최근에 들어서 홍수조절과 생태적 기능을 모두 만족시키는 방안으로서 천변저류지에 대한 관심이 증가하고 있다. 본 연구에서는 경상남도 창녕군의 토평천 유역을 대상으로 하여 천변저류지를 설치하였을 경우 천변저류지로 인한 홍수조절 효과를 분석, 검토하였다. 천변저류지는 우포늪의 상류 및 중하류에 골고루 분포하는 것을 가정하였으며, 홍수위 저감 효과 이외에도 침수 면적과 피해 저감 등의 홍수 조절 효과를 분석하였다. 연구 결과 천변저류지로 인하여 홍수 조절 효과가 있는 것으로 나타났으나, 여러 천변저류지의 형식이나 조합에 따라서 조절 효과는 상이하게 나타났다. 따라서, 천변저류지를 설치할 경우 저류용량의 극대화 보다는 실제적인 홍수 조절효과 분석을 통한 홍수 조절 효과의 극대화를 지향하는 것이 타당하다고 보여진다.
Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.
홍수기 다목적댐 운영의 목적은 홍수조절용량을 최대한 이용하여 하류 주요 지점의 첨두홍수량을 저감시키거나, 계획홍수량을 초과하지 않도록 방류량과 방류시점을 조절함으로써 홍수피해규모를 최소화하는 것이다. 따라서 홍수기 다목적댐 운영에 있어 가장 중요한 것은 최적의 방류시점과 방류량의 결정이며 이를 통해 홍수기말 이수용량을 최대로 확보 하는 점이다. 본 연구에서는 다목적 최적화기법의 하나인 goal programming을 이용하여 홍수기 저수지 최적운영을 실시하였다. goal programming은 선형계획법 또는 비선형계획법을 이용하여 두 개 이상의 목적을 가진 문제의 최적 대안을 구하기 위해, 목표값으로부터의 편차의 합을 최소화하여 최적화하는 기법이다. 홍수기 다목적댐 운영에서 goal programming의 적용성을 검토하기 위해 실제 홍수 사상을 이용하여, 단일저수지 운영과 저수지 연계운영을 실시하였다. 단일저수지 운영을 적용하기 위한 시험유역으로는 충주댐 유역을 선정하였고 저수지 연계운영을 적용하기 위한 시험유역으로는 안동댐과 임하댐 유역을 선정하였다. goal programming의 결과 분석을 위해 저수지 모의운영 모형인 HEC-5 모형의 결과와 비교, 분석하였다. 검토 결과 goal programming을 이용할 경우 홍수기 말에 저수지 수위를 홍수기제한수위로 유지할 수 있었으며 주요 지점의 홍수량을 매 시간 적절히 계획홍수량 아래로 유지할 수 있었다. goal programming을 이용한 최적 운영의 경우 전 구간의 유입량을 알고 있다고 가정한 점에서 실제 저수지 운영과는 차이가 있으나, 적절한 제약조건을 적용하고 홍수예경보를 이용하여 예보된 유입량을 활용하면 최적의 방류량 시점과 방류량을 산정하여 홍수기 다목적댐을 효율적으로 운영할 수 있으며 주요 지점의 홍수량도 저감할 수 있을 것으로 판단된다.
기후변화로 인한 극한홍수의 피해를 저감하면서 동시에 자연친화적 수변구역의 홍수완충공간을 조성하기 위해 제방이 건설되기 이전의 홍수범람 범위와 하천구역을 참조하여 홍수터 복원을 수행할 필요가 있다. 이에 본 연구에서는 금강 대상구간에 대해 고지도를 활용하여 홍수터 복원가능 공간의 입지 선정 방법을 제안하고 홍수터를 홍수완충공간으로 활용할 경우 홍수위 저감 효과를 부정류 수치모의를 통해 분석하였다. 고지도를 활용하여 하천구역 변화를 분석한 결과, 1919년에 비해 2020년 하천구역 면적이 단계적으로 총 27.8% 감소 (1,059,380 m2)한 것으로 추정되었으며, 과거 홍수범람 구역이었던 제내지를 offline 저류지로 복원할 경우 2,200,868 m3의 유효 저류용량을 가지는 것으로 나타났다. HEC-RAS 부정류 모의를 통해 분석한 홍수위와 홍수량 조절 효과는 대상구간의 하류 단면에서 16 cm와 219.01 m3/s인 것으로 나타났다. 본 논문의 수치모의에는 홍수완충공간이 offline 저류지 형식으로 적용되었으며, 제방 후퇴/이설을 통한 홍수터의 확대가 적용될 경우 홍수위 저감 효과는 다르게 나타날 수 있다.
