• Title/Summary/Keyword: Flow line

Search Result 2,334, Processing Time 0.038 seconds

Numerical Analysis of a Tip Leakage Vortex in an Axial Flow Fan (축류홴 익단누설와류의 수치적 해석)

  • Jang, Choon-Man;Kim, Kwang-Yong
    • 유체기계공업학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.404-411
    • /
    • 2003
  • Three-dimensional vortical flow and separated flow topology near the casing wall in an axial flow fan having two different tip clearances have been investigated by a Reynolds-averaged Wavier-Stokes (RANS) flow simulation. The simulation shows that the tip leakage vortex formed close to the leading edge of the blade tip on suction side grows in the streamwise direction. On the casing wall, a separation line is formed upstream of the leakage vortex center due to the interference between the leakage vortex and main flow. The reverse flow is observed between the separation line and the attachment line generated downstream of the trailing edge, and increased with enlarging tip clearance. The patterns of a leakage velocity vector including a leakage flow rate are also analyzed according to two tip clearances. It is noted that the understanding of the distribution of a limiting streamline on the casing wall is very important to grasp the characteristics of the vortical flow in the axial flow fan.

  • PDF

Effects of Aperture Densitv Distribution on the Flow Through a Rock Fracture with Line-Source and Line-Collection

  • Park, Chung-Kyun;Hahn, Pil-So
    • Nuclear Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.485-495
    • /
    • 1998
  • Migration characteristics of tracers in a rock fracture in a case of line-source and line-collection was studied. The fracture plane was discretized into a square mesh to which variable apertures were assigned. The spatially varying apertures of a fracture were generated using a geostatistical method, based on a given aperture probability density distribution and a specified spatial correlation length. The flow potential and pressure at each node were computed. Calculations showed that fluid flow occurs predominantly through a few preferred paths. Hence, the large range of apertures in the fracture gives rise to flow channeling. The solute transport was calculated using a particle tracking method. The migration plumes of tracer between injection line and withdrawal line are displayed in contour plots. The elution curves are shown to be controlled by the aperture density distribution and to be insensitive to statistical realization and spatial correlation length.

  • PDF

On-line Monitoring of Glucose and Starch by a Flow Injection Analysis Technique (흐름주입분석 기술에 의한 글루코우스와 전분의 온라인 모니터링)

  • 김준홍;박돈희;이종일
    • KSBB Journal
    • /
    • v.16 no.5
    • /
    • pp.459-465
    • /
    • 2001
  • The on-line monitoring technique for the concentrations fo glucose and starch by FIA(Flow Injection Analysis)system was studied. Glucose oxidase(GOD) and amyloglucosidase(AMG) were immboilized on VA-Fpoxy carrier and integrated into the FLA system. The pH, buffer flow rate and temperature were optimized and the effects of salts and metabolites dissolved in the sample on the activity of immobilized enzyme were investigated. GOD-FIA and AMG/GOD-FIA were applied for the on-line monitoring of the glucose and starch in a simulated bioprocess. The on-line measurements of glucose concentrations by GOD-FIA agreed with off-line data well and the AMG/GOD-FIA with single cartidge system took and advantage over the FIA system with two separated cartridges for the on-line monitoring of starch concentrations.

  • PDF

A Study on the Learning GUI for the Load Flow of Power System (전력조류계산을 위한 학습용GUI에 관한 연구)

  • Lee, Hee-Yeong
    • Proceedings of the KIEE Conference
    • /
    • 2004.07e
    • /
    • pp.27-29
    • /
    • 2004
  • This paper presents improved teaching and learning Gill for easily analysis tool of load flow of power system. This GUI includes not only contingency analysis function, but also calculating power loss from transmission line flow. The Gill is friendly for study for power system operation and control because picture provide a better visualizing of relationships between input parameters and effect than a tabula type result. This Gill enables topology and the output data of load flow for line outages to be shown on same picture page. Users can input the system data for power flow on the the picture and can easily see the the result diagram of bus voltage, bus power, line flow. It is also observe the effects of different types of variation of tap, shunt capacitor, loads level, line outages. Proposed Gill has been studied on the Ward-Hale 6-Bus system.

