• Title/Summary/Keyword: Green building design process

Search Result 75, Processing Time 0.021 seconds

Comparative Review of Domestic & USA's Site Design Certification Index and Criteria for Sustainability - Focusing on Water & Soil+Vegetation Index - (국내외 외부공간의 지속가능성 인증지표 및 기준의 비교검토 - 물과 토양 및 식생 평가항목을 중심으로 -)

  • Chun, Seung-Hoon;Chae, Soo-Kwon
    • Journal of Environmental Impact Assessment
    • /
    • v.29 no.6
    • /
    • pp.430-440
    • /
    • 2020
  • The application contents, process, and its limitations are discussed for the setting of Korean legal guides & criteria for water cycle and ecological condition in development project of land use by thorough comparison and examination of prerequisites and credits of water cycle and soil+vegetation by USA's SITES (Sustainable Sites Initiative). In the case of SITES, due to the implementation procedure operated as a non-governmental independent assessment system by Green Business Certification, Inc, the natural condition of water cycle and soil-vegetation items-the key element of ecosystem services can be quantitatively assessed, well along with its legal and institutional guidelines and regulations. On the other hand, in the case of Korea, as a part of the national certification procedure for green building, the ecological area ratio system still have very limited role as an only amenity resource in the creation of artificial green spaces and insufficiency of management system for rain water. In conclusion, it was understood as an urgent situation in necessary for prompt establishment of site's sustainability certification system at the national level, based on management of water circulation and natural soil & vegetation in developed area with consideration of various land uses and types of development projects.

Measuring the Public Service Quality Using Process Mining: Focusing on N City's Building Licensing Complaint Service (프로세스 마이닝을 이용한 공공서비스의 품질 측정: N시의 건축 인허가 민원 서비스를 중심으로)

  • Lee, Jung Seung
    • Journal of Intelligence and Information Systems
    • /
    • v.25 no.4
    • /
    • pp.35-52
    • /
    • 2019
  • As public services are provided in various forms, including e-government, the level of public demand for public service quality is increasing. Although continuous measurement and improvement of the quality of public services is needed to improve the quality of public services, traditional surveys are costly and time-consuming and have limitations. Therefore, there is a need for an analytical technique that can measure the quality of public services quickly and accurately at any time based on the data generated from public services. In this study, we analyzed the quality of public services based on data using process mining techniques for civil licensing services in N city. It is because the N city's building license complaint service can secure data necessary for analysis and can be spread to other institutions through public service quality management. This study conducted process mining on a total of 3678 building license complaint services in N city for two years from January 2014, and identified process maps and departments with high frequency and long processing time. According to the analysis results, there was a case where a department was crowded or relatively few at a certain point in time. In addition, there was a reasonable doubt that the increase in the number of complaints would increase the time required to complete the complaints. According to the analysis results, the time required to complete the complaint was varied from the same day to a year and 146 days. The cumulative frequency of the top four departments of the Sewage Treatment Division, the Waterworks Division, the Urban Design Division, and the Green Growth Division exceeded 50% and the cumulative frequency of the top nine departments exceeded 70%. Higher departments were limited and there was a great deal of unbalanced load among departments. Most complaint services have a variety of different patterns of processes. Research shows that the number of 'complementary' decisions has the greatest impact on the length of a complaint. This is interpreted as a lengthy period until the completion of the entire complaint is required because the 'complement' decision requires a physical period in which the complainant supplements and submits the documents again. In order to solve these problems, it is possible to drastically reduce the overall processing time of the complaints by preparing thoroughly before the filing of the complaints or in the preparation of the complaints, or the 'complementary' decision of other complaints. By clarifying and disclosing the cause and solution of one of the important data in the system, it helps the complainant to prepare in advance and convinces that the documents prepared by the public information will be passed. The transparency of complaints can be sufficiently predictable. Documents prepared by pre-disclosed information are likely to be processed without problems, which not only shortens the processing period but also improves work efficiency by eliminating the need for renegotiation or multiple tasks from the point of view of the processor. The results of this study can be used to find departments with high burdens of civil complaints at certain points of time and to flexibly manage the workforce allocation between departments. In addition, as a result of analyzing the pattern of the departments participating in the consultation by the characteristics of the complaints, it is possible to use it for automation or recommendation when requesting the consultation department. In addition, by using various data generated during the complaint process and using machine learning techniques, the pattern of the complaint process can be found. It can be used for automation / intelligence of civil complaint processing by making this algorithm and applying it to the system. This study is expected to be used to suggest future public service quality improvement through process mining analysis on civil service.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Critical Review about the Character of Communication among Participating Stakeholders in the Improving Alley Landscapes in Residential Neighborhoods Project (주거지골목길 경관개선사업에서 참여 이해관계자의 의사소통 특성)

  • Kim, Yun-Geum;Lee, Ai-Ran
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.2
    • /
    • pp.25-36
    • /
    • 2016
  • This paper discusses the character of communication among participating stakeholders in the Improving Alley Landscapes in Residential Neighborhoods project. The participation of diverse stakeholders in conventional urban redevelopment is considered to delay and complicate the progress of a project. However, in urban regeneration, a field-oriented operating system and collaboration between diverse stakeholders is considered critical to building a sustainable community. A stakeholder is defined as "a person or organization that can influence decision-making or be influenced by it." This paper uses a case study to examine what types of stakeholders participate and what communicative processes and ideas are shared among them. Six neighborhoods were selected out of a total of 26 of Seoul's 2014 Improving Alley Landscapes project. This research was developed through interviews and a review of the literature. The character of communication among stakeholders in the case study is as follows. Firstly, the administration initiated the project but did not show leadership. This was caused by a gap in understanding about the project between city and borough administrations, Further, the city administration lacked experience with projects that placed an emphasis on fieldwork. Tongjand and Banjang, at ancillary institutions, acted as spokespersons and helped people in the community to understand the administrative process. However, because they led communication and used personal relationships to ensure they communicated effectively, the communication process had limits from the perspective of democratic process. Diverse stakeholders expressed their opinions in the public sphere and communicated about them using diverse media. Finally, experts produced the output, facilitated communication, and mediated in conflicts. Because new experts acted as facilitators and mediators, there was a great deal of trial and error. This project has particular significance: Seoul's city government deals with urban space rather than parks and green space, which are limited by boundaries; and whether "green" can be used for urban renovation was tested by several landscape architects, who sought to identify a new role in urban renovation, namely, the role of landscape and landscape architecture. However, the project has some limitations, including an insufficiently detailed project plan, a lack of common understanding among stakeholders, and a short timeframe. A number of stakeholders overcame these limitations to a certain degree. Officials of the Borough and the Dong managed the project and resolved civil complaints. Experts provided special information, and contributed to the design and construction of improvements.

Development of Plant BIM Library according to Object Geometry and Attribute Information Guidelines (객체 형상 및 속성정보 지침에 따른 수목 BIM 라이브러리 개발)

  • Kim, Bok-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.2
    • /
    • pp.51-63
    • /
    • 2024
  • While the government policy to fully adopt BIM in the construction sector is being implemented, the construction and utilization of landscape BIM models are facing challenges due to problems such as limitations in BIM authoring tools, difficulties in modeling natural materials, and a shortage in BIM content including libraries. In particular, plants, fundamental design elements in the field of landscape architecture, must be included in BIM models, yet they are often omitted during the modeling process, or necessary information is not included, which further compromises the quality of the BIM data. This study aimed to contribute to the construction and utilization of landscape BIM models by developing a plant library that complies with BIM standards and is applicable to the landscape industry. The plant library of trees and shrubs was developed in Revit by modeling 3D shapes and collecting attribute items. The geometric information is simplified to express the unique characteristics of each plant species at LOD200, LOD300, and LOD350 levels. The attribute information includes properties on plant species identification, such as species name, specifications, and quantity estimation, as well as ecological attributes and environmental performance information, totaling 24 items. The names of the files were given so that the hierarchy of an object in the landscape field could be revealed and the object name could classify the plant itself. Its usability was examined by building a landscape BIM model of an apartment complex. The result showed that the plant library facilitated the construction process of the landscape BIM model. It was also confirmed that the library was properly operated in the basic utilization of the BIM model, such as 2D documentation, quantity takeoff, and design review. However, the library lacked ground cover, and had limitations in those variables such as the environmental performance of plants because various databases for some materials have not yet been established. Further efforts are needed to develop BIM modeling tools, techniques, and various databases for natural materials. Moreover, entities and systems responsible for creating, managing, distributing, and disseminating BIM libraries must be established.