• Title/Summary/Keyword: Ground Drilling

Search Result 144, Processing Time 0.023 seconds

A Study on the Stress Distribution of Steel Water Pipes(II) - Characteristics of Stress Distribution by External Forces and PWHT - (상수도용 도복장간관의 용접 및 외부하중에 의한 응력 특성에 관한 연구(II) - 복합외부하중 및 후열처리에 따른 용접부의 응력분포 특성 -)

  • 윤석환;이승기;나석주;고명환
    • Journal of Welding and Joining
    • /
    • v.19 no.3
    • /
    • pp.292-297
    • /
    • 2001
  • One of the major characteristics that affects the life of welded steel water pipes is the stress distribution caused by welding and external forces. Some studios have bean carried out on the residual stress of steel water pipes. But the results on the stress distributions by welding and complex external forces are rare, because real water pipes operate under the ground and many kinds of external forces act simultaneously on the joints. To understand the complex stress distributions of welded joints, therefore predictions by numerical or analytic methods are required. In this study, temperature and stress distributions in steel water pipes produced by welding are predicted by a three-dimensional finite element method(FEM). Based on these results, stress distributions by welding and complex external forces are evaluated by adopting the same numerical method. The influence of some post weld heat treatments on residual stress distributions is also investigated.

  • PDF

Design Analysis of Substructure for Offshore Wind Pile Excavation (해상풍력 파일 굴착직경 결정을 위한 하부구조물 설계해석)

  • Lee, Gi-Ok;Sun, Min-Young
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.4
    • /
    • pp.48-55
    • /
    • 2019
  • With recent rapid increases in the power generation capacity of offshore wind power generators, reliable structural analysis of the large-scale infrastructure needed to install wind power generators at sea is required. Therefore, technology for heavy marine equipment such as barges and excavation equipment is needed. Under submarine conditions, rock drilling technology to install the substructure for offshore wind pile excavation is a very important factor in supporting a wind farm safely under dynamic loads over periods of at least 20 years. After investigating the marine environment and on-site ground excavation for the Saemangeum offshore wind farm, in this study we suggest.

On the vibration influence to the running power plant facilities when the foundation excavated of the cautious blasting works. (S화력발전소 3, 4호기 증설에 따르는 정밀발파작업으로 인한 인접가동발전기및 구조물에 미치는 파동영향조사)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.8 no.1
    • /
    • pp.3-16
    • /
    • 1990
  • The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill $\varphi{70mm}$ on the calcalious sand stone(sort-moderate-semi hard Rock). The total numbers of feet blast were 88. Scale distance were induces 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagtion Law in Blasting Vibration $V=K(\frac{D}{W^b})^n$ where V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites (m) W : Maximum Charge per delay-period of eighit milliseconds or more(Kg) K : Ground transmission constant, empirically determind on th Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents Where the quantity $D/W^b$ is known as the Scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagrorized in three graups. Cabic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge per delay Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom and over loom distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30m----under l00m----- $V=41(D/3\sqrt{W})^{-1.41}$ -----A Over l00m-----$V= 121(D/3\sqrt{W})^{-1.66}$-----B K value on the above equation has to be more specified for furthur understang about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

A Feasibility Study for Measuring Seismic Acceleration and Building Seismological Observatory (지진가속도 계측 및 지진관측소 구축 타당성 연구)

  • Han, Sang-Mok;Woo, Nam-Sub;Ha, Ji-Ho;Kim, Tea Woo;Lee, Wang-Do;Kim, Ki-Seog;Yang, Jae-Yeol;Kim, Young-Ju
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.3
    • /
    • pp.411-417
    • /
    • 2020
  • Therefore, it was agreed that an earthquake monitoring station should be set up within the site of Handong University by analyzing drilling data and Disaster such as earthquakes is urgently needed to prepare for earthquakes in that people's lives and national development depend on the nation's ability to manage disasters. Many experts say that the Korean Peninsula is also under the influence of earthquakes and is not a safe zone for earthquakes. A seismological observatory will be established in Pohang to monitor ground sensors and study seismic characteristics through the task of "Development of Smart Sensor-based Intelligent Information Platform in Earthquake Region." Therefore, it was agreed to set up a seismological observatory within the site of Handong University by analyzing drilling data and conducting on-site surveys in northern Pohang, which were heavily damaged by liquefaction and earthquakes. In this study, it was decided to make a comprehensive judgment by considering the geological characteristics of the site, whether it can perform functions, and the convenience of construction and maintenance for the final site of the seismological observatory discussed with Handong University. After completing a feasibility review on selecting a site for Handong University, we will establish a seismological observatory and actively utilize it for seismic research using data from alarm issuance and seismic data in the event of a future earthquake.

On the vibration influence to the running power plant facilities when the foundation excavated of the cautious blasting works (삼천포화력발전소 3, 4호기 증설에 따르는 정밀발파작업으로 인한 인접가동발전기 및 구조물에 미치는 진동영향조사)

  • Huh, Ginn
    • Journal of the Korean Professional Engineers Association
    • /
    • v.24 no.6
    • /
    • pp.97-105
    • /
    • 1991
  • The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill ø70mm on the calcalious sand stone (soft-moderate-semi hard Rock). The total numbers of fire blast were 88 round. Scale distance were induces 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagation Law in Blasting Vibration (Equation omitted) where V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites(m) W : Maximum Charge per delay-period of eighit milliseconds o. more(kg) K : Ground transmission constant, empirically determind on the Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents Where the quantity D / W$^n$ is known as the Scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagrorized in three graups. Cubic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge per delay Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom and over 100m distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30 ‥‥‥under 100m ‥‥‥V=41(D/$^3$√W)$\^$-1.41/ ‥‥‥A Over 100 ‥‥‥‥under 100m ‥‥‥V=121(D/$^3$√W)$\^$-1.56/ ‥‥‥B K value on the above equation has to be more specified for furthur understang about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