  • PDF

Power Flow Control of Modular Multilevel Converter based on Double-Star Bridge Cells Applying to Grid Connection

  • Hamasaki, Shin-Ichi;Okamura, Kazuki;Tsuji, Mineo
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.2
    • /
    • pp.246-253
    • /
    • 2013
  • The Modular Multilevel Converter (MMC) with full bridge cells is available for utility interactive inverter in high voltage line. When it is interconnected with power line, it is possible to control the active power flow in order to supply or charge the power in the line. This research applied the MMC to grid connection system of distributed generator and a power flow control for the MMC is investigated. Theory of power flow between the MMC and the power line is described and control method of power flow and capacitor voltages on arm cells for the MMC are proposed. And effectiveness of the proposed control method is presented by simulation.

Characteristics of the Ice Slurry Transportation System for District Cooling Depending on the Transportation Lines (지역냉방용 아이스슬러리 수송시스템의 배관방식에 따른 특성)

  • Lee Yoon-Pyo;Chung Jae-Dong;Yoon Seok-Mann
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.7
    • /
    • pp.571-577
    • /
    • 2006
  • The characteristics of ice packing factor (IPF) at the ice slurry system using one line type are compared with the system using two lines type. The installation space for one transporting line is saved at the one line system. For the one line type, the ice packing factor is reduced along the downstream, but for the two lines type, the ice packing factor is fixed. For the one line system, mass flow rate in the main line is fixed along the down-stream, but for two lines system, the mass flow rate in the main line is reduced along the downstream. For one line system, along the down stream after IPF=0, the temperature at the main steam is increased, and the extracted mass flow is increased. The initial IPF, at which the IPF is not arrived at zero upto the final node, is proposed for the B area.

Analysis on Signal Flow Graph of Slotted LIne (Slotted Line의 Signal Flow Graph 해석)

  • 박기수
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.6 no.3
    • /
    • pp.8-11
    • /
    • 1969
  • In the precision measurement of the voltage standing wave ratio (VSWR) or reflection coefficient by means of the slotted line technique, one of the important factors is the maximum error due to the discontinuities and multi-reflection in the slotted line. Particularly, this error becomes a critical factor when the VSWR or the reflection coefficient to be measured is very small. In this paper, the exact expression of this error is obtained by means of the Signal flow graph method.

  • PDF

Mixed Model Assembly Line-Balancing Using Simulation (시뮬레이션을 이용한 혼합모델 조립라인밸런싱)

  • 임석진;김경섭;박면웅;김승권
    • Journal of the Korea Society for Simulation
    • /
    • v.11 no.4
    • /
    • pp.69-80
    • /
    • 2002
  • This study deals with the productivity improvement on a flow production system with the consideration of line-balancing. In a flow production system, similar product models are produced on a same assembly line, the predefined process order and the limitation of total worker number. The system can be increased the work-in -process(WIP) inventory and the worker's idle time. In this study, the worker assignment model is developed to assign evenly workload of process to each product model in such a manner that each process has the different number of worker. This worker assignment model is the mathematical model that determines worker number in each process such that the idle time of processes is reduced and the utilization of worker is improved. We use a simulation technique to simulate the production line proposed by the mathematical model and apply real production line. With the result of simulation, this study analyzes the propriety of production line and proposes the alternatives of new production line

  • PDF

An approximate procedure for throughput of 3-stage flow line considering quality inspection (품질을 고려한 3-stage flow line의 수율 근사계산)

  • Lee, Jong-Seung;Ji, Yong-Hoon
    • Journal of Industrial Technology
    • /
    • v.16
    • /
    • pp.207-216
    • /
    • 1996
  • This paper develops an algorithm for throughput of a 3-stage flow line with job inspection stations, limited buffer capacity, and exponential processing times. Each stage consists of a single workstation, and an infinite number of jobs always waits in front of the first workstation. Blocking may occur when a processed job is waiting at one workstation for another workstation to become available. Numerical example results provide insights into the problems related to quality inspection and measure of performance of flow lines.

  • PDF

A study on Material Flow Improvement of Multiproduct Flow Line Production System (다품종흐름생산 시스템의 물류개선에 관한 연구)

  • Lee, Hwa-Ki;Seong, Youn-Ho
    • IE interfaces
    • /
    • v.6 no.1
    • /
    • pp.99-112
    • /
    • 1993
  • This study deals with analysis of material from in Tube manufacturing line. This line is a multi product flow ship type production line, which consists of 5 steps of work station. Some work stations involve in unnecessary moving activities of workers and much work in-process storage due to the non-systematic material flow with respect to the different lot size production of multi-items. To improve productivity for this line, one alternative is considered such as grouping two work stations by using GT and JIT concepts. Also, feasibility analysis for this alternative is performed using and simulation model built by SIMAN IV simulation language.

  • PDF