• 제목/요약/키워드: Geotechnical surveys

검색결과 67건 처리시간 0.023초

물리탐사를 이용한 대전차 지뢰 탐지 (Antitank Mine Detection with Geophysical Prospecting)

  • 조성준;김정호;손정술;방은석;김종욱
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2007년도 공동학술대회 논문집
    • /
    • pp.219-224
    • /
    • 2007
  • We conducted geophysical surveys to detect antitank mine at Namji-eup, Gyeongsangnam-do which had been installed during Korean war. The surveys consisted of 2 stages, at the first stage we divided the survey area into 7 block and carried out magnetic gradient survey and GEM-3 EM survey sequentially for each block. Hence we verified anomaly areas using an excavator and a metal detector. Most of anomalies were found to be garbages such as trash cans, metallic wastes, and so on. And also, the concrete pipe was found at depth of 1 m, which had not referred in any report of that area. At the second stage, after trenching the covered soil down to 75 cm the same surveys were conducted. We could not find the strong signal to be inferred from a antitank mine, but we pointed out some anomalies to need careful handling because demining is very dangerous work even though there is few possibility that is mine.

  • PDF

Feasibility test on EDZ detection by using borehole radar survey

  • 조성준;김정호;손정술;김창렬;성낙훈
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2006년도 공동학술대회 논문집
    • /
    • pp.239-244
    • /
    • 2006
  • 현재 건설중인 한국원자력 연구소 내의 지하 처분 연구시설에서 발파에 의한 터널 굴착 중 발생하는 손상대를 모니터링 하기 위해 시추공 레이다 반사법 탐사를 수행하였다. 60m 길이의 진입 터널이 완성되고 끝단에 쉘터가 만들어진 뒤 쉘터로부터 길이 35 m의 수평 시추공을 뚫어 터널 굴착에 따른 손상대 모니터링을 위한 관측공으로 사용하였다. 시추공은 굴착터널로부터 5.5 m 떨어져 있으며, $2{\sim}4$일 간격으로 5회 실험을 실시하였다. 터널의 굴착에 따른 터널면에서의 반사가 가장 강력한 반사면으로 작용하였으며, 서로 다른 날짜의 자료의 비교를 통해 터널 굴착면에 인접한 반사면의 변화를 감지 하였으며 이는 균열대의 생성과 암반 강도의 저하에 의한 것으로 여겨 졌으며 손상대로 평가되었다.

  • PDF

고심도 지반환경 조사 - 비파괴 물리탐사의 적용 (2) (GEOTECHNICAL ENVIRONMENT SURVEY (2))

  • 손호웅;이승희;김형수
    • 지구물리
    • /
    • 제6권4호
    • /
    • pp.261-268
    • /
    • 2003
  • 지하의 수없이 매설된 지하매설물의 효율적인 관리는 도시의 원활한 운영을 위한 중요과제가 되어가고 있다 지하 매설물의 위치 및 깊이를 조사하기 위한 지구물리탐사방법으로서 GPR탐사 및 유도전류탐사 등이 주로 적용되고 있으나 가탐심도가 매우 낮으며 지하매질이 불균질 하거나 점토 염분 자갈 등의 지반 및 전자기적 잡음이 심한 곳에서는 조사가 안 되는 경우가 많다 본 연구에서는 지반조건 및 고심도 때문에 지하매설물을 탐지할 수 없는 지역에서 지하매설물 탐지를 효율적으로 수행할 수 있는 비파괴적인 전자탐사기법으로서 고주파수대역 전자탐사법을 적용하였으며 광역상수관이 천부 및 심부에 다수 매설되어 있으나 열악한 지반환경 때문에 물리탐사방법으로 지하매설물의 탐지가 여의치 않은 지역에 고주파수대역 전자탐사법의 효용성 확인을 위해 적용하였다 연구결과 기존의 지구물리탐사방법으로는 위치확인을 할 수 없었던 지하매설관에 대해서 고주파수대역 전자탐사법의 적용은 매우 성공적이었으며 비저항값을 함께 유추할 수 있었다 따라서 본 고주파수대역 전자탐사법은 고심도 지하매설물의 정밀 지구물리탐사에 효과적으로 적용할 수 있으며 문화재유물 등의 조사에도 적용할 수 있을 것으로 판단된다

  • PDF

Resistivity and Calibration Error Estimations for Small-Loop Electromagnetic Method

  • Sasaki, Yutaka;Son, Jeong-Sul;Kim, Chang-Ryol;Kim, Jung-Ho
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2007년도 공동학술대회 논문집
    • /
    • pp.167-172
    • /
    • 2007
  • The frequency-domain small-loop electromagnetic (EM) instruments are increasingly used for shallow environmental and geotechnical surveys because of their portability and speed. However, it is well known that the data quality is generally so poor that quantitative interpretation of the data is not justified in many cases. We present an inversion method that allows the correction for the calibration errors and also constructs multidimensional resistivity models. The key point in this method is that the data are collected at least at two different heights. The forward modeling used in the inversion is based on an efficient 3-D finite-difference method, and its solution was checked against 2-D finite-element solution. The synthetic and real data examples demonstrate that the joint inversion recovers reliable resistivity models from multi-frequency data severely contaminated by the calibration errors.

