A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

The Dispute Resolution Method on The FIDIC Form of Construction Projects (건설 사업에서 FIDIC 규정의 분쟁해결 방법)

  • Lee Moo-Jong
    • Journal of Arbitration Studies
    • /
    • v.16 no.2
    • /
    • pp.239-264
    • /
    • 2006
  • Globalization of business activities and the market is making intern ational movement of capital much freer. Therefore the introduction of global standard is inevitable. Each and every country has had its own standard which restrain free exchange and cause misunderstanding and conflict between countries. A country or a company which is not capable of meeting the global standard can not be accepted in the global market. Consequently, it will eventually be left behind. It is right to say that countries and companies should accept the global standard and abide by it to survive in the competitive global market. The following preface which was introduced in the international conference co_organised by BAC, FTCTC and Tsinghua University in May, 2004 shows a timely movement for the globalization of construction business. *B A C, Beijing Arbitration Commission *FTCTC, The FIDIC-Tsinghua-CNAEC Training Center *CNAEC, China National Association of Engineering Consultants Introduction, As arbitration becomes more and more popular in the ways of alternative disputes resolution all over the world, the BAC is devoted to promoting international arbitration in China. As FIDIC contracts constitute an accepted point of reference for international construction contract, the BAC, characteristic of construction projects, is willing to facilitate the FIDIC contracts as the referred construction contracts in China. In order to carry out its purposes, the BAC, together with FTCTC is going to convene for discussion of dispute resolution and arbitration of international construction projects. FIDIC, construction contract management guide, explains arbitration as the ultimate dispute resolution method. The detail of FIDIC will be suggested in this essay.

  • PDF

Gap Analysis between Required Technology in the Global Market and Supply of Construction Re-education (글로벌 건설시장에서의 요구기술과 건설재교육 공급현황 간 차이분석을 통한 개선방안 도출)

  • Lee, Seul-Ki;Shin, Seoung-Woo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.9
    • /
    • pp.77-86
    • /
    • 2018
  • Demand for construction technology is expected to change due to changes in domestic and foreign construction markets and the fourth industrial revolution. In particular, demand for project management strategy and project management capability is even more increasing rather than existing production technology capability. However, the current re-education program for engineers and technicians in construction industry is not matching the need of improving capacity required to reflect the demand of construction technology from construction industry. Therefore, in this study, as a part of efforts in innovating the current global construction talent re-education system to cope with the change in the construction industry, we analyzed the difference between the demand of construction technology and the present condition of construction re-education program. In order to investigate the current status of re-education of construction, questionnaires were prepared to gather opinions from construction engineers who attended construction re-education program and also from industrial partners that are jointly doing business. This study can be an example to improve the construction re-education program as a system for substantially reinforcing the competence of engineers rather than those programs that are merely verifying and/or extending engineers' certification.

MODELLING OF THE RISKS FACED BY INDIAN CONSTRUCTION COMPANIES ASSESSING INTERNATIONAL OPPORTUNITIES

  • M.N. Devaya;N.K. Jha
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.140-149
    • /
    • 2007
  • Indian construction companies have only 0.05% market share in the 3-4 trillion dollar global construction business and only two Indian construction companies figure in the ENR "Top 225 Global Contractors 2006" list. Hence, while enormous scope for growth exists, international construction experience is limited. This study explores the risks as perceived by Indian companies venturing abroad since risks in international construction differ from home market risks. Literature survey identified a number of risk factors that were evaluated by the experts, highlighting fourteen important risk factors. Interpretive Structural Modelling (ISM) was used to develop a hierarchical model showing the relationships between the different risk factors, thus helping to focus on the key risks for effective risk management. The study shows that poor project management is a key risk forming the hub of the system, while political instability has maximum influence. The results of the study can be used by managers to visualise the risks in perspective and prioritise the mitigation effort.

  • PDF

Penetration of Korean EPC Companies into International Market for Nuclear Power Plant (플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안)

  • Cho, Chan-Hyoung;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

A QUANTITATIVE APPROACH FOR ASSESSING THE OVERSEAS BUSINESS CAPABILITIES OF CONSTRUCTION FIRMS

  • Hae Beom Yang;Woosik Jang;Kang-Wook Lee;Heedae Park;Seung Heon. Han;Hyun-woo You
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.308-314
    • /
    • 2013
  • Although global construction spending has experienced slow growth due to consecutive economic crises, global contractors have consistently attempted to expand their overseas market share, leading to more intense competition among contractors in the international construction market. In this market environment, owners, clients and financial institutions require reasonable and systematic criteria to effectively assess the business capabilities of international construction firms. However, the existing evaluation methods for construction firms rarely consider overseas-focused business capabilities. To address this problem, this study proposes a quantitative approach to assessing the overseas business capabilities of international construction firms. The limitations of existing approaches are reviewed, and the capabilities required to perform overseas businesses are analyzed through expert interviews. Finally, 18 evaluation indices are suggested in four categories: technology resources, project management, experience and performance, and sustainability. The relative weight of each index is determined according to the Analytical Hierarchy Process (AHP) method, and a preliminary investigation of 11 Korean construction firms is conducted. The proposed method is expected that it will provide the rational criteria for international owners, clients, and financial institutions for decision-making and for evaluating international contractors.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

Improvement of Global Construction Engineer Training Program : An Importance-Satisfaction Analysis (글로벌 건설 엔지니어링 고급인력 양성사업의 교육프로그램 개선방안)

  • Park, Hyeon;Park, In-Seok;Cha, Yongwoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.31-39
    • /
    • 2016
  • This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.