• Title/Summary/Keyword: HMI system

Search Result 211, Processing Time 0.033 seconds

Development of Controlled Switching Device for High Voltage Circuit Breakers II (초고압차단기용 개폐제어기 개발(II))

  • Kim, Dong-Hyun;Kim, Yeon-Poong;Lee, Hyun-Doo;Lee, Soo-Byeong;Kim, Young-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1041-1043
    • /
    • 2005
  • It is expected to reduce stresses to components of high voltage circuit breaker and transferred switching surge from power system by applying controlled switching technique to high voltage system. This technique has already been applied to switch shunt reactor or capacitor bank in advanced countries. In this paper, operating software is installed in developed controlled switching device and HMI(Human-machine Interface) is under developing, In the future, this technique is expected to contribute to S.A(Substation Automation).

  • PDF

Development of Greenhouse Environment Monitoring & Control System Based on Web and Smart Phone (웹과 스마트폰 기반의 온실 환경 제어 시스템 개발)

  • Kim, D.E.;Lee, W.Y.;Kang, D.H.;Kang, I.C.;Hong, S.J.;Woo, Y.H.
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.18 no.1
    • /
    • pp.101-112
    • /
    • 2016
  • Monitoring and control of the greenhouse environment play a decisive role in greenhouse crop production processes. The network system for greenhouse control was developed by using recent technologies of networking and wireless communications. In this paper, a remote monitoring and control system for greenhouse using a smartphone and a computer with internet has been developed. The system provides real-time remote greenhouse integrated management service which collects greenhouse environment information and controls greenhouse facilities based on sensors and equipments network. Graphical user interface for an integrated management system was designed with bases on the HMI and the experimental results showed that a sensor data and device status were collected by integrated management in real-time. Because the sensor data and device status can be displayed on a web page, transmitted using the server program to remote computer and mobile smartphone at the same time. The monitored-data can be downloaded, analyzed and saved from server program in real-time via mobile phone or internet at a remote place. Performance test results of the greenhouse control system has confirmed that all work successfully in accordance with the operating conditions. And data collections and display conditions, event actions, crops and equipments monitoring showed reliable results.

Development of power system stabilization program using optimization method (최적화 기법이 적용된 전력계통 안정화 시스템 개발)

  • Ahn, Chang-Han;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.370-374
    • /
    • 2015
  • Various protective equiptments are used for the power system control and protection. Numerous facilities are monitored at the same time in real time and introduction of optimization method and analysis of the method are required for generation control and facility management considering the demand fluctuations. However, the existing system analysis programs are difficult to link with the other sw and there are some problems with user convenience. To solve these problems the present conditions of the system are figured out in real time and the equipment insert method was estimated by optimization method, and the system that showed the system analysis program is developed. PSS/E has been used as system anlysis program for stabilizing system development which applied the optimization. method and Python language is applied in order to link the input and output values with the DB automatically. Lastly, DLL of matlab has been made included in C++ for solving the objective function using opmization method.By linking this to DB, power flow was calculated in PSS/E and the result was represented by Intouch screen.

CIM-based System for Real-time Voltage Stability Analysis (공통정보모델(CIM) 기반의 실시간 전압안정도 해석)

  • Lee, Sung-Woo;Jang, Moon-Jong;Seo, Dong-Wan;Namkoong, Won;Heo, Soung-Ouk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.48-56
    • /
    • 2015
  • There is a wide variety of system and applications in the power system. However, they have compatibility issues because they use different data standard and communication method. With the introduction of the smart grid, power system has been grow and diversified. Therefore power system need to be compatible with each other and the interoperability between applications is increasingly important. Thus, the IEC established IEC61970 and CIM Standard data exchange model for interoperability and system integration. Server-Client system was constructed which using CIM HSDA(Part4), a standard communication model, presented in IEC 619710. Also, self-developed real-time voltage stability analysis application and contingency analysis application was used. CIM HSDA was used for data input and real-time analysis. Tolerance of result which is in the range of allowable derived by Perform real-time voltage stability and contingency analysis of Jeju power system, and then compare it's result with PSS/E result.

A Study on Improvement of PSD Interface Using 2.4GHz Wireless Communication, (2.4GHz 무선 통신을 이용한 PSD 인터페이스 개선에 관한 연구)

  • Kim, Jae-Pil;Hyun, Yong-Sub;Chang, Kyong-Song
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1408-1415
    • /
    • 2007
  • To operate Platform Screen Door (PSD) automatically, the operational data of PSD and the train must be interfaced properly. PSD and train are operated together by the signaling system in Automatic Train Operation (ATO) signaling system zone where interfaces are provided between PSD and train. However, the additional PSD interface system with train is required in train operating zone without the interface between PSD and train. For the PSD interface, the wireless communication system or the train status (train correct stop status / train door status) detection system has been used. Seoul Metro line No.2. has the PSD wireless communication system using 447MHz band RF. For the safety of PSD operation, it is required to prevent RF interference in the subway environment where many frequencies exist. In this paper, the PSD wireless communication system is developed using 2.4GHz band RF to prevent the interference of the wireless communication and increase the traffic of the PSD interface. Furthermore, the improved system can store, manage and display the PSD and train operational data using Human Machine Interface (HMI) in the train's driver cab.

