Tunnelling in water bearing soils influences the ground water regime. It has been indicated in the literature that the existence of ground water above a tunnel influences tunnel stability and the settlement profile. Only limited research, however, has been done on ground water movements around tunnels and their influence on tunnel performance. Time dependent soil behaviour can be caused by the changes of pore water pressure and/or the viscous properties of soil(creep) under the stress change resulting from the advance of the tunnel face. De Moor(1989) demonstrated that the time dependent deformations due to tunnelling are mainly the results of pore pressure dissipation and should be interpreted in terms of effective stress changes. Drainage into tunnels is governed by the permeability of the soil, the length of the drainage path and the hydraulic boundary conditions. The potential effect of lime dependent settlement in a shallow tunnel is likely to occur rapidly due to the short drainage path and possibly high coefficient of consolidation. Existing 2D modelling methods are not applicable to these tunnelling problems, as it is difficult to define empirical parameters. In this paper the time-based 2D modelling method is adopted to account for the three dimensional effect and time dependent behaviour during tunnel construction. The effect of coupling between the unloading procedure and consolidation during excavation is profoundly investigated with the method. It is pointed out that realistic modelling can be achieved by defining a proper permeability at the excavation boundary and prescribing appropriate time for excavation Some guidelines for the numerical modelling of drained and undrained excavation has been suggested using characteristic time factor. It is highlighted that certain range of the factor shows combined effect between the unloading procedure due to excavation and consolidation during construction.
점토-시멘트 혼합토의 물리적 특성인 함수비, 비중, 단위중량과 간극비 등은 혼합토의 강도, 압축성, 압밀거동 예측 등에 적용되는 주요한 인자이다. 기존에는 혼합토의 물리적 특성을 복잡한 실내시험 및 시공 후 확인조사를 통해 이루어 졌다. 본 연구는 점토 함수비 90~170%, 시멘트 함유율 5~25%와 재령기간은 3~90일 조건으로 실내시험을 수행하였으며, 양생 후 혼합토 함수비, 비중, 단위중량과 간극비 등에 대한 변화를 분석하였다. 시험결과를 이용하여 원지반 점토 함수비, 시멘트 함유율과 재령기간 등의 역학적 관계를 바탕으로 혼합토의 함수비, 비중과 단위중량에 관한 물성 예측식을 제안하였다. 혼합토의 물성 예측식을 지반공학 분야에서 일반적으로 사용하는 간극비 산출식에 대입하여 혼합토의 간극비 예측식을 도출하였으며, 방콕 점토를 대상으로 간극비에 대한 실험결과와 본 연구에서 제안한 예측식을 검증하였다.
현장 관입시험은 각종 해석과 설계를 위하여 지반공학 분야에서 널리 사용되어 오고 있다. 이중 표준관입시험과 동적콘관입시험이 동적 사운딩에 가장 대표적인 시험들이다. 동적콘관입시험은 원래 노상토의 특성 평가를 위하여 개발되었다. 동적콘관입시험의 가장 큰 장점은 간편하고 경제적이며, 상부에 견고한 층이 분포하는 연약층과 같은 비선형적인 지역의 지반조건을 빠르게 평가할 수 있는 데 있다. 그러나 시험의 표준화가 되지 않음에 따라 광범위한 사용이 제한되고 있는 실정이다. 이에 본 연구에서는 대형콘관입시험장비를 이용하여 동적콘관입시험과 표준관입시험값과의 상관성을 평가하였다. 동적콘관입시험과 표준관입시험간의 회귀분석과 신뢰성 해석을 실시하였으며 그 결과 변환계수는 토질특성에 따라 1.12~1.31 사이에 분포하는 것으로 나타났다.
