• Title/Summary/Keyword: Full-scale monitoring

Search Result 135, Processing Time 0.02 seconds

A Study on Automatic Calculation of Earth-volume Using 3D Model of B-Rep Solid Structure (B-Rep Solid 구조의 3차원 모델을 이용한 토공량 자동 산정에 관한 연구)

  • Kim, Jong Nam;Um, Dae Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.5
    • /
    • pp.403-412
    • /
    • 2022
  • As the 4th industrial revolution is in full swing and next-generation ICT(Information & Communications Technology) convergence technology is being developed, various smart construction technologies are being rapidly introduced in the construction field to respond to technological changes. In particular, since the earth-volume calculation process for site design accounts for a large part of the design cost at the construction site, related researches are being actively conducted to improve the efficiency of the process and accurately calculate the earth-volume. The purpose of this study is to present a method for quickly constructing the topography of a construction site in 3D and efficiently calculating earth-volume using the results. For this purpose, the construction site was constructed as a 3D realistic model using large-scale aerial photos obtained from UAV(Unmanned Aerial Vehicle). At this time, since the constructed 3D realistic model has a surface model structure in which volume calculation is impossible, the structure was converted into a 3D solid model to enable volume calculation. And we devised a methodology to calculate earth-volume based on CAD(Computer-Aided Design and Drafting) using the converted solid model. Automatically calculating earth-volume from the solid model by applying the method. As a result, It was possible to confirm a relative deviation of 1.52% from the calculated earth-volume from the existing survey results. In addition, as a result of comparative analysis of the process time required for each method, it was confirmed that the time required is reduced of 60%. The technique presented in this study is expected to be utilized as a technology for smart construction management, such as periodic site monitoring throughout the entire construction process, as well as cost reduction for earth-volume calculation.

A study on fault diagnosis of marine engine using a neural network with dimension-reduced vibration signals (차원 축소 진동 신호를 이용한 신경망 기반 선박 엔진 고장진단에 관한 연구)

  • Sim, Kichan;Lee, Kangsu;Byun, Sung-Hoon
    • The Journal of the Acoustical Society of Korea
    • /
    • v.41 no.5
    • /
    • pp.492-499
    • /
    • 2022
  • This study experimentally investigates the effect of dimensionality reduction of vibration signal on fault diagnosis of a marine engine. By using the principal component analysis, a vibration signal having the dimension of 513 is converted into a low-dimensional signal having the dimension of 1 to 15, and the variation in fault diagnosis accuracy according to the dimensionality change is observed. The vibration signal measured from a full-scale marine generator diesel engine is used, and the contribution of the dimension-reduced signal is quantitatively evaluated using two kinds of variable importance analysis algorithms which are the integrated gradients and the feature permutation methods. As a result of experimental data analysis, the accuracy of the fault diagnosis is shown to improve as the number of dimensions used increases, and when the dimension approaches 10, near-perfect fault classification accuracy is achieved. This shows that the dimension of the vibration signal can be considerably reduced without degrading fault diagnosis accuracy. In the variable importance analysis, the dimension-reduced principal components show higher contribution than the conventional statistical features, which supports the effectiveness of the dimension-reduced signals on fault diagnosis.

CQI Action Team Approach to Prevent Pressure Sores in Intensive Care Unit of an Acute Hospital Korea (중환자의 욕창 예방 연구 : 욕창 예방 QI팀을 중심으로)

