• Title/Summary/Keyword: Generator Scheduling

Search Result 82, Processing Time 0.032 seconds

PICNET Network Configurator for Distributed Control System

  • Kim, Dong-Sung;Lee, Jae-Young;Jun, Tae-Soo;Moon, Hong-Ju;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.100-103
    • /
    • 1999
  • In this paper, a method for the efficient implementation of the PICNET network configurator for a distributed control system(DCS) is proposed. The network configurator is composed of the time parameter estimator and the period scheduler, the file generator. The main role of network configurator estimates time parameter, the pre-run time scheduling of the user input and make the period transmission table for operating the PICNET based distributed control system.

  • PDF

Development of Time-Expanded Network using Hold-over Arcs (지체호를 사용하는 시간 전개형 네트워크의 개발)

  • Lee, Dal-Sang;Kim, Man-Sik;Lee, Young-Hae
    • IE interfaces
    • /
    • v.4 no.2
    • /
    • pp.25-34
    • /
    • 1991
  • The problem of scheduling the passage things with low transit priority to maximize the amonnt that can be sent during given time periods without interfering with the fixed schedule for passage things with high transit priority in a track, is treated in this paper. The problem is transformed into the Time Expanded Network without traverse time through the Ford and Fulkerson Model and the Enumeration Algorithm is developed for solutions using TENET GENerator(TENETGEN). Finally, the proposed algorithm is compared with Dinic's maximal-flow algorithm and examined for the availability of the procedures on the personal computer.

  • PDF

A study of optimal scheduling for generator maintenance considering economics (경제성을 고려한 발전소 예방정비 계획 최적화 방안 연구)

  • Jang, Ji-Won;Yoon, Yong-Tae
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.459-460
    • /
    • 2015
  • 현재의 예방정비계획 운영 방법은 KPX에서 발전 사업자들로부터 희망하는 자신들의 발전기 예방정비계획 일정을 받아서 공급예비력 기준을 만족하면 승인을 해주는 방법으로 진행되고 있다. 이는 경제적인 부분을 예방정비계획 수립에 반영하지 못하고 계통의 신뢰도 측면만을 판단하는 것으로 생각할 수 있다. 따라서 발전비용을 최소화하는 예방정비계획 최적화 모델을 적용하여 예방정비계획 수립 시 경제성을 반영하려 한다. 이를 통해 연발전비용을 낮추면서 연평균 SMP 또한 낮춤으로서 한전과 발전사업자 모두에게 이익을 가져다 줄 수 있는 것이다. 따라서 본 연구에서는 비용 최소화를 목적함수로 하는 tool을 적용한 예방정비계획 최적 값과 기존의 예방정비계획을 공급예비율, 계통한계가격(System Marginal Price, SMP), 발전비용 세 가지로 나눠 비교하고 신뢰도와 경제성을 고려한 최적 예방정비계획을 수립하였다.

  • PDF

A Study on the Speed Control of Medium Diesel Engine using a Fuzzy-PI Controller (퍼지 PI제어기를 이용한 중속 디젤 기관의 속도제어에 관한 연구)

  • 김영일;천행춘;서인호;유영호
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.4
    • /
    • pp.435-440
    • /
    • 2000
  • The speed control system of diesel engine is considerably nonlinear. Therefore, a countermeasure such as gain scheduling used to be incorporated to compensate this nonlinearity. On the other hand, it is said that fuzzy control is very robust against nonlinearity. But it is difficult to get a satisfactory response with only fuzzy control in real system. In this paper authors design a fuzzy-PI controller for the speed control of Medium diesel engine and carry out experiments with dedicate system implemented by Intel 80916KC to real diesel engine, Deawoo MAN 6Cyl., 1800rpm driving 3$\psi$220V, 150KW generator. We confirm the effectiveness of proposed control system.

  • PDF

Method of Generator Maintenance Scheduling Considering Transmission System (송전계통을 고려한 발전기 예방정비계획 방법론에 관한 연구)

  • Han, Seok-Man;Shin, Young-Kyun;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.104-106
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. In this paper, we divide maintenance schedule problem into master-problem and sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem.

