• Title/Summary/Keyword: Geothermal power generation

Search Result 53, Processing Time 0.031 seconds

A Review on World Geothermal Assessment (전세계 지열부존량 평가에 대한 개관)

  • Song, Yoon-Ho;Lee, Young-Min;Lee, Tae-Jong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.613-616
    • /
    • 2008
  • Assessment of geothermal resources like other earth resources is a starting point for decision makers or stakeholders to set up basic plan on its development and R&D policies. In this context, there have been various works on world geothermal assessment, to report different estimates from each other. In this paper, we first introduce the definition of geothermal potential mainly adopted from the article by Muffler and Cataldi (1978) and then summarize the estimates made so far referring the work by Bertani (2003). An updated estimates by Stefansson (2005) are also reviewed in terms of identified resources separately for high-temperature resources for power generation and low-temperature ones for direct-use. Recent estimate of US geothermal resources by MIT (2006) using a volumetric method with extensively accumulated data base is discussed. Finally, we introduce the first geothermal assessment in Korea recently made and discuss its importance.

  • PDF

Economic Evaluation of Building Micro-Grid Including Geothermal Energy System in Hospital Buildings (지열시스템이 포함된 빌딩마이크로그리드 시스템의 에너지성능평가 및 경제성분석)

  • Kim, Byoung-Soo;Hong, Won-Pyo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.273-277
    • /
    • 2009
  • This paper presents a basic energy performance data of micro gas turbine, Renewable Energy(BIPV and Solar Collector System, geothermal system) and a hybrid energy system(geothermal system and microturbine) installed in Hospital Building. The efficiency of solar collector and BIPV system was 30%, 10% individually, and lower than micro gas turbines. Micro gas turbines are small gas turbines that bum gaseous and liquid fuels to produce a high-energy exhaust gas and to generate the electrical power. Recently, the size range for micro gas turbines is form 30 to 500kW and power-only generation or in combined heat and power(CHP) systems. Finally, in energy performance aspect, Micro gas turbine system and hybrid energy system were high-efficiency system in hospital building. Hybrid energy system also give us a powerful alternative energy system economically.

  • PDF

Review on the induced seismic event for artificial reservoir (인공저류층 생성을 위한 유도진동에 관한 사전연구)

  • Jeon, Jong-Ug;Myoung, Woo-Ho;Kim, Young-Deug
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.8 no.2
    • /
    • pp.55-60
    • /
    • 2012
  • In many cases, geothemal wells will not be opened up a geothermal reservoir under such conditions that an extraction of geothermal energy is economically viable without any further measures. Geothermal wells often have to be stimulated, in order to increase productivity. For the non-volcanic area, such as Korea, the hydraulic stimulation is necessary to complete geothermal power plant. The analysis of induced seismic event showed that the thermal resource might have a much wider extent and a much higher generation potential than previously assumed. In order to record compressional and shear waves emitted during fracture stimulation, three-component geophones are placed in a seismometer. The recorded data from one seismometer is the convolution of the source magnitude, the transmission media, and the sensitivity of the instrument.

A Study on the Relationship Between Photovoltaic Module Surface Temperature and Photovoltaic Power Using Real Experiment (실물 실험을 통한 태양광 모듈의 표면온도와 태양광 발전량과의 관계에 대한 연구)

  • Cho, Sung-Woo
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.14 no.3
    • /
    • pp.8-14
    • /
    • 2018
  • PV module power is calculated on PV module surface temperature adjustment by irradiation on the summer and autumn in NOCT(Nominal Operating Cell Temperature) conditions. The summer and autumn periods were selected because of large variation in outdoor air temperature and irradiation. This study was performed to understand relationship between PV module surface temperature and photovoltaic power using field measurement. As a results, it was determined that the amount of irradiation was proportional to the amount of photovoltaic power in the field measurement. However, it was also identified that the PV power generation decreased by increased PV module surface temperatures due to irradiation.

ORC System Performance Analysis upon R-245fa and Novec 649 (R-245fa 및 NOVEC 649 작동유체에 따른 ORC 시스템 성능 변화)

  • Chang, Hong-Soon;Han, Young-Sub;Song, Yeong-Kil;Kim, Sung-Hyun
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.12 no.3
    • /
    • pp.17-23
    • /
    • 2016
  • A test unit for Organic Rankine Cycle (ORC) power generation system was developed and experimentally reviewed the performance of the ORC system. Two different organic fluids (R-245fa & Novec 649) were tested as working fluids for the system. System behavior was measured and analyzed along with the variables, such as temperature, pressure, rpm and shaft power. It is one of the findings that Novec 649 fluid is to be less pressurized than R-245fa in order to up to the heat source (boiler) capacity, that limits the experiment as high as 2 kW in shaft power.

