Journal of the Korea Institute of Military Science and Technology
/
v.16
no.3
/
pp.268-276
/
2013
The objective of this paper is to give a general understanding for the development flight test of Korean Utility Helicopter(KUH). This paper contains the contents of detailed flight test plan, the type of flight test, an introduction to main flight test area, and the overview of flight test results. At the beginning, more than 8,500 test points were identified for airworthiness certification to show the compliance for the KUH development requirements. However, the number of flight test points were optimized to 7,800 at the end. To accomplish the test objectives, about 860 flight test sorties had been performed, and more than 1,000 test sorties were consumed for trouble shooting. This paper also describes some major issues faced during development flight test phase.
In this report US and Korea civil and military simulator certification system is researched, and a plan for improvement is proposed. Korean simulator certification system should adopt FAA's system and improve upon it. Certification criteria should have a basis on FAA certification criteria and add military operation characteristics selectively. Flight test data, used as comparison criteria in certification, should be acquired in package during aircraft development or overseas acquisition. The establishment of certification system is expected to improve external credibility and improve competitiveness in overseas market.
In order to ensure the individual and mutual performances among the telemetry system, tracking system, flight termination system, GPS, and inertial navigation & guidance system which are installed in the KSLV-I 2nd stage and ground equipment of the Naro space center, flight test using a light airplane is required. Since the high degree of test efficiency is fulfilled through the minute plan and analysis about selection of the equipment which are applicable to the test, harness, operation strategy, and antenna installation. KSLV-I communication environment and flight profile should be precisely taken into account during the flight test. In this document, overall aspect of the KSLV-I 2nd stage equipment specification, a rack for the installation, harness, the airplane specification, and flight route which are required for the effective flight test are presented.
Proceedings of the Korean Society of Propulsion Engineers Conference
/
2017.05a
/
pp.1054-1056
/
2017
The Preparation for a flight test of the launch vehicle to verify the performance of the liquid rocket engine(LRE) is proceeding. Flight test of liquid rocket engine costs an enormous amount of money, has a restriction on measurement channels, so it requires the optimal measurement plan to check the prelaunch operation and determine the cause of abnormal situation. This paper surveys the foreign sources for LRE flight test. In recent years, as the tendency to eliminate all faults of LRE at the ground test the number of flight test is decreasing and in contrast, the number of measurements and measurement accuracy is increasing. This paper may be used as a reference for the preparation of an LRE flight test.
Ye, Sung-Hyuck;Ryu, Chung-Ho;Hwang, Gyu-Hwan;Seo, Il-Hwan;Kim, Hyung-Sup
Journal of the Korea Institute of Military Science and Technology
/
v.14
no.3
/
pp.405-413
/
2011
Defense Systems Test Center in ADD supports increasingly various missile test requirements such as higher altitude event, multi target operation and low-altitude, high velocity target tracking. In this paper, we have proposed the development of instrumentation radar tracking status simulator based on virtual reality. This simulator can predict the tracking status and risk of failure using several modeling algorithms. It consists of target model, radar model, environment model and several algorithms includes the multipath interference effects. Simulation results show that the predict tracking status and signal are similar to the test results of the live flight test. This simulator predicts and analyze all of the status and critical parameters such as the optimal site location, servo response, optimal flight trajectory, LOS(Line of Sight). This simulator provides the mission plan with a powerful M&S tool to rehearse and analyze instrumentation tracking radar measurement plan for live flight test at DSTC(Defense Systems Test Center).
The ground integration test of Smart UAV has been performed according to the flight test plan. The flight test of full scaled model will be performed followed by 4 DOF ground rig test and a tethered hover test. Smart UAV is the first indigenous tiltrotor aircraft which can fly with fast cruise speed and take off or land vertically. In order to prove the flight control law of Smart UAV, the 40% scaled airplane was developed and have been tested. During flight test of small scaled model, many unique and unexpected problems occurred. After clearing these problems, fully automatic flight test was performed successfully. The experiences about many trouble shooting and resolving the problems would be basic material to avoid the unexpected but similar flight test problems hidden behind of the full scaled Smart UAV. This paper presents the detailed procedures of trouble shootings to solve the unique problems which occurred during the flight test of small scaled tiltrotor UAV.