강원지역은 한국의 북동부에 위치하고 있으며 산지가 90%에 달해 한국에서 가장 추운 지역이다. 그에 따라 겨울철 터널 피해가 지속적으로 발생하고 있으나 아직 터널 라이닝 배면에서 발생하는 동상에 대한 연구는 매우 부족하다. 본 연구에서는 강원지역의 도로터널에서 발생하는 동상깊이 분석을 위한 수치적 연구를 수행하였다. 강원지역 도로터널 현황과 기후자료를 분석하고 이를 토대로 터널 표준 형상과 지반 특성을 가정하였으며, 기온 변화와 지반특성 변화에 따른 터널 배면지반의 최대 동상깊이를 산정하였다. 해석결과 모래보다 변성암 및 퇴적암의 동결민감성이 더 크며, 라이닝 배면의 초기 지중온도가 낮을수록 동상깊이가 깊어져 동결에 대한 피해도 커지는 것으로 나타났다. 또한 라이닝 두께 및 지반의 비열, 열전도율과 같은 특성도 동결깊이 변화에 큰 영향을 미치는 것으로 나타났다.
본 논문에서는 지열활용 지반구조물 적용시 주변 지반에 부과되는 온도변화 사이클이 흙의 물리적 역학적 특성에 미치는 영향에 대한 내용을 다루었다. 이를 위해 모래와 화강풍화토를 대상으로 다양한 온도변화 조건을 구현하고 이에 따른 흙의 입자구조 및 열전도특성 변화 경향을 고찰하였다. 아울러 다양한 온도변화에 노출된 시료를 이용하여 시편을 조성한 후 삼축압축시험을 수행하고 그 결과를 토대로 온도변화가 시편의 응력-변형률-강도 톡성에 미치는 영향을 검토하였다. 그 결과 온도변화 사이클은 흙의 입자구조 및 열전도율에 큰 영향을 미치지 않는 것으로 검토되었다. 또한 임의 반복 사이클 $N_{hc}$에 있어 가열시간이 $H_d=2{\sim}8hrs$ 변화함에 따라 최대 축차응력이 15%이상 감소하는 것으로 나타나 가열-냉각 반복작용에 의한 흙의 강도특성 변화는 흙의 종류에 따라 달라 질수 있는 것으로 검토되었다.
It is important to pay careful attention to construction backfill for the structural integrity of concrete box culvert. The stability of the surrounding soil is important to the structural performance of most culverts. Good compaction by the dynamic compaction roller with big capacity is as effective as good backfill materials to increase the structural integrity of culvert. However structural distress of the culvert could be occur due to the excessive earth pressure by dynamic compaction load. In this study, 16 box culverts were constructed with various compaction materials and construction methods. Three types of on-site soils such as subbase, subgrade and roadbed materials were used as backfill materials in the test program. Compaction methods were adapted based on the site conditions. In most cases, dynamic compaction rollers with 10 to 16 ton weights were used and vibration speed were applied from 2400 to 2500 rpm for the great compaction energy. Some backfill compactions with good quality soils were carried out to examine the effect of EPS(Expanded Polystyrene) panels with changes of compaction thickness. This paper presents the main results of the research conducted to access the engineering performance of the backfill materials. The characteristics of earth pressures are discussed. It is observed that subgrade and roadbed materials are needed more careful compaction than subbase materials. It is shown that EPS panels are effective to mitigate dynamic lateral earth pressure on the culverts. It is also obtained that the dynamic pressure depends on the soil properties. In addition, the coefficient of dynamic earth pressure (K$\sub$dyn/=ΔP$\sub$H/ ΔP$\sub$V/) during compaction is discussed.
