• 제목/요약/키워드: Finex

검색결과 12건 처리시간 0.016초

nm-수준의 상분리를 이용하여 제조한 고강도 고인성 철계 비정질 합금 (Fe-based Amorphous Alloy with High Strength and Toughness Synthesized based on nm-scale Phase Separation)

  • 이광복;박경원;이상호;이재철
    • 대한금속재료학회지
    • /
    • 제48권1호
    • /
    • pp.1-7
    • /
    • 2010
  • Experiments have demonstrated that the addition of a moderate amount of V to $Fe_{52}Co_{(20-x)}B_{20}Si_4Nb_4V_x$ amorphous alloy enhances the plasticity of the alloy. In particular, $Fe_{52}Co_{17.5}B_{20}Si_4Nb_4V_{2.5}$ alloy withstood a maximum of 8.3% strain prior to fracture along with a strength exceeding 4.7 GPa. Energy dispersive x-ray spectroscopy conducted on the $Fe_{52}Co_{17.5}B_{20}Si_4Nb_4V_{2.5}$ alloy exhibited evidence of compositional modulation, indicating that nm-scale phase separation had occurred at local regions. In this study, the role played by nm-scale phase separation on the plasticity was investigated in terms of structural disordering and shear localization in order to better understand the structural origin of the enhanced plasticity shown by the developed alloy.

서울 지하철공사 발파공법의 표준화 (Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh)

  • 허진
    • 기술사
    • /
    • 제16권3호
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF