A Study on the Sangnyang-mun of the Palaces and Government Offices in Goryeo Dynasty (고려시대 궁실건축 상량문 연구)

  • Seo, Chi-Sang
    • Journal of architectural history
    • /
    • v.25 no.6
    • /
    • pp.45-60
    • /
    • 2016
  • Sangnyang-mun(上樑文) is not only a memorial address for the ceremony of putting up the ridge beam, namely the sangnyang-ceremony(上樑式) but also the executional record of building construction. This paper aims at researching on the oldest five sangnyang-muns written for the constructions of palaces and government offices in Goryeo Dynasty, especially viewed in the architectural history. The results of that are as follows: First, it is supposed that sangnyang-mun originated in the ancient Chinese ceremonial songs for the celebration of building construction. Second, as compared against the former times, the sangnyang-muns in Goryeo Dynasty were written to the advanced establishing forms and literary patterns, so to speak, these were the more developed styles. Third, in the 12th century, sangnyang-mun was introduced from Chinese Song to Goryeo. To the late period of J oseon Dynasty, sangnyang-mun had been to write for the sangnyang-ceremony as necessary memorial address. Fourth, the writers of five sangnyang-muns in Goryeo Dynasty were the new civil ministers appointed by the soldier rulers. They wrote the contents of their sangnyang-muns, especially focused to the king's achievements. And in the yugwi-song(六衛頌), they recited six poems in which were complicated the world view and aesthetics of the time.

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

A study on Korean Free Zone and it's growing strategy (우리나라의 동북아 물류거점화전략과 관세자유지역제도의 발전방향)

  • Kang, Jong-Hi;Woo, Jong-Kyun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.16
    • /
    • pp.117-154
    • /
    • 2001
  • The objective of the study is to propose to the strategy to make korean main ports to international logistics center in Northeast Asia. so this study's construction is constructed four steps. First, analysis the environment of economy, business and logistics industry in Northeast Asia. Second, analysis the constructions and characters of Free Zone Act. Third, analysis of Korean Government's policy about Free Zone. Forth, propose the growing strategy of Free Zone. In 1999 Northeast Asia was adopted in Korea, which will facilitate the process and strengthen the international logistics capability as a international logistics hub in Northeast Asia. But only adoption in the point of law is not enough to growing korean main seaport and airport to a international logistics hub. so various strategies are needed. In this study, we propose the growing strategies that are to establish and manage the free zone of ports and its hinterland are: the establishment of a long-term vision of international logistics complexes, the improvement of the proximity to markets/customers by way of linkage of global networks, the activation of the industrial complex in hinterland, the development of the skilled labor and the labor climate, the cooperation between governmental bodies and government/provincial bodies, continuous development of logistics infrastructure and so on.

  • PDF

WTO GPA and BOT Contract (WTO 정부조달협정과 BOT 계약)

  • Chung, Jae-Ho;Woo, Yoon-Suk
    • International Commerce and Information Review
    • /
    • v.8 no.3
    • /
    • pp.193-206
    • /
    • 2006
  • The United States demands that the Korean Government include in the WTO GPA the privately invested projects of the BOT contract. Controversy surrounding BOT contract will continue. As of result of opening up of private investment market including BOT contracts, inflow of foreign capital will be expanded, and it will provide an opportunity for rectifying any unreasonable policies or regulations. With active penetration of foreign companies, there is a possibility for deepening of competition in the private investment market, and if a foreign administrative company is selected, possibility of assigning high value works such as design to foreign companies leaving labor intensive work such as construction to domestic companies exists, and also, difficulties resulting from agreement between the employer and the foreign administrative company exists. Large-scale construction companies must put forth their efficiency and creativity, and through revolutionary constructions by private sectors, reduction in construction cost should be made possible, and must also increase efficiency in maintenance, repair, and management of the facility. On the other hand, in order for Korean construction companies of BOT businesses to be able to enter the foreign BOT industry, the government needs to conduct studies in information and policies of various nations.

  • PDF

Newspaper and Teacher Constructions of Children of Migrant Parents in Rural China (교사들과 신문 보도를 통해서 본 중국 농촌 학교에서의 유수(留守) 아동(left behind children))

  • Kim, Sung won
    • Korean Journal of Comparative Education
    • /
    • v.28 no.2
    • /
    • pp.53-75
    • /
    • 2018
  • This study explores and compares how rural teachers and Chinese newspapers representing the dominant ideology of the state and the local government construct left behind children's problems and solutions. I draw on teacher interviews in two rural schools and the reports of three major Chinese newspapers (2011 to 2015). Teacher and media narratives largely agreed that parental absence and negative mental health consequences were the biggest source of the problem, placing the blame largely on families. However, the narratives diverged when discussing solutions as teachers largely sought institutional structural solutions while the media emphasized the individual role that volunteers could play. School-based activities and teachers' contributions extensively discussed in teacher interviews were muted from newspaper reports that emphasized contributions from government officials and local representatives.

