• 제목/요약/키워드: Gas & Oil Plant Project

검색결과 13건 처리시간 0.023초

THE INTRODUCTION METHOD OF TECHNOLOGY MANAGEMENT IN THE OIL AND GAS PLANT INDUSTRY

  • Doo Hee Lee;Young Woong Song;Hyoung Chul Lim;Yoon Ki Choi
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.249-258
    • /
    • 2007
  • Recently orders of projects in the field of oil and gas plants have increased due to rising oil prices and consumption. The markets of oil and gas plants are expanding into the Middle East area and all over the world. Because the oil and gas markets have a lot of overseas construction operations, competition among advanced companies is more important. However, companies in the period of growth have not had enough competitive powers of license in the design phase. Therefore, they are faced with difficulty of adopting the technology which is maximizing the effect of investments, and scheduling of a long-range plan. In order to achieve adequate technology management and competitive power, this study considers a long-range plan through an analysis of an appropriate introduction and the strategic planning process of technology management.

  • PDF

Gas & Oil 플랜트 조달관리 프로세스 분석 (Analysis of the Procurement Management Process for the Gas & Oil Plant projects)

  • 원서경;강민우;이준복;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.491-494
    • /
    • 2007
  • 국제 고유가에 힘입어 최근 중동의 산유국 중심으로 신규 사업 잘주가 이어지고 있다. 플랜트 산업은 엔지니어링(Engineering)과 조달(Procurement), 시공(Construction)이 융합된 복합산업(EPC)으로 고부가가치 산업이다. 또한 조달부문이 전체 사업비 규모의 70% 이상을 차지하므로 구매조달의 성패가 사업의 성패로까지 이어진다. 그러나 해외에서 다양한 사업참여 주체에 의해 수행되는 사업특성 상 구매조달 업무흐름 전체를 파악하고 원활히 사업을 수행하기란 어려운 실정이다. 따라서 최근 구매 및 조달 업무의 합리화를 통한 이윤창출 노력이 이어지고 있다. 본 연구에서는 해외 프로젝트를 수행하는 국내 주요 건설회사의 기존 구매조달 업무프로세스를 조사${\cdot}$분석하여 적정프로세스를 도출하였다. 또한 업무 프로세스상의 정보 및 문서의 입출력 정보를 분석하였다. 본 연구의 결과는 향후 해외 사업에 참여하게 되는 신규 업체의 인력 교육과 실무 활용에 이해를 도울 수 있는 자료로 활용될 수 있을 것으로 기대하며, 구매조달 업무 시스템 개발을 위한 자료로 활용될 수 있을 것이다.

  • PDF

오일.가스 플랜트 산업의 경쟁력 강화를 위한 기술경영 도입방안 (The Application Scheme of Management of Technology for Strengthen the Competitiveness in Oil and Gas Plant Industry)

  • 송영웅;최윤기
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.116-123
    • /
    • 2007
  • 최근 오일 가스 플랜트 분야는 국제 유가의 상승, 에너지 수요의 증가로 인하여 프로젝트 발주가 증가하고 있으며, 중동지역과 전 세계 지역으로 시장규모가 증대되고 있다. 오일 가스 플랜트는 제조 및 처리공정과 기술개발에 따른 라이센스 관리 및 기술관리가 프로젝트의 성패에 중요한 사항이다. 오일 가스 플랜트의 경우 다수의 해외공사 수행 형태를 가지며 해외 선진 업체와의 경쟁이 더욱 중요하다. 이러한 시장에서 기술 경쟁력과 기술 우위를 확보하기 위해서는 기술개발에 따른 체계적인 경영 방식을 도입하여야 한다. 하지만 국내 오일 가스 플랜트 업체의 경우 해외 선진 업체보다 라이센스, 설계단계의 기술 경쟁력이 부족하며 '기술 투자 비용 대 효과를 최대화' 하는 요소기술의 기술경영 도입이 어려운 현실이다. 이는 기술개발 및 관리의 인식 부족과 연구개발 인프라 구축에 따른 부담이 커서 장기적인 기술전략이 부족하기 때문이다. 따라서 본 연구에서는 오일 가스 플랜트 산업의 대외 경쟁력 확보를 위한 기술경영 도입방안을 분석함으로서 중장기적 기술개발 지원과 기술경영 도입방안을 제시하였다.

