• Title/Summary/Keyword: Footing resistance

Search Result 26, Processing Time 0.027 seconds

Test and Analysis of Fall-Of-Potential at Towers of Energized Transmission Lines (운전 중인 송전선로의 철탑 전위강하시험과 해석)

  • Kang, Yeon-Wook;Lee, Dong-Il;Shim, Eung-Bo;Kim, Kyung-Chul;Choi, Jong-Kee
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.5
    • /
    • pp.195-201
    • /
    • 2006
  • Tower footing resistance and fault current division factor are important design factors for evaluation of the lightning performance of the transmission line and/or design of the grounding electrode system. The periodic measurement of those factors are also important to verify that the grounding performance of the towers has been maintained good. However, the direct measurement of those factors in operating or energized condition is very difficult because of many practical reasons, such as the difficulty of disconnecting overhead groundwires from the tower under test. With supports by GECOL (General Electricitiy Company of Libya), we had a special chance to conduct Fall-Of-Potential (FOP) test on the energized 220 kV transmission towers before and after disconnecting the overhead groundwires from the towers under test. In this paper, the FOP test results on the towers and the fault current division factors estimated from the comparision of the FOP tests with and without overhead groundwires were presented. The computer models for the FOP test simulations were also constructed to find that the simulated results agreed very well with the measured ones.

Estimation Of Footing Settlement In Sand (사질토 지반에서의 얕은기초 침하량 해석)

  • Lee, Jun-Hwan;Park, Dong-Gyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.44-49
    • /
    • 2004
  • The settlements of footings in send are often estimated based on the results of in-situ tests, particularly the standard penetration test (SPT) and the cone penetration test (CPT). In this paper, we analyze the load-settlement response of vertically loaded footings placed in sands using both the finite element method with a non-linear stress-strain model and the conventional elastic approach. Calculations are made for both normally consolidated and heavily overconsolidated sands with various relative densities. For each case, the cone penetration resistance qc is calculated using CONPOINT, a widely tested program that allows computation of qc based on cavity expansion analysis. Based on these analyses, we propose a procedure for the estimation of footing settlement in sands based on CPT results.

  • PDF

Overturning Resistance of Plain Concrete Piers in OSPG Railroad Bridges

  • Rhee, In-Kyu;Park, Joo-Nam;Choi, Eun-Soo
    • International Journal of Railway
    • /
    • v.3 no.1
    • /
    • pp.1-6
    • /
    • 2010
  • The steel plate-girder bridges with concrete gravity piers have possibilities of overturning by lateral inertial force which can be reproduced by sudden earthquake attack. This paper explores an overturning mechanism of existing concrete gravity pier onto the sandy soil in the event of lateral push-over load by in-situ experimental observation. The in-situ push-over experiment for pier with earth anchors between spread footing and rock beds exhibits a reasonable enhancement of ductility against overturning. In unanchored system, a flexural crack at cold joint of concrete pier is not developed because of the over-turning of the pier. This leads a global instability (rotation) of pier-footing system with relatively low stresses in pier itself. While a lateral load is persistently increased in anchored system, the successive flexural cracking failure at cold joint is observed even after the local shear failure of soil due to redistribution of stress equilibrium between soil and pier structure as long as a tensile action of anchor cable is active.

  • PDF

Strengthening of isolated square footings using passive wrapping systems

  • Lu, Xingji;Aboutaha, Riyad S.
    • Computers and Concrete
    • /
    • v.27 no.1
    • /
    • pp.41-54
    • /
    • 2021
  • This paper introduced three new strengthening systems for isolated footings: BFRP wrapping system, CFRP wrapping system, and steel jacketing system. The proposed systems are more practical than the current traditional methods, which involves installing many dowel bars and splicing reinforcing steels to join new and old concrete segments. In the proposed three new systems, BFRP wraps, CFRP wraps, or steel jackets are installed on the exterior surface of the enlarged footing, with construction adhesive or a few steel dowels being applied to the contact surfaces. To investigate the effectiveness of three systems, forty-four models were constructed in ABAQUS, with different parameters being considered. All footings investigated failed in punching shear, including original and retrofitted footings. According to FEA results and parametric studies, the three strengthening systems were capable of improving the punching shear resistance of footings. By introducing a new factor η, the punching shear equation in Eurocode 2 was modified to predict the punching shear resistances of the strengthened footings. A linear formula was developed to present the relationship between the new factor η and the investigated parameters.

The Study on Local Composite Behavior of Connection Member between Steel Pipe Pile and Concrete Footing (강관 말뚝 기초 두부 연결부의 합성거동에 대한 연구)

  • You, Sung-Kun;Park, Jong-Myen;Park, Dae-Yong;Kim, Young-Ho;Kang, Won-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.2
    • /
    • pp.288-296
    • /
    • 2003
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the related specification, type B-method is provident. To investigate real structural behavior of type B connection, several load tests are done with carefully designed experimental system. The purpose of this experiment is mainly focused on the understanding of actual behavior which can be predicted by design theory. At this research stage, vertical and lateral loading test are done for three types of specimen to review stress concentration, formation and behavior of imaginary RC column in the footing and effect of non-slip device installed in the steel pipe pile. The load resistance mechanism in these specific connection method is predicted based on both experimental results. The three-dimensional finite element modeling is also done for the purpose of comparison between numerical and experimental result. With all the results gained from experiment the structural behavior of imaginary RC column in the design concept is confirmed. The role of non-slip device is very important and it affects the resistance capacity with help of composite action of concrete and steel pipe pile.

