• Title/Summary/Keyword: HIL-Test

Search Result 46, Processing Time 0.02 seconds

Evaluating System for Fuel Injector with the Condition of a Driving Vehicle Mode Using an ECU HILS (ECU HILS를 이용한 실차 주행 조건에서의 인젝터 평가시스템)

  • Lee, Choong-Hoon
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.6
    • /
    • pp.812-828
    • /
    • 2010
  • A fuel injection system using an ECU HILS as an alternate to a vehicle test for the fuel injectors was developed. The throttle position, vehicle speed, engine speed, crank position, cam position, intake air flow, and several other sensor signals that are supplied to the ECU were measured and recorded as a data file for a vehicle driven in the FTP-75 mode in a chassis dynamometer. Electric signals that are equivalent to the sensor signals from the vehicle are reconstructed from the recorded data file using data acquisition boards, microprocessors, and computers. All sensor signals are supplied to the ECU with synchronized timing using a computer program. The findings show that the cost and time of vehicle experiments can be reduced using the ECU HILS system. Moreover, the repeatability of the generation of sensor signals can enhance the accuracy of a range of experiment related to vehicle testing. An ECU scanner that scans the sensor signals that are input to the ECU through a serial port was used to assess the accuracy of the reconstructed signals. The scanning results show good agreement with the reconstructed input signals. Injectors were connected to the ECU HILS system and were driven by the system to measure the quantity of injected fuel.

아리랑 위성 2호의 시간동기

  • Kwon, Ki-Ho;Kim, Dae-Young;Chae, Tae-Byung;Lee, Jong-In
    • Aerospace Engineering and Technology
    • /
    • v.3 no.1
    • /
    • pp.109-116
    • /
    • 2004
  • In a satellite time management system, the GPS-based clock synchronization technique[1] has the merits of precision time management by knowing the time difference or the error between the OBT(On Board Time) of the internal processors and GPS time every second. It can be realized employing the DPLL(Digital Phase Loop Lock) and FEP(Front End Processor) circuitry for the clock synchronization[2]. In this paper, a refined DPLL & FEP scheme is proposed to provide the precision, stability and robustness of the operation, which is to compensate the errors and noise of the GPS signal, and also to cope with the case when the GPS signal is lost due to several reasons. The simulation and HIL (Hardware In the Loop) test results using the FM(Flight Model) in the course of KOMPSAT-2(Korea Multi Purpose Satellite-2) design and development are illustrated to demonstrate the salient features of this methodology.

  • PDF

Development of Integrated Orbit and Attitude Software-in-the-loop Simulator for Satellite Formation Flying

  • Park, Han-Earl;Park, Sang-Young;Park, Chandeok;Kim, Sung-Woo
    • Journal of Astronomy and Space Sciences
    • /
    • v.30 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • An integrated orbit and attitude control algorithm for satellite formation flying was developed, and an integrated orbit and attitude software-in-the-loop (SIL) simulator was also developed to test and verify the integrated control algorithm. The integrated algorithm includes state-dependent Riccati equation (SDRE) control algorithm and PD feedback control algorithm as orbit and attitude controller respectively and configures the two algorithms with an integrating effect. The integrated SIL simulator largely comprises an orbit SIL simulator for orbit determination and control, and attitude SIL simulator for attitude determination and control. The two SIL simulators were designed considering the performance and characteristics of related hardware-in-the-loop (HIL) simulators and were combined into the integrated SIL simulator. To verify the developed integrated SIL simulator with the integrated control algorithm, an orbit simulation and integrated orbit and attitude simulation were performed for a formation reconfiguration scenario using the orbit SIL simulator and the integrated SIL simulator, respectively. Then, the two simulation results were compared and analyzed with each other. As a result, the user satellite in both simulations achieved successful formation reconfiguration, and the results of the integrated simulation were closer to those of actual satellite than the orbit simulation. The integrated orbit and attitude control algorithm verified in this study enables us to perform more realistic orbit control for satellite formation flying. In addition, the integrated orbit and attitude SIL simulator is able to provide the environment of easy test and verification not only for the existing diverse orbit or attitude control algorithms but also for integrated orbit and attitude control algorithms.