  • Kang, So Young;Choi, Eun-Kyung;Kim, Jin-Ju;Ju, Mi-Jung
    • Quality Improvement in Health Care
    • /
    • v.4 no.1
    • /
    • pp.50-63
    • /
    • 1997
  • Background : A pressure sore was defined as any skin lesion caused by unrelieved pressure and resulting in damage to underlying tissue. The health care institutions in the United States were reported the incident rate of pressure sores ranging from 6 to 14 %. Intensive Care Unit needed highest quality of care has been found over 40% incidence rate of pressure sore. Also, Annual expenditures for the care of pressure sores in patients in the United States have been estimated to be $7.5 billion; furthermore, 50 percent more nursing time is required to care for patients with pressure sore in comparison to the time needed to implement preventive measures against pressure sore formation. However, In Korea, there were little reliable reports, or researches, about incidence rates of pressure sore in health care institution including intensive care unit and about the integrated approach like CQI action team for risk assessment, prevention and treatment of pressure ulcers. Therefore, this study was to develop pressure sore risk assessment tool and the protocol for prevention of pressure sore formation through CQI action team activities, to monitor incident rate of pressure sore and the length of sore formation for patients at high risk, and to approximately estimate nursing time for sore dressing during research period as the effect of CQI action team. Method : CQI action team in intensive care unit, launched since early 1996, reviewed the literature for the standardized risk assessment tool, developed the pressure sore assessment tool based on the Braden Scale, tested its validity, compared on statistics including incidence rate of pressure sore for patients at high risk. Throughout these activities, CQI action team was developed the protocol, called as St. Marys hospital Intensive Care Unit Pressure Sore Protocol, shifted the emphasis from wound treatment to wound prevention. After applied the protocol to patients at high risk, the incident rate and the period of prevention against pressure development were tested with those for patients who received care before implementation of protocol by Chi-square and Kaplan-Meier Method of Survival Analysis. Result : The CQI action team found that these was significant difference of in incidence rate of pressure sores between patients at high risk (control group) who received care before implementation of protocol and those (experimental group) who received it after implementation of protocol (p<.05). 25% possibility of pressure sore formation was shown for the patients with 6th hospital day in ICU in control group. In experimental group, the patients with 10th hospital day had 10% possibility of pressure sore. Therefore, there was significant difference(p<.05) in survival rate between two groups. Also, nursing time for dressing on pressure sore in experimental group was decreased as much as 50% of it in control group. Conclusion : The collaborative team effort led to reduced incidence, increased the length of prevention against pressure sore, and declined nursing care times for sore dressing. However, there have had several suggestions for future study. The preventive care system for pressure sore should be applied to patients at moderate, or low risk throughout continuous CQI team activities based on Bed Sore Indicator Fact Sheet. Hospital-wide supports, such as incentives, would be offered to participants for keeping strong commitment to CQI team. Also, Quality Information System monitoring incidents and estimating cost of poor quality, like workload (full time equivalence) or financial loss, regularly in a hospital has to be developed first for supporting CQI team activities as well as empowering hospital-wide QI implementation. Being several limitations, this study would be one of the report cards for the CQI team activities in intensive care unit of an acute hospital and a trial of quality improvement of health care in Korea.

  • PDF

Evaluation of Pollutant Removal Efficiency in Environmentally Friendly Full-scale Constructed Wetlands for Treating Domestic Sewage during Long-term Monitoring (장기 모니터링을 통한 환경친화형 인공습지 하수처리장의 수질정화효율 평가)

  • Seo, Dong-Cheol;Jo, In-Seong;Lim, Seok-Cheon;Lee, Byeong-Ju;Park, Seong-Kyu;Cheon, Yeong-Seok;Park, Jong-Hwan;Lee, Hong-Jae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.28 no.2
    • /
    • pp.97-105
    • /
    • 2009
  • A constructed wetland which was composed of aerobic and anaerobic areas was evaluated for 3 years to effectively treat the sewage produced in farming and fishing communities. For 3 years in a constructed wetland, biochemical oxygen demand(BOD), chemical oxygen demand(COD), suspended solids(SS), total nitrogen(T-N), and total phosphorus(T-P) in effluent were 0.2${\sim}$11.8, 1.0${\sim}$41.9, 1.1${\sim}$6.5, 4${\sim}$60 and 0.02${\sim}$3.51 mg/L, respectively. Removal rate of BOD, COD and SS in effluent were 97, 92 and 99%, respectively, in the third year. As time goes by, removal rate of T-N and T-P in treated water in aerobic area and effluent were gradually increased in a constructed wetland. In the third year, removal rate in effluent were 62 and 73%, respectively. By the seasons, removal rate of BOD, COD, SS, T-N and T-P were 97${\sim}$98, 87${\sim}$91, 99, 43${\sim}$61 and 76${\sim}$86%, respectively. Removal rate of BOD, COD, SS and T-P were not affected by the seasons, but that of T-N in winter and spring were decreased than the other seasons.

Radio location algorithm in microcellular wide-band CDMA environment (마이크로 셀룰라 Wide-band CDMA 환경에서의 위치 추정 알고리즘)

  • Chang, Jin-Weon;Han, Il;Sung, Dan-Keun;Shin, Bung-Chul;Hong, Een-Kee
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.23 no.8
    • /
    • pp.2052-2063
    • /
    • 1998
  • Various full-scale radio location systems have been developed since ground-based radio navigation systems appeared during World War II, and more recently global positioning systems (GPS) have been widely used as a representative location system. In addition, radio location systems based on cellular systems are intensively being studied as cellular services become more and more popular. However, these studies have been focused mainly on macrocellular systems of which based stations are mutually synchronized. There has been no study about systems of which based stations are asynchronous. In this paper, we proposed two radio location algorithms in microcellular CDMA systems of which base stations are asychronous. The one is to estimate the position of a personal station at the center of rectangular shaped area which approximates the realistic common area. The other, as a method based on road map, is to first find candidate positions, the centers of roads pseudo-range-distant from the base station which the personal station belongs to and then is to estimate the position by monitoring the pilot signal strengths of neighboring base stations. We compare these two algorithms with three wide-spread algorithms through computer simulations and investigate interference effect on measuring pseudo ranges. The proposed algorithms require no recursive calculations and yield smaller position error than the existing algorithms because of less affection of non-line-of-signt propagation in microcellular environments.

  • PDF