• Title/Summary/Keyword: Frequency Regulation

Search Result 637, Processing Time 0.025 seconds

Development of the Control System for Fast-Responding Frequency Regulation in Power Systems using Large-Scale Energy Storage Systems

  • Lim, Geon-Pyo;Park, Chan-Wook;Labios, Remund;Yoon, Yong-Beom
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.9-13
    • /
    • 2015
  • Energy storage systems (ESS) can be used to provide frequency regulation services in a power system to replace traditional frequency regulation power plants. Battery ESS, in particular, can provide "fast-responding frequency regulation," wherein the facility can respond immediately and accurately to the frequency regulation signal sent by the system operator. This paper presents the development and the trial run results of a frequency regulation control system that uses large-scale ESS for use in a large power system. The control system was developed initially for the 4 MW ESS demonstration facility in Jocheon Jeju Island, and was further developed for use in the 28 MW ESS facility at the Seo-Anseong substation and the 24 MW ESS facility at the Shin-Yongin substation to provide frequency regulation services within mainland Korea. The ESS facility in Seo-Anseong substation responds to a sudden drop in frequency via governor-free control, while the ESS facility in Shin-Yongin responds via automatic generator control (AGC).

Demonstration to Operate and Control Frequency Regulation of Power System by 4MW Energy Storage System (4MW 에너지저장장치의 전력계통 주파수 조정 운전제어를 위한 실증)

  • Lim, Geon-Pyo;Han, Hyun-Gyu;Chang, Byung-Hoon;Yang, Seung-Kwon;Yoon, Yong-Beum
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.3
    • /
    • pp.169-177
    • /
    • 2014
  • Operation and control system has been installed and tested to use energy storage system(ESS) for frequency regulation at 4MW class of ESS demonstration facility installed at Jeju island, Korea in 2013. Simulation tests were performed by programing language C# for power system of Jeju island to develop control algorithm. Site simulation tests were performed in control system itself without connecting power system and energy storage system. Control algorithm was coded, modified and tested to load to controller and communication system and human-machine interface were developed and tested in the process of simulation tests. After similar results to that of simulation tests by programing language were obtained, power system and energy storage system demonstration facility were connected to control system by communication system. Energy storage system for frequency regulation was tested for actual frequency and simulation frequency. The site tests showed the similar results to that of simulation tests and the control systems is possible to be operated for frequency regulation. Faster response of energy storage system for frequency regulation, less costs and less capacity of energy storage systems which cover for frequency regulation of power plants. It is expected that more studies for time-reduction and time-delay elements can make less capacity of energy storage system cover more role of frequency regulation of power plants.

Development and Application of Operation Methods of Battery Energy Storage System for Frequency Regulation (주파수조정용 배터리 에너지저장장치 운전방법의 개발과 적용)

  • Lim, Geon-Pyo;Park, Doo-Yong
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.2
    • /
    • pp.57-61
    • /
    • 2015
  • Current research and development efforts and other projects for energy storage systems (ESS) have recently been gaining attention. This is due to the many applications where ESS, particularly batteries, can be used. Among these are peak shaving, frequency regulation, and stabilization of renewable energy output. KEPCO has completed the construction and demonstration of a 4-MW battery energy storage system (BESS) located in Jeju City to verify its practicability in the power grid. KEPCO Research Institute has also been developing technology for the commercialization of BESS, and has been conducting a trial run of a 52-MW ESS (28MW + 24MW of Seo-Anseong and Shin-Yongin substations) constructed in 2014 for frequency regulation. This paper discusses the development of operation methods, as well as an operation user interface, for the safe operation and monitoring of BESS used for frequency regulation in a power system. Included are operation and simulation methods for various normal and transient frequency situations that can be experienced by a power system. Also discussed are the results obtained after applying these methods to the 4-MW BESS and the 52-MW ESS, both used for frequency regulation. The technology in this paper will be applied to 500MW ESS for frequency regulation of KEPCO by 2017. It is expected that this technology helps a safe and reliable operation and control of ESS for frequency regulation through its continuous upgrade.

Coordinated Virtual Inertia Control Strategy for D-PMSG Considering Frequency Regulation Ability

  • Shi, Qiaoming;Wang, Gang;Ma, Weiming;Fu, Lijun;Wu, You;Xing, Pengxiang
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.6
    • /
    • pp.1556-1570
    • /
    • 2016
  • In the process of virtual inertia control (VIC), the frequency regulation capability of the directly-driven wind turbine with permanent-magnet synchronous generator (D-PMSG) on wind farm is related to its rotor kinetic energy and capacity margin. This paper proposes the method for assessing the D-PMSG frequency regulation capability and defining its coefficient according to the operating state of wind power generators. In addition, the calculating method of parameters in VIC is also discussed according to the principles of primary frequency regulation and inertia response of synchronous generators. Then, by introducing the capability coefficient into the proportion-differential virtual inertia control (PD-VIC) for power coordination, a coordinated virtual inertia control (C-VIC) strategy is developed, with the consideration of the difference in frequency regulation capability between wind power generators. The proposed control method can not only give full play to the frequency regulation capability of wind power generators, decrease the movements of the pitch angle control system but also bring some self-coordination capability to different wind power generators thus to avoid a secondary drop in system frequency. The simulations and experiments prove the proposed method to be effective and practicable.

A Study on an Evaluation Modeling of Power System Performance for Frequency Regulation ESS Based on the PSCAD/EMTDC (PSCAD/EMTDC를 이용한 주파수조정용 ESS의 계통영향성 평가 모델링에 관한 연구)

  • Choi, Sung-Sik;Kang, Min-Kwan;Lee, Hu-Dong;Nam, Yang-Hyun;Park, Ji-Hyun;Rho, Dae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.8
    • /
    • pp.1024-1030
    • /
    • 2018
  • Recently, the large scaled energy storage system(ESS) which has various functions such as peak saving, demand management, output stabilization of renewable energy and frequency regulation(FR) is being energetically installed and operated. Especially, as the use case of frequency regulation ESS, the KEPCO has demonstrated the total of 376[MW] ESS since 2014. However, there are no operational experiences and international technical standards on frequency regulation application in ESS. Therefore, this paper propose the evaluation algorithm for power system performance of ESS by considering the frequency characteristics between governor of existing generator and frequency regulation ESS, in order to verify the power system performance of ESS. And also, this paper propose an evaluation modeling for small scaled power system including the existing generator, frequency control ESS and customer loads based on the PSCAD/EMTDC S/W. From the simulation results in 360[MW] model power system, it is confirmed that frequency regulation ESS has better performances than conventional generators.

Effect Analysis for Frequency Recovery of 524 MW Energy Storage System for Frequency Regulation by Simulator

  • Lim, Geon-Pyo;Choi, Yo-Han;Park, Chan-Wook;Kim, Soo-Yeol;Chang, Byung-Hoon;Labios, Remund
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.227-232
    • /
    • 2016
  • To test the effectiveness of using an energy storage system for frequency regulation, the Energy New Business Laboratory at KEPCO Research Institute installed a 4 MW energy storage system (ESS) demonstration facility at the Jocheon Substation on Jeju Island. And after the successful completion of demonstration operations, a total of 52 MW ESS for frequency regulation was installed in Seo-Anseong (28 MW, governor-free control) and in Shin-Yongin (24 MW, automatic generation control). The control system used in these two sites was based on the control system developed for the 4 MW ESS demonstration facility. KEPCO recently finished the construction of 184 MW ESS for frequency regulation in 8 locations, (e.g. Shin-Gimjae substation, Shin-Gaeryong substation, etc.) and they are currently being tested for automatic operation. KEPCO plans to construct additional ESS facilities (up to a total of about 500 MW for frequency regulation by 2017), thus, various operational tests would first have to be conducted. The high-speed characteristic of ESS can negatively impact the power system in case the 500 MW ESS is not properly operated. At this stage we need to verify how effectively the 500 MW ESS can regulate frequency. In this paper, the effect of using ESS for frequency regulation on the power system of Korea was studied. Simulations were conducted to determine the effect of using a 524 MW ESS for frequency regulation. Models of the power grid and the ESS were developed to verify the performance of the operation system and its control system. When a high capacity power plant is tripped, a 24 MW ESS supplies power automatically and 4 units of 125MW ESS supply power manually. This study only focuses on transient state analysis. It was verified that 500 MW ESS can regulate system frequency faster and more effectively than conventional power plants. Also, it was verified that time-delayed high speed operations of multiple ESS facilities do not negatively impact power system operations. It is recommended that further testing be conducted for a fleet of multiple ESSs with different capacities distributed over multiple substations (e.g. 16, 24, 28, and 48 MW ESS distributed across 20 substations) because each ESS measures frequency individually. The operation of one ESS facility will differ from the other ESSs within the fleet, and may negatively impact the performance of the others. The following are also recommended: (a) studies wherein all ESSs should be operated in automatic mode; (b) studies on the improvement of individual ESS control; and (c) studies on the reapportionment of all ESS energies within the fleet.