  • PDF

A Study of Demand Response Resource in Ancillary Service (계통보조서비스에서 부하자원의 활용방안에 대한 고찰)

  • Kim S.C.;Yoo S.Y.;Kim H.J.;Kim H.J.;Park J.B.;Sin J.R.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.663-665
    • /
    • 2004
  • There are some demand response program which is Direct Load Control and so on in Korea. These are used to manage lack of power stability or shift peak time for shading load. It is very important not only using stability power system but controling and scheduling power system on the whole. Interruptible loads are essential resources to solve lack of energy and limit of constructing generator On recently days, Demand Response Program's reliability is recognized as ancillary or reserve service in many country. This paper presents a necessity to apply demand resource to our ancillary program. For this reason, it is introduce overseas ancillary program using load resource.

  • PDF

Development of Generation Planning System for Power Market Operation (전력시장 운영 발전계획시스템 개발)

  • Choi, Jae-Seok;Yoon, Yong-Tae;Cha, Jun-Min;Park, Jun-Hyeong;Ku, Bon-Hui;Oh, Tae-Gon;Lee, Sang-Sung;Baek, Ung-Ki;Choi, Hyeon-Il;Park, Sung-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.364-365
    • /
    • 2011
  • This study develops a new system for generation system simulation and operational planning (namely, KPWR-X) including GMS(Generator Maintenance Scheduling), UC(Unit Commitment), and LF(Load Forecasting) for new power system environment in recent. The KPWR-X provides operator and planner to help the generation system more safely and economically. GUI developed in this study makes operator feel in convenient to control whole power system. In future, it is expected that generation company, ISO, and fuel procurement, etc. may use an instructional tool developer's suggestion for application. It will be also applicable to establish the operational strategies for generation control, fuel procurement and power system risk management.

  • PDF

Modeling Generators Maintenance Outage Based on the Probabilistic Method (발전기 보수정지를 고려한 확률적 발전모델링)

  • Kim, Jin-Ho;Park, Jong-Bae;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.804-806
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are new iy defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

  • PDF

Control System Design of NREL 5MW Wind Turbine (NREL 5MW 풍력터빈의 제어시스템 설계)

  • Nam, Yoonsu;Im, Changhee
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.31-40
    • /
    • 2012
  • This paper introduces a methodology for NREL 5MW wind turbine, which is the variable speed and variable pitch(VSVP) control system. This control strategy maximizes the power extraction capability from the wind in the low wind speed region and regulates the wind turbine power as the rated one for the high wind speed region. Also, pitch control efficiency is raised by using pitch scheduling.Torque schedule is made of torque table depending on the rotor speed. Torque control is used for vertical region in a torque-rotor speed chart. In addition to these, mechanical loads reduction using a drive train damper and exclusion zone on a torque schedule is tried. The NREL 5MW wind turbine control strategy is comprised by the generator torque and blade pitch control. Finally, proposed control system is verified through GH Bladed simulation.

Technical Papers : Implementaion of KSR-3 Range Safety System (기술논문 : KSR-Ⅲ 비행안전 시스템 구현)

  • Kim,Ju-Nyeon;Go,Jeong-Hwan;Lee,Jae-Deuk;Park,Jeong-Ju
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • This paper describes the devlopment and implementation for the KOMPSAT-1 scheduling & automatic command plan generator(KSCG). Some problems in mission planning and command planning had occurred using the mission & command planning s/w in MAPS(Missin Analysis and Planning Subsystem) during the LEOP(Launch & Early Orbit Phase) & early normal mission phase due to lots of manual input process and non-automatic process. Therefore, the more mission operations for KOMPSAT-1. In order to prevent the development of new one(KSCG) which should reduce the manual process and generate automatically the command plan has been needed. As a result, the mission operations of KOMPSAT-1 has greatly became stable and more effient.