로켓 모션테이블 실시간 모의시험

  • Sun, Byung-Chan;Park, Yong-Kyu;Choi, Hyung-Don;Cho, Gwang-Rae
    • Aerospace Engineering and Technology
    • /
    • v.3 no.1
    • /
    • pp.170-178
    • /
    • 2004
  • This paper deals with six degree-of-freedom HILS(hardware-in-the-loop-simulation) of KSR-III rocket using a TAFMS(three axis flight motion simulator). This TAFMS HILS test is accomplished before main HILS tests in order to verify the control stability in the presence of TAFMS dynamic effects. The TAFMS HILS test includes initial attitude holding tests for INS initial alignment procedures, timer synchronization tests with an auxiliary lift-off signal, real-time calibration tests using an external thermal recorder, open-loop TAFMS operating tests, and final closed-loop TAFMS HILS tests using the TAFMS attitude measurements as inputs to the closed control loop. The HILS tests are accomplished for several flight conditions composed with nominal flight condition, TWD effect added condition, slosh modes and/or bending modes existing condition, and windy condition, etc.

  • PDF

Development of the Integrated Power Converter for the Environmentally Friendly Vehicle and Validation of the LDC using Battery HILS (친환경 자동차용 통합형 전력변환장치의 개발 및 배터리 HILS를 이용한 LDC 검증에 관한 연구)

  • Kim, Tae-Hoon;Song, Hyun-Sik;Lee, Baek-Haeng;Lee, Chan-Song;Kwon, Cheol-Soon;Jung, Do-Yang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1212-1218
    • /
    • 2014
  • For OBC (On-Board Charger) and LDC (Low DC-DC Converter) used as essential power conversion systems of PHEV (Plug-in Hybrid Electric Vehicle), system performance is required as well as reliability, which is need to protect the vehicle and driver from various faults. While current development processor is sufficient for embodying functions and verifying performance in normal state during development of prototypes for OBC and LDC, there is no clear method of verification for various fault situations that occur in abnormal state and for securing stability of vehicle base, unless verification is performed by mounting on an actual vehicle. In this paper, a CCM (Charger Converter Module) was developed as an integrated structure of OBC and LDC. In addition, diverse fault situations that can occur in vehicles are simulated by a simulator to artificially inject into power conversion system and to test whether it operates properly. Also, HILS (Hardware-in-the-Loop Simulation) is carried out to verify whether LDC is operated properly under power environment of an actual vehicle.

Operation System Design of Distribution Feeder with Distributed Energy Resources (분산전원이 연계된 배전선로의 운영시스템 설계)

  • Kim, Seong-Man;Chang, Young-Hak;Kim, Kyeong-Hun;Kim, Sul-Ki;Moon, Chae-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.16 no.6
    • /
    • pp.1183-1194
    • /
    • 2021
  • Traditionally, electric power systems have been known as the centralized structures, which is organized into placing customers at the end of the supply chain. However, recent decades have witnessed the emergence of distributed energy resources(:DERs) such as rooftop solar, farming PV system, small wind turbines, battery energy storage systems and smart home appliances. With the emergence of distributed energy resources, the role of distributed system operators(:DSOs) will expand. The increasing penetration of DERs could lead to a less predictable and reverse flow of power in the system, which can affect the traditional planning and operation of distribution and transmission networks. This raises the need for a change in the role of the DSOs that have conventionally planned, maintained and managed networks and supply outages. The objective of this research is to designed the future distribution operation system with multi-DERs and the proposed distribution system model is implemented by hardware-in-the-loop simulation(HILS). The test results show the normal operation domain and reduction of distribution line loss.