Geothermal Power Generation using Enhanced or Engineered Geothermal System(EGS) (공학적인 지열시스템(EGS)을 이용한 지열발전 기술)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.3-32
    • /
    • 2008
  • The potential deep geothermal resources span a wide range of heat sources from the earth, including not only the more easily developed, currently economic hydrothermal resources; but also the earth's deeper, stored thermal energy, which is present anywhere. At shallow depths of 3,000~10,000m, the coincidence of substantial amounts heat in hot rock, fluids that heat up while flowing through the rock and permeability of connected fractures can result in natural hot water reservoirs. Although conventional hydrothermal resources which contain sufficient fluids at high temperatures and geo-pressures are used effectively for both electric and nonelectric applications in the world, they are somewhat limited in their location and ultimate potential for supplying electricity. A large portion of the world's geothermal resource base consists of hot dry rock(HDR) with limited permeability and porosity, an inadquate recharge of fluids and/or insufficient water for heat transport. An alternative known as engineered or enhanced geothermal systems(EGS), to dependence on naturally occurring hydrothermal reservoirs involves human intervention to engineer hydrothermal reservoirs in hot rocks for commercial use. Therefore EGS resources are with enormous potential for primary energy recovery using an engineered heat mining technology, which is designed to extract and utilize the earth's stored inexthermal energy. Because EGS resources have a large potential for the long term, United States focused his effort to provide 100GW of 24-hour-a-day base load electric-generating capacity by 2050.

  • PDF

Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea (MW급 EGS 지열발전 상용화 기술개발사업의 추진 배경 및 계획)

  • Yoon, Woon-Sang;Song, Yoon-Ho;Lee, Tae-Jong;Kim, Kwang-Yeom;Min, Ki-Bok;Cho, Yong-Hee;Jeon, Jong-Ug
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2011
  • Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.

Review of the 21th Energy (21세기의 에너지에 관한 고찰)

  • Lee, Hyun-Hwa
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.5 s.188
    • /
    • pp.20-24
    • /
    • 2006
  • The energy of 97% consumed by our country depends on it's import from foreign market. This article covers hydrogen, fuel-cell, coal liquefaction gasification energy, and solar, wind, photovoltaic, hydro power, ocean, waste, geothermal, bio energy that is renewable energy, and so on, which are new-generation energy sources, increasing the concern on new & renewable source of enenrgy in future.

  • PDF

Water Allocation Policy and its Implications in the Waikato Region

  • Brown, Edmund
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.11-17
    • /
    • 2012
  • The Waikato River is New Zealand's longest River, though relatively small on international scales. It drains the central North Island and has New Zealand's largest lake (Lake Taupo) at its headwaters. The upper reaches have sustained flows fed by large aquifers which are recharged by rainfall events providing relatively constant river flows, whereas the lower reaches respond more directly to rainfall events having more peaky flows after rainfall and extreme low flows during dry periods. Consumptive allocation from the river is relatively low with only about 3% of the mean annual flow being allocated. However, more than seven times the river's flow is allocated for non-consumptive purposes before discharging to the Tasman Sea. The majority of this non-consumptive allocation is for hydro power generation and as cooling water at both thermal and geothermal power stations which produce up to 25% of New Zealand's electricity. The upper half of the river has been heavily modified with the construction of eight dams for power generation. This has resulted in a succession of cascading dams replacing the previously uncontrolled river. The Waikato River also provides drinking water for Auckland City (NZ's largest city) and Hamilton City (NZ's 4th largest city). In recent years there has also been considerable growth in water requirements for pasture irrigation to support the intensification of dairy farming in the catchment. Operators of the power stations are concerned that any further consumptive allocation will further reduce their ability to generate electricity. The Waikato Regional Council, who is charged with managing the river and allocation of water, has recently set new rules for managing the conflicting allocation demands on the Waikato River. This has resulted in an end to further allocation of water where it results in a loss of water for electricity generation from renewable resources (fresh water and geothermal water). The exception to this is the prioritisation of water for municipal supplies ahead of other consumptive uses such as industries and irrigators.

  • PDF

Enhanced Geothermal System Case Study: The Soultz Project (EGS 지열발전 연구사례: The Soultz Project)

  • Lee, Tae Jong;Song, Yoonho
    • Tunnel and Underground Space
    • /
    • v.23 no.6
    • /
    • pp.561-571
    • /
    • 2013
  • Various experiences on enhanced geothermal system (EGS) has been accumulated from the Soultz project through various scientific experiments and research activities for more than 20 years since it started in the year of 1984 until the 1.5 MW Organic Rankine Cycle (ORC) binary power plant has been built up in Soultz-sous-$\hat{e}$ area, France. They have been applied to Cooper basin in Australia, Landau and Insheim in Germany and so forth. This report summaries the experiences from Soultz in the aspect of artificial reservoir creation, expecting to be helpful for reducing any trial and errors or unnecessary expenses in ongoing Korean EGS project in Pohang area, where the geological features are similar to Soultz area.