오일샌드 플랜트용 금속소재의 마모 특성에 대한 실험적 연구 (Experimental Study on Wear Characteristics of Metallic Materials used in Oil Sands Plants)

  • 원성재;조승현;강대경;허중식
    • Tribology and Lubricants
    • /
    • 제33권1호
    • /
    • pp.31-35
    • /
    • 2017
  • Recently, international attention has been focused on the development of non-traditional energy resources such as shale gas and oil sands, due to the steep increase in the demand for natural resources. The materials incorporated in an oil gas plant module experience extreme environments, and are prone to various problem such as fracture, corrosion and abrasion due to low-temperature brittleness. In order to improve the plant life, it is necessary to perform characteristics study and performance evaluation of the materials. In particular, this paper explains the main set of materials which are most frequently used in oil sands plant project. In order to investigate wear characteristics, the authors carried out abrasive wear tests of TP 316, stainless steel and SS 400, structural rolled steel. For the analysis of the abrasive wear resistance of an oil sands plant, the authors carried out the test according to ASTM G 105 "Standard Test Method for Conducting Wet Sand/Rubber Wheel Abrasion Test" standard guidelines. The authors have derived the results from the data associated with the loss of mass with respect to wear rate. During the test, for a given wear length for 10,000 revolutions, the rotational speed and applied force of the rubber wheel were varied.

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

석탄 SNG 생산설비의 수성가스전환 공정 분석 (Review on the water-gas shift process for a coal SNG project)

  • 김영도;신용승
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 추계학술대회 초록집
    • /
    • pp.75.1-75.1
    • /
    • 2011
  • Coal gasification is considered as one of the most prospective technologies in energy field since it can be utilized for various products such as electricity, SNG (Synthetic Natural Gas or Substitute Natural Gas) and other chemical products. Among those products from coal gasification, SNG is emerging as a very lucrative product due to the rising prices of oil and natural gas, especially in Asian countries. The process of SNG production is very similar to the conventional IGCC in that the overall process is highly dependent on the type of gasifier and coal rank. However, there are some differences between SNG production and IGCC, which is that SNG plant requires higher oxygen purity from oxygen plant and more complex gas cleanup processes including water-gas shift reaction and methanation. Water-gas shift reaction is one of the main process in SNG plant because it is a starting point for the latter gas cleanup processes. For the methanation process, syngas is required to have a composition of $H_2$/CO = 3. This study reviewed various considerations for water-gas shift process in a conceptual design on an early stage like a feasibility study for a real project. The factors that affect the design parameters of water-gas shift reaction include the coal properties, the type of gasifier, the overall thermal efficiency of the plant and so on. Water-gas shift reaction is a relatively proven technology compared to the other processes in SNG plant so that it can reduce technological variability when designing a SNG project.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

플랜트 유틸리티 시공에서 리스크 관리에 관한 연구 (On the Analysis of Risk Management for a Utility Construction Work in Plant Projects)

  • 한기돈;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

산업설비 EPC 업무 분석을 통한 정보 분류 내역에 관한 연구 (A Study on Information Breakdown through the Analysis of Industrial Engineering EPC Business Process)

  • 조항민;송영웅;최윤기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.167-172
    • /
    • 2006
  • 최근 해외 건설시장 플랜트 분야의 수주 증대에 따라 오일 ${\cdot}$ 가스 분야의 프로젝트가 증가하고 있다. 따라서 국내 건설 산업 업체들의 해외 플랜트 사업의 경쟁력을 확보하기 위해서는 기술 경쟁력 확보, 생산성 향상, 전략적 정영 추진 등 적극적인 대처 방안 수립이 요구되고 있다. 그 중에서도 해외 플랜트 사업의 오일 ${\cdot}$ 가스 분야는 산업 경쟁력 향상을 위하여 프로젝트 수행과 관련한 EPC(Engineering Procurement Construction : 이하 EPC) 유통 정보의 활용이 더욱 요구되지만, EPC 단계별 다양한 업무에서 발생하는 유동정보 콘텐츠를 효율적으로 관리하기 위한 콘텐츠 분류체계가 제시되고 있지 못하고 있다. 그로 인하여 설계도면의 변경, 중복업무의 발생, 업무주체간의 정보 누락 등의 문제점이 발생하고, 그러한 문제점으로 인하여 생산성 저하 현상이 나타나고 있다. 따라서 본 연구는 오일 ${\cdot}$ 가스 분야의 콘텐츠 관리체계의 실무적 활용의 증대와 건설산업 정보관리의 효용성을 향상시키기 위하여 콘텐츠 관리 체계를 확립하기 위한 BPM(Business Process Management) 기반의 콘텐츠 분류 체계를 제시하고자 한다. Business Process별 요구되는 지식의 유형을 체계화하고, 콘텐츠 정보를 분석하여 산업설비 유동정보의 체계화를 정립하고자 한다.

  • PDF