식 현장소장을 만났다.

  • PDF

철구조물의 설계방법에 대한 비교 연구 (Comparative Study of Design Methods for Manufacturing of Steel Structure)

  • 김동권;최재승;황석환
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 추계학술대회논문집A
    • /
    • pp.357-362
    • /
    • 2000
  • Allowable stress design(ASD) method has been widely used to design steel structures such as boiler and heat recovery steam generator(HRSG) of power plant. However, many researchers are recently intrested in road and resistance factor design(LRFD) method which may take the place of ASD. In this work, the weight calculation of steel structure was compared when ASD and LRFD were applied respectively. For the calculation of weight of steel structure, computer program was developed and applied to obtain beam weight. Using this program and GTSTRUDL, structural design program, weight of steel structure is calculated. As a result of weight calculation, maximum 5.4% of weight reduction is achieved among examples of this study by applying LRFD comparing with the result of ASD, and those results quite dependent on the applied load and member classification.

  • PDF