  • PDF

시험도로 건설과 계측시스템 구축 (A Review of Instrumentation System and Construction of Korea Highway Test Road)

  • 최준성;김도형;김성환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF

인홀탄성파시험의 타당성 연구 (A Pilot Study of In-hole Seismic Method)

  • Mok, Young-Jin;Kim, Jung-Han;Kang, Byung-Soo
    • 한국지반공학회논문집
    • /
    • 제19권3호
    • /
    • pp.23-31
    • /
    • 2003
  • 지난 반세기 동안 검측공 탄성파시험은 시험 장비 및 그 배치에 따라 크로스홀, 다운홀, 서스펜션로깅과 같은 시험으로 발전하였다. 이런 현장시험은 장비와 시험기법이 꾸준히 개선되어 지반 및 지진공학 분야의 부지특성규명에 매우 값진 기술이 되었다. 그러나 이 기술은, 공학적 의의와 중요성에도 불구하고, 표준관입 시험처럼 실무에 보편적으로 적용되지 못하고 있다. 그 이유는 장비가 복잡 정교할 뿐만 아니라, 사용하기 어렵고 비싸기 때문이다. 이 연구에서는 경제적이고 실용적인 지반의 동적물성치 계측 기술 개발을 목표로 하여 인홀 시험법을 연구하였다. 이 연구에서 개발한 인홀장비 시작품은 NX 크기의 검측공에 사용하고 맨손으로 다룰 정도로 작고 가볍다. 이 장비의 발진장치는 여러 현장에서 크로스홀시험을 통하여 그 성능을 검증하였고 꾸준히 개선되고 있다. 세 현장에서 인홀시험을 수행하고 그 결과를 크로스홀시험 결과와 비교하여 타당성을 검증하였다.

Application of resistivity monitoring to examine the grouting effect

  • Farooq, Muhammad;Park, Sam-Gyu;Kim, Jung-Ho;Song, Young-Soo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2006년도 공동학술대회 논문집
    • /
    • pp.79-82
    • /
    • 2006
  • This paper presents to examine the ability of an electrical resistivity method to monitor the grouting effect at subsidence area. To monitor the changes in ground resistivity before and during the grout, series of electrical resistivity monitoring surveys have been conducted. Data has acquired in the form of grid making nine lines parallel to road and four lines traverse the road. Two kinds of electrode arrays modify pole-pole and dipole-dipole arrays were used during resistivity data acquisition. In this paper, the results show that electrical prospecting is an effective method to detect low resistivity imaging zone by grout during the ground reinforcement.

  • PDF

하상토 부존량 조사를 위한 물리탐사 사례 연구 (Case Study of Geophysical Surveys for Investigating the Volume of Bed Sediments)

  • 윤종열;김진만;최봉혁
    • 지질공학
    • /
    • 제17권4호
    • /
    • pp.615-621
    • /
    • 2007
  • 하상토의 부존량을 경제적으로 파악하는데 효과적일 것으로 예상되는 굴절법탄성파탐사를 상이한 토질의 2개소에 적용하였다. 대상지역은 용인시 월촌교 인근 제방 및 예천군 담암제이며 총 10측선의 굴절법탄성파탐사가 수행되었다. 아울러 역산된 탄성파단면상에서 지층을 구분하기 위해 2개의 시추조사가 병행되었다. 취득된 탐사자료를 역산하여 지층을 구분하고 고도 측량자료와 각 지점별 토사층 심도를 내삽한 결과 각각 $24,000m^3$$56,000m^3$로 하상토의 부존량 추정이 가능하였다.

하천제방의 안전성 평가를 위한 전기비저항탐사 (Assessment of Levee Safety Using Electrical Surveys)

  • 윤종렬;김진만;최봉혁
    • 지구물리
    • /
    • 제8권2호
    • /
    • pp.53-61
    • /
    • 2005
  • 합천군 덕인2제를 대상으로 시트파일과 그라우팅 차수벽의 차수효과를 비교 판정하고 제방하부에서 발생하는 파이핑 현상을 감지하기 위하여 갈수기와 우수기에 걸쳐 2차원 및 3차원 전기비저항탐사를 실시하였다. 자료의 해석결과 2차원이나 3차원탐사 모두 시트 파일과 일반 그라우팅 차수벽의 경계부나 육안으로 관찰된 파이핑 발생지점을 비교적 정확하게 탐지하였다. 그러나, 보다 양호한 자료를 얻기 위해서는 전극의 접지상태를 향상시키고 가탐심도와 분해능을 고려한 적절한 탐사파라미터의 설정이 필수적이라고 할 수 있다.

  • PDF

암반정보관리시스템(RIMS)의 개발 및 DB 현황 (Development of RIMS and Present Conditions of its DB)

  • 이성민;김영구;박부성
    • 터널과지하공간
    • /
    • 제9권2호
    • /
    • pp.131-140
    • /
    • 1999
  • 건설공사를 위한 수많은 지반조사가 수행되었음에도 불구하고 대부분의 조사자료가 관리체계의 부재로 인하여 해당 건설 활동에 한해서만 제한적으로 사용되었을 뿐, 미래의 건설활동을 위한 자료로는 거의 활용되지 않았다. 따라서 본 연구에서는 암석 및 암반 조사 자료를 중심으로 효과적이고 체계적인 관리를 위한 DB 관리 시스템인 암반정보관리시스템(Rockmass Information Management System, RIMS)의 개발에 초점을 두었다. RIMS는 입 력, 수정, 검색과 같은 기본적인 기능 뿐만 아니라 데이터의 기본적인 분석과 자료의 결과를 확인하기 위한 분석모듈(동적 데이터 조회, 조회 조건 생성 및 연산, Plotting 및 자료추출)을 갖고 있다. 더욱이 RIMS는 수평위치를 나타내는 x, y 좌표와 수직위치를 나타내는 심도가 어울려서 층서, 실내시험자료 및 현장시험자료를 구축하는 3차원적 자료축적구조를 갖고 있다. 또한, 본 연구에서는 RIMS에 입력된 자료들을 지역별, 암종별 등으로 구분하여 DB 현황분석을 실시하였다.

  • PDF