AUTOMATIC ROAD NETWORK EXTRACTION. USING LIDAR RANGE AND INTENSITY DATA

  • Kim, Moon-Gie;Cho, Woo-Sug
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.79-82
    • /
    • 2005
  • Recently the necessity of road data is still being increased in industrial society, so there are many repairing and new constructions of roads at many areas. According to the development of government, city and region, the update and acquisition of road data for GIS (Geographical Information System) is very necessary. In this study, the fusion method with range data(3D Ground Coordinate System Data) and Intensity data in stand alone LiDAR data is used for road extraction and then digital image processing method is applicable. Up to date Intensity data of LiDAR is being studied. This study shows the possibility method for road extraction using Intensity data. Intensity and Range data are acquired at the same time. Therefore LiDAR does not have problems of multi-sensor data fusion method. Also the advantage of intensity data is already geocoded, same scale of real world and can make ortho-photo. Lastly, analysis of quantitative and quality is showed with extracted road image which compare with I: 1,000 digital map.

  • PDF

Consideration of Techniques for Agricultural Water Demands Estimation (농업용수 수요량 예측기법 고찰)

  • Park, Jae-Heung;Lee, Yong-Jig
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.37-40
    • /
    • 2002
  • It is to show the problems of the existing techniques to estimate agricultural water demand and to suggest the new methods considering the water demand for non-irrigated area and decrease of water loss in canal. It is to suggest the methods to improve the techniques for estimating agricultural water demand and to analyze the water demand and supply according to the facilities capacity. Until now, the concept of per the unit used to estimate agriculture water demand is useful to estimate demand, but is insufficient to cope with the variations of conditions in future. And the paddy area of government is not realistic against a trend of decrease. Water demand decrease is caused by constructions of irrigation facilities as constructing of irrigation canal, but application loss ratio is fixed. Increase of the water demand owing to the increase of the yield per the unit area is also the actual condition which is not considered. The guide-line must contain these contents for a demand estimate.

  • PDF

A Study on the Designer's Demands of Building Equipment Systems and Eco-friendly Environment (생태환경·설비시스템 요구도에 관한 연구)

  • Lee, Shi-Woong;Chin, Kyung-Il;Lee, Kye-Byoung;Choi, Seung-Hee
    • KIEAE Journal
    • /
    • v.5 no.1
    • /
    • pp.59-65
    • /
    • 2005
  • Eco-friendly architecture, generally speaking, is considered as the activity of planting more and designing ponds, therefore many clients and constructors prefer to avoid building so due to initial construction costs. This paper aims to examine the cognition of environmental equipment systems and the applicability of echo-friendly building constructions. We examined the designer's demands of building equipment systems and eco-friendly environment and tried to deduce desirable suggestions for the system. We should solve the fundamentals of economical problems in the construction of eco-friendly buildings and we better think that government should make it a policy to advertise it and to reform the taxation system regarding environment friendly buildings.

Building the international network of human resources in electrical construction (전력설비 시공분야 국제인력 네트워크 구축)

  • Lee, J.W.;Lee, H.W.;Lee, H.K.;An, J.M.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2096-2097
    • /
    • 2008
  • Recently environment around electrical constructions is changing very fast. Moreover international economic barrier is also collapsing. From now it's very difficult for electrical contractors to see the domestic market. In order to solve these problems in the future, this paper has investigated about Southeast Asian status for electrical construction. At first this paper is concerned about China and Vietnam. This paper explains about building the international network with workers, who are working in electrical construction and related government agencies in China and Vietnam.

  • PDF

A Study on the Japanese Military Installations of Oiyang-po in Gadeok-do - Focused on the Architectural Characteristics and Constructional Process of an Army Barracks and Artillery Position - (가덕도 외양포의 일본군사시설에 관한 연구 -군막사 및 포대진지의 구축과정과 건축특성을 중심으로-)

  • Lee, Ji-Young;Seo, Chi-Sang
    • Journal of architectural history
    • /
    • v.19 no.3
    • /
    • pp.51-70
    • /
    • 2010
  • This paper aims to examine the constructional background and process of the Japanese military installations of Oiyang-po(外洋浦), especially based on the military secret documents. Furthermore, it aims to analyze the characteristics of the remains. The results are as follow; 1) The number of the Japanese military secret documents concerning with the installations of Oiyang-po, summed up to 33s. Especially, 14 documents about the expropriation of the lands and houses, and the constructions of the artillery position are reserved in "Mildae-ilgi"(密大日記)written from 1893 to 1942. 2) Imperialist Japan constructed firstly the military installations of Oiyang-po against the Russo-Japanese War. After the moving of the artillery headquarters into Masan in 1911, these installations had been maintained for the defense of Busan and Jinhae Bays. 3) As soon as 1904, the lands and houses of Oiyang-po were forcibly expropriated according to (韓日議定書). The Korean Government payed the expropriation prices to the dwellers. But the amount of money were too small and were lately payed. Moreover the dwellers' fishery right were never recompensed. 4) In 1904, the artillery headquarters and position were constructed by the 3rd Chookseong-dan(築城團) under the command of Matsui, a military engineer officer. The executional constructions were accomplished by the Japanese construction contractors. 5) After the moving of the artillery headquarters into Masan in 1911, the 3rd Chookseong-dan had usually repaired and consolidated the explosive warehouses and artillery facilities. 6) The artillery position constructed with the thick concrete walls was located at the foot of the mountain in back. It's plan was similar to the rectangular shape. It reserved six 280㎜ howizers and several explosive warehouses. 7) The reserve funds and arsenal funds were used for the constructions. And the items of expenses such as the establishments of the electric lights and communication networks, and the repairs of the explosive warehouses were mainly recoded in "Mildae-ilgi".