The Application Of F.C.M(Free Cantilever Method) Case Study Of The Railway Bridge (철도교량 F.C.M(Free Cantilever Method) 공법 시공사례 연구)

  • Kwon, Soon-Seob;Kim, Kyong-Yeon;Choi, Dong-Kee;Jeong, In-Choul;Shin, Sang-Chul
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.562-567
    • /
    • 2005
  • F.C.M applied from Jin Jung Li to Yang Su Li(660m) in Puk Han River Bridge(1,414m) construction part is a construction method on the double-track construction which is the third section part of work, called Chung Ang Railroad Line(Deok-So${\sim}$Won-Ju). This method is the beginning application on Railroad Bridge. After completing upper slab structure, there are several following works such as setting up ballast, sleepers and laying long rails. So it is important to consider the properties of Railroad Bridge while designing the length of bridge and its single span. After the physical process study the shrinkage and creep of concrete, bending up by prestressing in general PSM bridge, relaxation of tendons as time goes by after post-tension, the conclusion of such a study is applied to the Puk-Han River Bridge in this construction field.

  • PDF

Bridge Design of Seoul Expressway (North Area) (도시고속화도로(북부간선)의 교량설계)

  • 변윤주;김우종
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1991.10a
    • /
    • pp.135-139
    • /
    • 1991
  • The Seoul expressway is designed with prestressed concrete box girders. As a construction method, Precast Free Cantilever Method (P.F.C.M) is used which is introduced to Korea first time. Especially, the end spans in each bridge are designed to be constructed by cantilever method using temporary cantilever tendons. And pier and pierhead are prestressed vertically and horizontally.

  • PDF

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.