Feasibility Study for Application of Frequency Regulation ESS in Cuba: Technological Effects on Improving Frequency Compensation (쿠바 주파수조정 ESS 운영 전략 검토: 주파수 보상 효과 분석)

  • Kim, Soo-Yeol;Lee, Seong-eun;Kim, Jin-tae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.2
    • /
    • pp.123-127
    • /
    • 2020
  • KEPCO has installed Frequency Regulation ESS (FR ESS) of 376 MW since 2015. Frequency Regulation is ancillary service to support stabilizing system frequency, which is divided into governor free and automatic generation control. KEPCO operates FR ESS as governor free application and leads FR ESS market with capability of diverse demonstration and operation experiences. To expand FR ESS role during transient states of power system, KEPCO has extended operating time of charging and discharging. KEPCO has also changed speed droop lower than before to improve contribution on frequency compensation, and acquired much experiences of differentiating bad cells from others. Based on these technologies and know-hows, KEPCO Research Institutes received request of feasibility study and technical cooperation for overseas FR ESS business. This paper suggests the simple and practical method for making technological feasibility study of FR ESS.

Decentralized Vehicle-to-Grid Design for Frequency Regulation within Price-based Operation

  • Kim, Seung Wan;Jin, Young Gyu;Song, Yong Hyun;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.1335-1341
    • /
    • 2015
  • The utilization of electric vehicles has been suggested to support the frequency regulation of power system. Assuming that an intermediate aggregator exists, this study suggests a decentralized vehicle-to-grid operation scheme in which each vehicle-to-grid aggregator can behave independently of the power system operator. To implement this type of decentralized operation, this study adopts a price-based operation that has been proposed by many researches as an alternative operation scheme for the power system. In this environment, each vehicle-to-grid aggregator can determine its participation in vehicle-to-grid service in consideration of its residual energy of aggregated system and real-time market price. Consequently, the main purpose of this study is to verify whether or not the vehicle-to-grid power can effectively support the current frequency regulation function within the price-based operation scheme. Specifically, a frequency regulation method is proposed based on the real-time price signal, and a feedback controller for battery management is designed for decentralized vehicle-to-grid operation.

Utility AC Frequency to High Frequency ACPower Conversion Circuit with Soft Switching PWM Strategy

  • Sugimura Hisayuki;Ahmed Nabil A.;Ahmed Tarek;Lee Hyun-Woo;Nakaoka Mutsuo
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.5B no.2
    • /
    • pp.181-188
    • /
    • 2005
  • In this paper, a DC smoothing filterless soft switching pulse modulated high frequency AC power conversion circuit connected to utility. frequency AC power source is proposed for consumer induction heating hot water producer, steamer and super heated steamer. The operating principle of DC link filterless utility frequency AC-high frequency AC (HF AC) power conversion circuit defined as high frequency cycloinverter is described, which can operate under a principle of ZVS/AVT and power regulation based on alternate asymmetrical PWM in synchronization with the utility frequency single phase AC positive or negative half wave voltage. The dual mode modulation control scheme based on high frequency PWM and commercial frequency AC voltage PDM for the proposed high frequency cycloinverter are discussed to enlarge its soft switching commutation operating range for wide HF AC power regulation. This high frequency cycloinverter is developed for high frequency IH Dual Packs Heater (DPH) type boiler used in consumer and industrial fluid pipeline systems. Based on the experiment and simulation results, this high frequency cycloinverter is proved to be suitable for the consumer use IH-DPH boiler and hot water producers. The cycloinverter power regulation and power conversion efficiency characteristics are evaluated and discussed.

Development of Operation and Control Technology of Energy Storage System for Frequency Regulation and Operation by Grid Connected Automatic Control (주파수조정용 에너지저장장치 운전제어 기술의 개발과 계통연계 자동제어 운전)

  • Lim, Geon-Pyo;Choi, Yo-Han;Im, Ji-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.4
    • /
    • pp.235-241
    • /
    • 2016
  • Grid-connected, large-capacity energy storage systems (ESS) can be used for peak load supply, frequency regulation, and renewable energy output smoothing. In order to confirm the capability of battery ESS to provide such services, 4MW/ 8MWh battery ESS demonstration facility was built in the Jocheon substation on Jeju Island. The frequency regulation technology developed for the Jocheon demonstration facility then became the basis for the 28MW and 24MW frequency regulation ESS facilities installed in 2014 at the Seo-Anseong and Shin-Yongin substations, respectively. The operation control systems at these two facilities were continuously improved, and their successful commercialization led to the construction of additional ESS facilities all over Korea in 2015. In seven (7) locations nationwide (e.g., Shin-Gimje and Shin-Gyeryeong), a total of 184 MW of ESS had been commercialized in 2016. The trial run for the new ESS facilities had been completed between April and May in 2016. In this paper, results of the trial run from each of the ESS facilities are presented. The results obtained from the Seo-Anseong and Shin-Yongin substations during a transient event by a nuclear power plant trip are also presented in this paper. The results show that the frequency regulation battery ESS facilities were able to quickly respond to the transient event and trial run of ESS is necessary before it is commercialized.