In Namyang Bay of western Korea, macrotidal-flat deposits are divisible into three late Quaternary units: Unit M1 of upper marine mud, Unit T1 of middle siderite-bearing terrestrial clay, and Unit M2 of lower marine mud. Unit M1 represents typical Holocene intertidal mudflat deposits, showing a coarsening-upward textural trend. It probably resulted from the continual retrogradation of tidal flat during the mid-to-late Holocene sea-level rise. Reddish brown-color Unit T1 consists of homogeneous clay with abundant freshwater siderite grains and plant remains. Unit T1 is clearly separated from the overlying Unit M1 by a sharp lithologic boundary. Radiocarbon age, siderite grains and lithologic features indicate that Unit T1 is originated from freshwater bog or swamp deposition infilling the localized topographic lows during the early Holocene age. Overlain unconformably by early Holocene swamp clay, Unit M2 is orange to yellow in color and mottled, suggesting significant degree of weathering during the sea-level lowstand. Such subaerial oxidation is confirmed in the vertical profiles of geotechnical properties, clay mineral assemblages and magnetic susceptibility. Unit M2 appears to be correlated with the upper part of the late Pleistocene tidal deposits developed along the western Korean coast. The sedimentary succession of the Namyang-Bay tidal-flat deposit provides stratigraphic information for the Holocene-late Pleistocene unconformity and also permits an assessment of the preservation potential of the late Pleistocene marginal marine deposit along the western coast of Korea.
화강편마암을 지반으로 하는 지역의 Fill Dam 코어기초에 3-12m 폭의 단층대와 40여m 폭의 단층파쇄대가 신선한 암반사이에 분포하며, 이들 각각의 암반의 탄성특성은 현저한 차이를 보인다. 평판재하시험 및 시추공내 변형시험 등의 현장 원위치 시험결가 신선한 암반의 변형계수는 $42,000~168,000kg/\textrm{cm}^2$의 범위를 보이나 단층대의 변형계수는 $963~2,204kg/\textrm{cm}^2$, 파쇄대에서는 $1,238~2,098kg/\textrm{cm}^2$의 범위를 나타낸다. 이와 같이 큰 차이의 변형계수값을 갖는 단층대 및 단층파쇄대와 신선한 암반 사이에는 댐 성토 후 부등침하가 예상된다. 따라서 이에 대한 보강을 위하여 증분식 유한요소 프로그램인 FEADAM 84를 이용한 지반과 보강에 따른 변위 등을 검토하였다. 이때 구성된 유한요소망은 지표조사 및 시추조사에서 확인된 불연속면이 기하학적 분포특성을 고려하였다. 유한요소 해석을 통하여 계산된 단층대와 신선한 암반 사이의 보강 전 부등침하량은 약 6cm에 달하며, 콘크리트 치환 보강 후에는 0.5cm 이내로 나타났다.
In this study, a series of numerical analyses has been performed in order to evaluate the performance of a full-scale closed-loop vertical ground heat exchanger constructed in Wonju. The circulation pipe HDPE, borehole and surrounding ground were modeled using FLUENT, a finite-volume method (FVM) program, for analyzing the heat transfer process of the system. Two user-defined functions (UDFs) accounting for the difference in the temperatures of the circulating inflow and outflow water and the change of the surrounding ground temperature with depth were adopted in the FLUENT model. The thermal properties of materials estimated in laboratory were used in the numerical analyses to compare the thermal efficiency of the cement grout with that of the bentonite grout used in the construction. The results of the simulation provide a verification of the in situ thermal response test data. The numerical model with the ground thermal conductivity of 4W/mK yielded the simulation result closer to the in-situ thermal response test than with the ground thermal conductivity of 3W/mK. From the results of the numerical analyses, the effective thermal conductivities of the cement and bentonite grouts were obtained to be 3.32W/mK and 2.99 W/mK, respectively.
Several remedial works were attempted to stabilize the collapsed area of the inlet slopes of diversion tunnel, but prevention of any further movement was being only carried out at beginning stage by filling the area with aggregates and rock debris, after several cracks had been initiated and developed around the area. The extra specialty developed folding zone is consisted with highly weathered Greywacke and Black shale. The suggested solution is to improve the properties of the rock mass of failed area by choosing the optimum level of reinforcement through the increment of slope rock support design so as to control the movement of slopes during the re-excavation. The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia. The power station will consist of a 210m height Concrete Faced Rockfill Dam. During the construction of the dam and the power facilities the Balui River has to be diverted of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four defined Rock Mass Type (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each "global" slope without any rock support and shotcrete system. In the second stage, it is calculated for each "local" slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.