Analysis of Monthly Excavation Length Depending on Ground Condition and TBM Diameter (터널 보링 머신 공법 구경별 지질조건에 따른 월굴진장 분석)

  • Choi, Jae Jin;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.141-150
    • /
    • 2014
  • This study analyzed monthly excavation length and amount of time occupied by the work item based on drilling reports to record the entire work process of TBM tunnel site. TBM equipment( ${\varnothing}2.6m$, ${\varnothing}3.0m$, ${\varnothing}3.5m$, ${\varnothing}3.8m$) was developed by WIRTH company in Germany. In addition, This study analyzed rising expected monthly excavation length based on the lowest loss rate of operating shifts among the field of nine. Analysis results are confident to be a useful tool when Planning and Managing TBM method construction to the primary planning steps in the field similar to geological conditions and analyzed geological conditions.

On the vibration influence to the running power plant facilities when the foundation excavated of the cautious blasting works. (S 화력발전소 3, 4호기 증설에 따르는 정밀발파작업으로 인한 인접가동발전기 및 구조물에 미치는 진동영향조사)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.9 no.4
    • /
    • pp.3-12
    • /
    • 1991
  • The cautious blasting works had been used with emulsion explosion electric M /S delay caps. Drill depth was from 3m to 6m with Crawler Drill 70mm on the calcalious sand stone (soft-moderate-semi hard Rock) . The total numbers of feet blast were 88. Scale distance were induces 15.52-60.32. It was applied to Propagation Law in blasting vibration as follows .Propagtion Law in Blasting Vibration V=k(D/W/sup b/)/sup n/ where V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites(m) W ; Maximum Charge per delay -period of eight milliseconds or more(Kg) K : Ground transmission constant, empirically determind on the Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents Where the quantity D/W/sup b/ is known as the Scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagrorized in three groups. Cabic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge delay Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom and over loom distance because the frequency is varified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30m--under 100m----V=41(D/ W)/sup -1.41/-----A Over l00m---------V=121(D/ W)/sup -1.56/-----B K value on the above equation has to be more specified for furthur understand about the effect of explosives. Rock strength, And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

Considerations on the Difficulties in Velocity Logging in the Near Surface Environments (천부 지반 환경에서 속도검층 난제들에 대한 고찰)

  • Jo, Churl-Hyun;Byun, Joong-Moo;Hwang, Se-Ho
    • Geophysics and Geophysical Exploration
    • /
    • v.9 no.3
    • /
    • pp.185-192
    • /
    • 2006
  • Cares should be taken when performing the P and S wave velocity loggings in engineering and environmental fields. Some of them are the effect of casing, which is installed to prevent the borehole collapsing when the drilling is done on the loose ground such as soil and/or soft rock, and the discrepancy of the velocities of the same media according to the difference of the source wave frequency spectrum. The elastic moduli obtained from the P and S wave velocity logging have the dynamic characteristics. To overcome these difficulties, the following suggestions are recommended; (1) develop and apply a careful drilling technique that can keep the borehole wall without a casing, and (2) apply the logging methods with the suitable frequency bandwidth for the object of the velocity logging. It is important to make the aseismological engineers understand the difference between the dynamic elastic moduli and the static ones obtained from mechanical test, and to advise them to use the information properly.

Development of Dynamic Cone Penetration Tester Module for Slope Vulnerability Assessment and Correlation of Its Results with Standard Penetration Test Values (비탈면 취약도 평가를 위한 동적콘관입시험기 모듈개발과 표준관입시험값과의 상관관계 연구)

  • Chae, Hwi-Young;Kwon, Soon-dal
    • The Journal of Engineering Geology
    • /
    • v.31 no.4
    • /
    • pp.541-547
    • /
    • 2021
  • To assess the stability of a slope and the likelihood of its loss or collapse requires information about the ground, such as the composition of the stratum and its mechanical characteristics. This information is generally gathered through standard penetration testing (SPT) and cone penetration testing. SPT is not widely used due to problems with accessing slopes, most of which are steep and without ramps. A drop cone penetrometer, a portable device that can make up for these shortcomings, can be used in a limited way in some circumstances. Therefore, we developed a portable drilling machine and a small dynamic cone penetration test module that can easily access a slope site and perform SPT. The correlation of the developed system's results with those from SPT was analyzed. Analysis of the correlation between the energy shear rate passing to the load during the different test types established that the energy shear rate is reflected in the test result. The correlation between corrected dynamic cone penetration testing and corrected SPT was Nd' = 3.13 N'.

A Study on the Simulation of Underground Acoustic Telemetry (지중 원격 음파통신 시뮬레이션 연구)

  • Shin, Younggy
    • Plant Journal
    • /
    • v.18 no.2
    • /
    • pp.41-45
    • /
    • 2022
  • The conventional communication method using mud flow pressure waves has a speed of 1-2 bps, so it takes a long time to communicate, making real-time control impossible. Although the sound wave communication method for improving the communication speed by 10 times or more has been commercialized, its use is limited due to its high price and there are not many application cases. In this study, the simulator corresponding to the facility was developed to develop performance similar to the actual test results. For simulating sound wave communication through a drill pipe, we proposed a governing equation that can simulate friction damping by mud and developed a numerical analysis model. The attenuation factor was corrected by comparing it with the attenuation rate of sound wave energy at the drilling site. The developed numerical analysis model was applied to the QPSK modulation type communication algorithm to confirm the excellent performance of the communication error rate of 0.04% in the ground. This is the communication performance under the condition that noise has not been mixed yet, and in order to apply it, the technology of reproducing the actual noise signal for mixing by securing the field noise data was established.

  • PDF