  • PDF

The Modernization of Automatic Control facilities of Hydro Power Plant (수력발전소 자동제어설비의 현대화)

  • Kwon, O-Geuk;Kwon, Young-June;Song, Young-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.69-70
    • /
    • 2008
  • Automatic control systems(AVR, Governor, Synchronizer) installed $1970{\sim}1980$ in K-water were considered to be rehabilitated around 2000. Moreover, Korea Power Exchange market system was changed from PPA (Power Purchase Agreement) to a bidding system. Therefore, depending on the power quality, the power provider could achieve additional profits. It is the excitation system and governor that have the functions of enhancing power necessities. During the 20 to 30 years of generator operation, there were many major and minor problems. Examples are SCR burnout (Andong: Excitation system), hunting (Imha: governor), field circuit breaker failure (Chungju 1st: excitation system), the rise of leakage current (Chungju 2nd: excitation system), power supply burnout (Chungju 2nd: governor). These are the typical examples of malfunction which hindered the generator operation and, consequently, diminished the profit of power business. In order to satisfy the needs of the power market and prevent malfunctions mentioned above, the rehabilitation of AVRs and governors were executed. A new system was made to have the flexibility of ancillary service (GF, AGC, etc.), PSS function. With user friendly HMI software, it is more convenient for the operator to fulfill suitable maintenance. It was possible to connect SCADA system by opening protocol of AVR, governor for the efficiency of operation and maintenance.

  • PDF

BIM Based Intelligent Excavation System (BIM 기반 지능형 굴삭시스템)

  • Kim, Jeong-Hwan;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • Earthwork is important in terms of construction time and duration, and highly related to the construction productivity. However, current earthwork system has stick to labor intensive process depending on skilled operator's heuristic decision making, so it is hard to improve overall productivity. To overcome this drawback, this paper presents a BIM based Intelligent Excavation System(IES). The BIM technology is applied in the excavation task planning system, Human-Machine Interface for remote-control/autonomous work environment, and web-based Project Management Information System(PMIS) in the IES integration process, and the results are addressed.

Monitoring System with PLC I/O for Car Parking Lot (Car Parking Lot 모니터링 시스템)

  • Lee, Seong-Jae;Kim, Jae-Yang
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.511-512
    • /
    • 2007
  • The monitoring system has won acceptance as a premium mark that identifies the highest standard of product quality in advanced industry. The TOP features with multi-I/O ports and VGA & RCA TV-out ports supporting mirroring & multiple dual-display modes by windows 0/5. With the choice of versatile stands, panel mount, or VESA wall-mount swing arm and connecting to modem. Wireless keyboard, Customer Display and Card Reader, is your idea Panel system for the application of TOP(Touch Operation Pannel), KIOSK, or Office / Factory Automation. TOP is the hardware and software product that transacts all kind of functions for advanced technology equipment to button, switch, voice and graph etc so that let consumer use easily Industrial HMI System Touch Panel. System characteristics: Easy of use and flexibility to the user, Present a high value solution and advanced function for many Application, Factory Automation, Office Automation, Building Automation System, Information Service System, etc. Analog Touch - 2MB Flash Memory for Saving Screen Data - RS-232C/422 Serial Port - Multi Language Support.

  • PDF

Design and Development of Master System for Monitoring Wide Area Power System (광역 전력계통 감시를 위한 상위 Master System 설계)

  • Kim, S.T.;Lee, J.H.;Kim, J.Y.;Lee, D.C.;Moon, Y.H.;Kim, T.H.;Yoon, J.Y.;Kim, D.J.;Lee, B.J.;Han, S.W.;Nam, H.K.;Sim, K.S.;Lee, S.J.;Jin, B.K.
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.243-245
    • /
    • 2006
  • In this paper, the master system of Wide Area Monitoring System in order to prevent reaching a fault influence toward power system is proposed. This system has three real time algorithms and a on-line one using i-piu transfer data and provides operators with various understandable monitoring viewers in HMI based on raw data and algorithm results.

  • PDF

Microgrid operating method in realtime pricing (실시간 전기요금제에서 마이크로그리드의 운용 방법)

  • Jyung, Tae-Young;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.