An Experimental Study on Reinforcement Method for Reuse of Onshore Wind Turbine Spread Footing Foundations (육상풍력터빈 확대기초의 재사용을 위한 보강방법에 관한 실험적 연구)

  • Song, Sung Hoon;Jeong, Youn Ju;Park, Min Su;Kim, Jeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.1-11
    • /
    • 2021
  • In order to reuse existing onshore turbine foundations, it is important to redesign and reinforce the existing foundations according to the upgraded tower diameter and turbine load. In the present study, a slab extension reinforcement method and structure details of an anchorage part were examined in consideration of the reuse of spread footings, which are the most widely used foundation type in onshore wind turbine foundations. Experiments were conducted to evaluate the load resistance performance of a reinforced spread footing according to structure details of an anchorage part. The results showed that (1) the strength of an anchorage part could be increased by more than 30 % by adding reinforcement bars in the anchorage part, (2) pile-sleeves attached to an anchor ring contributed to an increase in rotational stiffness by preventing shear slip behavior between the anchor ring and the concrete, and (3) slab connectors contributed to an increase in the strength and deformation capacity by preventing the separation of new and old concrete slabs.

Measurement of Energized Tower Footing Resistance by Fall-Of- Potential Test (운전 중인 송전철탑의 전위강하시험에 의한 접지성능 진단)

  • Shin, Bok-Hyun;Ryu, Cheol-Hwan;Kim, Jae-Yeol;Kang, Yeon-Wook;Choi, Jong-Kee
    • Proceedings of the KIEE Conference
    • /
    • 2006.05a
    • /
    • pp.44-47
    • /
    • 2006
  • 송전철탑의 접지저항은 승선선로의 내뢰성능 평가에 중요한 파라메타 중 하나이다. 송전선로가 일단 가압된 이후에는 가공지선에 의해 모든 철탑이 병렬 연결되어 철탑 단독의 접지저항 측정은 현실적으로 어려운 문제가 있다. 본 논문에서는 리비아전력청의 협조 하에 가공지선 분리 전후의 220 KV 송전철탑의 접지저항측정을 위하여 수행한 전위강하시험과 컴퓨터 시뮬레이션에 의한 분석결과를 제시함으로써 컴퓨터 모델을 이용한 철탈 접지저항 추정방법의 신뢰성을 검증하고자 한다.

  • PDF

A Study on Separation Distance Calculation Model for Limitation of Earth Potential Rise Nearby Tower Footings (송전철탑 부근의 대지전위 억제를 위한 이격거리 산정모델 연구)

  • Choi, Jong-Kee;Cho, Hwan-Gu;Kim, Tai-Young;Lee, Dong-Il
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.2
    • /
    • pp.179-183
    • /
    • 2008
  • In case of a line-to-ground fault at transmission lines, a portion of fault current will flow into the earth through the footings of the faulted tower causing electrical potential rise nearby the faulted tower footings. In this situation, any buried pipelines or structures nearby the faulted tower can be exposed to the electrical stress by earth potential rise. Although many research works has been conducted on this phenomena, there has been no clear answer of the required separation distance between tower footings and neary buried pipeline because of its dependancy on the soil electrical charactersics of the concerned area and the faulted system. In this paper, an analytical formula to calculate the requried sepeartion distance from the faulted tower has been derived.

New Simulation Method of Flashover Rate by Connection of EMTP and MATLAB

  • Seo, Hun-Chul;Han, Joon;Choi, Sun-Kyu;Lee, Byung-Sung;Kim, Chul-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.602-608
    • /
    • 2016
  • Because of the random characteristics of lightning, the Monte Carlo method is applied to estimate the flashover rate due to lightning, however, the simulations using previous methods are difficult to both beginner and expert in power corporations. Therefore, this paper proposes the new and easy method to simulate the flashover rate by connection of electromagnetic transients program (EMTP) and MATLAB. The magnitude of a lightning strike is based on a curve measured in the field, while the classification of direct and indirect lightning depends on the striking distance. In a Korean distribution system, the flashover rate induced by lightning is simulated using proposed method. Simulations of the footing resistance according to the existence of an overhead ground wire (OHGW) are performed and the simulation results are discussed. The simulation results are compared with findings obtained with the IEEE Flash 2.0 program.

Comparison on Characteristics between air-gap type and gapless In transmission LA (송전선로 피뢰기 적용 및 외부 갭형과 갭레스형의 동작특성 비교)

  • You, Hee-Young;Kim, Jong-Chae;Kim, Byeong-Heon;Park, Yoon-Seok;Lee, Bong-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.347-348
    • /
    • 2008
  • This paper presents the use of Line Surge Arresters on 154kV double circuit lines. The ouatge rate which is highly related to the tower footing resistance is showed during the last a few year. The general methods that have been adopted at lines also are introduced. Lightning performance of lines without and with line surge arrester is studied and compared. The characteristics between air-gap type and gapless type LSA also compared. Line surge arrester installation strategy is presented.