본 연구에서는 저류함수법과 Loopnet(부정류해석모형) 모형으로 홍수예측 시스템을 구성하여 대청댐의 방루에 따른 하류지역의 홍수영향을 에측하여 보았다. 대청댐 하류부에 지역빈도 분석방법(L-모멘트)으로 강우량을 산정하고, 홍수예측시스템으로 금강 하류부의 홍수추적을 실시하여 빈도별 홍수량을 산정하였다. 또한 대청댐의 방류에 따른 금강 하루 주요지점의 홍수량, 홍수위 및 방류량 도달시간을 산정하여 홍수발생시 대청댐 운영의 지표포 활동할 수 있도록 하였다.
임진강 유역은 북한과 인접해 있는 지리적 특성 때문에 수문관측에 어려움이 있고 급작스러운 홍수발생 시 대응측면에서 취약하다. 이에 따른 대책으로 2005년 군남홍수조절지 건설이 계획되었다. 그러나 이러한 구조적 대책에도 불구하고 북한의 무단방류에 의한 피해가 계속 발생되고 있고, 2012년부터 지속된 한반도 가뭄의 영향과 북측댐의 일방적인 저수로 임진강 유량이 급격히 감소하여 임진강 하류에서 가뭄 피해가 발생하고 있다. 따라서, 본 연구에서는 임진강유역의 가뭄피해를 대비하고 홍수발생 시 효율적인 대응시간을 확보하기 위하여 군남홍수조절지의 새로운 운영방법을 도출하였다. 먼저 가뭄피해 대비를 위해 저수용량을 확보하는 방안으로서 홍수기 군남홍수조절지 운영수위를 EL.23.0 m에서 EL.31.0 m로 상향하여 유지하는 운영방법은 기존운영방법과 비교 분석 시 약 14백만 $m^3$의 용수를 추가 확보할 수 있다. 또한, 홍수발생 시 초기 $250m^3/s$로 조절방류를 하여 유입량을 일부 저류시키는 운영방법은 기존운영방법과 비교 분석 시 저수지 저류효과가 평균 2.66% 증가한 것으로 나타났다. 이는 기존의 운영방법과 비교하였을 때 평균 약 19시간의 대응시간 확보가 가능한 것으로 분석되었다.
This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.
본 연구의 목적은 하천의 홍수저감을 목적으로 설치하는 하천변 저류지의 홍수저감특성을 분석하기 위한 모형의 개발에 있다. 하천에 홍수가 발생하였을 경우에 하천변 저류지는 하천의 홍수첨두 일부를 분담하는 기능을 갖으며, 이는 제방의 일부를 낮춘 월류제를 통한 범람으로 가능하게 되며, 또한 범람된 물은 저류지 내에서 저류 하게 된다. 이러한 저류지가 갖는 홍수저감특성은 하천 홍수위, 월류제 제원(높이, 위치, 길이 등), 저류지의 수리거동 등에 의해 좌우되게 되므로, 본 연구에서는 이러한 일련의 물의 거동을 재현하기 위해서 1차원 하천부정류 모델, 월류제 상의 월류량 산정 모델 및 제내지 홍수범람 모델을 연계한 통합모형을 개발 하였다. 이상에서 개발된 연계 모형을 가상하도 및 실제하도에 적용하여 월류제가 갖는 기하적 특성이 홍수경감에 미치는 영향에 대해 분석하였으며, 이를 통해 향후 개선하여야 할 시사점에 대해 기술하였다.
For optimal irrigation reservoir operation during flood and normal period, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. We developed Open Water Management Program (OWMP) with an open architecture to deal with newly arising upgrade problems for optimal management of irrigation reservoir. And we evaluated the applicability of OWMP to estimate daily runoff from an agricultural watershed including irrigation reservoirs, and analyzed behaviour of irrigation reservoirs as irrigation water requirements considering frequency analysis of reservoir storage and frequency analysis water requirements for effective management of reservoir. When we executed OWMP with data produced from an experimental field, IHP basins, the mean relative errors of application of daily runoff and irrigation water requirement were less than 5%. We also applied OWMP to a Seongju irrigation reservoir to simulate daily runoff, storage and water requirement from 1998 to 2002, and the mean model efficiency between measured and simulated value was 0.76. Our results based on the magnitude of relative errors and model efficiency of the model simulation indicate that the OWMP can be a tool nicely adapted to the effective water management of irrigation reservoir for beneficial water use and flood disaster management.
Ecological society and energy conservative systems has become a subject of world wide attention. To examine the technologies of such systems as resource recycling society, this study is proposed for using rainwater as energy source and water resources in urban area. Useful informations for planning of utilizing rainfall as energy source, water resources, emergency water and controlling flood are discussed with model systems in urban area. It is calculated that the rate of utilizing rainwater, amounts of utilizing rainwater, substitution rate of supply water, amounts of overflow rainwater according to rain storage tank volume. By applying the past weather data, The optimum volume of rain water storage was calculated as 200m$^3$ which mean no benefits according to the increase of storage tank volumes. For optimum planing and control method at the model system, several running method of rainwater storage tank was calculated. The optimum operating method was the using weather data as 3hours weather forecast.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.