• Title/Summary/Keyword: Fixture unit

Search Result 45, Processing Time 0.022 seconds

The comparative study - the regenerative effect depends on size of bone graft material in bone loss site around dental implant (임플란트 주위 골 결손부의 이식재 크기에 따른 재생 효과 비교 연구)

  • O, Hong-Kyun;Hong, Ki-Seok;Chung, Chin-Hyung;Yim, Sung-Bin
    • Journal of Periodontal and Implant Science
    • /
    • v.38 no.3
    • /
    • pp.493-502
    • /
    • 2008
  • Purpose: The purpose of this study is to investigate on the regenerative capacity by using different size of graft materials around bony defect around implant. Material and Methods: Dental implant fixtures(Bio-TIS, Korea) were placed into the tibia of 8 rabbits. After placement of implant, artificial defects were created for each group, and the size of bone graft materials were used according to each designated group. 4 weeks after surgery, 8 rabbits were sacrificed. The histologic and histomorphometrical study were done for comparison of the regenerative capacity using $80-90{\mu}m$ and $200{\sim}1000{\mu}m$ size of grafting materials of OCS-$B^{(R)}$. Result: Matured bone formation was significantly increased more in Group E1($80-90{\mu}m$) than in Group E2($200{\sim}1000{\mu}m$). Group E1($80-90{\mu}m$) showed more significant augmentation in marginal length of graft material per unit area than Group E2($200{\sim}1000{\mu}m$). Group E1($80-90{\mu}m$) showed more interspace in graft material than Group E2($200{\sim}1000{\mu}m$). Control group showed no new bone formation around and inside of implanted fixture. Conclusion: Small grafting material size has great influence on bone regeneration.

Predicted Performance of the Integrated Artificial Lighting System in Relation to Daylight Levels (채광시스템과 인공조명설비의 통합기술 및 성능평가연구)

  • Kim, G.;Kim, J.T.
    • Journal of the Korean Solar Energy Society
    • /
    • v.22 no.3
    • /
    • pp.47-56
    • /
    • 2002
  • The office is an excellent candidate for implementing daylighting techniques because of the relatively high electric lighting power densities and long daytime use pattern. The quantity of light available for a space can be translated in term of the amount of energy savings through a process of a building energy simulation. To get significant energy savings in general illumination, the electric lighting system must be incorporated with a daylight - activated dimmer control. A prototype configuration of an office interior has been established and the integration between the building envelope and lighting and HVAC systems is evaluated based on computer modeling of a lighting control facility. First of all, an energy-efficient luminaire system is designed for both a totally open-plan office interior and a partitioned office. A lighting design and analysis program, Lumen-Micro 2000 predicts the optimal layout of a conventional fluorescent lighting fixture to meet the designed lighting level and calculates unit power density, which translates the demanded amount of electric lighting energy. A dimming control system integrated with the contribution of daylighting has been applied to the operating of the artificial lighting. Annual cooling load due to lighting and the projecting saving amount of cooling load due to daylighting under overcast diffuse sky are evaluated by a computer software, ENER-Win. In brief, the results from building energy simulation with measured daylight illumination levels and the performance of lighting control system indicate that daylighting can save over 70 percent of the required energy for general illumination in the perimeter zones through the year. A 25 % of electric energy for cooling may be saved by dimming and turning off the luminaires in the perimeter zones.

On the Development of Spot and ARC Welding Dual-Purpose Robot System (스포트 및 아크 용접 겸용 로보트 시스템의 개발)

  • Ryuh, B.S.;Lee, Y.J.;Lee, Y.B.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.6
    • /
    • pp.13-19
    • /
    • 1995
  • A dual purpose robot automation system is developed for both arc welding and spot welding by one robot within a cell. The need for automation of both arc welding and spot welding processes is urgent while the production volume is not so big as to accommodate separate stations for the two processes. Also, space is too narrow for separate stations to be settled down in the factory. A spot welding robot is chosen and the functions for arc welding are implemented in-house at cost of advanced functions. For the spot welding, a single pole type gun is used and the robot has to push down the plate to be wolded, which causes the robot positioning error. Therefore, position error compensation algorithm is developed. The basic functions for the arc welding processes are implemented using the digital I/O board of robot controller, PLC, and A/D conversion PCB. The weaving pattern is taught in meticulously by manual teach. A fixture unit is also developed for dual purpose. The main aspects of the system is presented in this paper especially in the design and implementation procedure. The signal diagrams and sequence logic diagrams are also included. The outcome of the dual purpose welding cell is the increased productivity and good production stability which is indispensable for production volume prediction. Also, it leads to reduction of manufacturing lead time.

  • PDF

Structural Performance of the Cast-in-place Anchor in Cracked Concrete used in Power Plant Facilities (균열 콘크리트에 매립된 발전설비 현장설치용 선 설치 앵커의 구조성능 평가)

  • Kim, Dong-Ik;Jung, Woo-young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.7
    • /
    • pp.120-128
    • /
    • 2019
  • It is very important to verify the seismic performance and stability of the power plant fixture in the domestic power plant, because earthquakes have increased in frequency around the world which resulted in the frequent occurrence of power plant damage caused by the failure of electric power facilities. In this study, through the on-site inspection of power plant fixation unit installed in domestic power plants, we carried out structural performance evaluation of the fixation unit anchor bolts installed on the concrete slabs. The field survey showed M12 J hook anchor bolts were used. Anchor bolt pullout and shear performance evaluation were performed based on ASTM E 488-96 standard. Moreover, artificial crack with the width of 0.5 mm was applied during the experiment based on ATM355.4 and ETAG 001. The comparison of M12 J hook anchor bolt pullout and shear test result to design value required in domestic and international design standard, show a satisfactory result. M12 J hook anchor pullout and shear performance was found to be about 35% and 7%, respectively, higher than the required design value.

Structural Static Test for Validation of Structural Integrity of Fuel Pylon under Flight Load Conditions (비행하중조건에서 연료 파일런의 구조 건전성 검증을 위한 구조 정적시험)

  • Kim, Hyun-gi;Kim, Sungchan;Choi, Hyun-kyung;Hong, Seung-ho;Kim, Sang-Hyuck
    • Journal of Aerospace System Engineering
    • /
    • v.16 no.1
    • /
    • pp.97-103
    • /
    • 2022
  • An aircraft component can only be mounted on an aircraft if it has been certified to have a structural robustness under flight load conditions. Among the major components of the aircraft, a pylon is a structure that connects external equipment such as an engine, and external attachments with the main wing of an aircraft and transmits the loads acting on it to the main structure of the aircraft. In civil aircraft, when there is an incident of fire in the engine area, the pylon prevents the fire from spreading to the wings. This study presents the results of structural static tests performed to verify the structural robustness of a fuel pylon used to mount external fuel tank in an aircraft. In the main text, we present the test set-up diagram consisting of test fixture, hydraulic pressure unit, load control system, and data acquisition equipment used in the structure static test of the fuel pylon. In addition, we introduce the software that controls the load actuator, and provide a test profile for each test load condition. As a result of the structural static test, it was found that the load actuator was properly controlled within the allowable error range in each test, and the reliability of the numerical analysis was verified by comparing the numerical analysis results and the strain obtained from the structural test at the main positions of the test specimen. In conclusion, it was proved that the fuel pylon covered in this study has sufficient structural strength for the required load conditions through structural static tests.