Journal of the Korea Institute of Military Science and Technology
/
v.21
no.4
/
pp.541-550
/
2018
The works of preparing for missile flight test are becoming more complicated. To reduce the amount of waste time along with the complexity of the task, systematic analysis of waste factors should be performed before performing process improvement. The waste factors for missile flight test are first defined using lean-based waste factors. The improvement priorities for the defined waste factors are surveyed. For reliable analysis, AHP is used in questionnaire analysis instead of the existing method with large error. Then weighting and priority for waste factors for level 1 and Level 2 are suggested. Through AHP, we could derive reliable improvement priorities for waste factors. It is analyzed that the biggest cause of waste factors is waiting time and identified as the first item to be considered when establishing improvement plan. In addition, suggestions for improvement measures of waste factors are presented through brainstorming method. Reliable results will be an important factor in process redesign for missile flight test works.
Proceedings of the Korean Society of Propulsion Engineers Conference
/
2012.05a
/
pp.465-467
/
2012
A layout plan of a pressure-fed test facility to carry out hot-firing test of liquid rocket engine combustion chamber and purpose of rooms located in the test building were proposed. The layout plan of suggested infrastructure in this paper was determined depending on the design of a vertical test facility to use the natural lay of the land and simulate the initial position of flight model.
ATTOL is a software unit testing tool produced by the ATTOL Testware SA in France. It automates the entire software unit testing process: test plan template and test program generation, test program execution, test result analysis and test report generation. ATTOL is suited for the development of embedded software as it allows programmers to operate in native and cross development environments. Particularly, it is used for the development of the flight software which is embedded in the Communication Ocean Meteorological Satellite (COMS). As the flight software is mission-critical, it requires the strict software quality and high testing constraints. The flight software of COMS is verified by ATTOL in native and cross platforms. In 2002, ATTOL was taken over by the IDM Rational Software and has been supplied with the name of Test RealTime (TestRT). The test process of TestRT becomes different from that of ATTOL as TestRT provides the new functionalities that were absent from ATTOL. TestRT provides the new features in the test script language, as well. In this paper, we compare the test process of ATTOL to TestRT With an example of COMS and explain what has been changed in the test script language.
Proceedings of the Korean Society of Propulsion Engineers Conference
/
v.y2005m4
/
pp.1-1
/
2005
Japan Aerospace Exploration Agency(JAXA) has been conducting research and development of the Scramjet engines and their derivative combined cycle engines as hypersonic propulsion system for space access. Its history will be introduced first, and its recent advances, focusing on the engine performance progress, will follow. Finally, future plans for a flight test of scramjet and ground test of combined cycle engine will be introduced. Two types of test facilities for testing those hypersonic engines. namely, the 'Ramjet Engine Test Facility (RJTF)' and the 'High Enthalpy Shock Tunnel (HIEST)' were designed and fabricated during 1988 through 1996. These facilities can test engines under simulated flight Mach numbers up to 8 for the former, whereas beyond 8 for the latter, respectively. Several types of hydrogen-fueled scramjet engines have been designed, fabricated and tested under flight conditions of Mach 4, 6 and 8 in the RJTF since 1996. Initial test results showed that the thrust was insufficient because of occurrence of flow separation caused by combustion in the engines. These difficulty was later eliminated by boundary-layer bleeding and staged fuel injection. Their results were compared with theory to quantify achieved engine performances. The performances with regards to combustion, net thrust are discussed. We have reached the stage where positive net thrust can be attained for all the test coditions. Results of these engine tests will be discussed. We are also intensively attempting the improvement of thrust performance at high speed condition of Mach 8 to 15 in High Enthalpy Shock Tunnel (HIEST). Critical issues for this purposemay be air/fuel mixing enhancement, and temperature control of combustion gas to avoid thermal dissociation. To overcome these issues we developed the Hypermixier engine which applies stream-wise vortices for mixing enhancement, and the M12-engines which optimizes combustor entrance temperature. Moreover, we are going to conduct the flight experiment of the Hypermixer engine by utilizing flight test infrastructure (HyShot) provided by the University of Queensland in fall of 2005 for comparison with the HIEST result. The plan of the flight experiment is also presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.