• 제목/요약/키워드: Field Demonstration Data

검색결과 66건 처리시간 0.036초

개인용 혈당측정기의 신뢰성 보증시험 개발 (Development of Reliability Demonstration Test for Personal Blood Glucose Meters)

  • 김기영;박호준;박찬수;함중걸;장중순
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제13권4호
    • /
    • pp.299-307
    • /
    • 2013
  • The value of blood sugar is measured by a personal blood glucose meter which consists of two parts: a glucose strip and a blood glucose meter. A personal blood glucose meter makes use of electric media which are composed of glucose oxidase and electron. This study is to propose a method of reliability demonstration test derived from field data analysis and FMEA(Failure Mode and Effect Analysis). Detailed Conditions for reliability demonstration test are selected from the comparison of various failure mechanisms. The most dominant failure mechanism is wear-out which is caused by strip insertion/extraction. The testing device that can reproduce the failure mechanism of strip insertion/extraction is made to conduct reliability demonstration test. Using the testing device, it is confirmed that target lifetime of selected devices is more than 2 years.

Growth Monitoring for Soybean Smart Water Management and Production Prediction Model Development

  • JinSil Choi;Kyunam An;Hosub An;Shin-Young Park;Dong-Kwan Kim
    • 한국작물학회:학술대회논문집
    • /
    • 한국작물학회 2022년도 추계학술대회
    • /
    • pp.58-58
    • /
    • 2022
  • With the development of advanced technology, automation of agricultural work is spreading. In association with the 4th industrial revolution-based technology, research on field smart farm technology is being actively conducted. A state-of-the-art unmanned automated agricultural production demonstration complex was established in Naju-si, Jeollanam-do. For the operation of the demonstration area platform, it is necessary to build a sophisticated, advanced, and intelligent field smart farming model. For the operation of the unmanned automated agricultural production demonstration area platform, we are building data on the growth of soybean for smart cultivated crops and conducting research to determine the optimal time for agricultural work. In order to operate an unmanned automation platform, data is collected to discover digital factors for water management immediately after planting, water management during the growing season, and determination of harvest time. A subsurface drip irrigation system was established for smart water management. Irrigation was carried out when the soil moisture was less than 20%. For effective water management, soil moisture was measured at the surface, 15cm, and 30cm depth. Vegetation indices were collected using drones to find key factors in soybean production prediction. In addition, major growth characteristics such as stem length, number of branches, number of nodes on the main stem, leaf area index, and dry weight were investigated. By discovering digital factors for effective decision-making through data construction, it is expected to greatly enhance the efficiency of the operation of the unmanned automated agricultural production demonstration area.

  • PDF

3kW급 계통연계형 태양광발전시스템의 성능 비교분석 (Performance Analysis of 3kW Grid-Connected PV System)

  • 소정훈;정영석;유권종;이기옥;최주엽;안현식
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 춘계전력전자학술대회 논문집(2)
    • /
    • pp.707-710
    • /
    • 2003
  • 3kW grid-connected photovoltaic (PV) system and data acquisition system are constructed for performance analysis of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data acquisition system. From these results, the performances of PV system have simulated and evaluated using simulation tool in comparison with actual value of data acquisition system of field demonstration test center. Furthermore, performance of total PV system e.g. electric power and loss factor at the site are reviewed.

  • PDF

태양광발전용 계통연계형 PCU의 성능특성 분석평가 (Analyses and Evaluation of Gird Connected PCU for PV System)

  • 소정훈;정영석;유권종;최주엽
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 추계학술대회 논문집
    • /
    • pp.65-68
    • /
    • 2003
  • 3kW grid-connected photovoltaic(PV) systems and data acquisition system are constructed for performance analysis of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data acquisition system. From these results, the performances of PV systems have simulated and evaluated using simulation tool In comparison with actual value of data acquisition system of field demonstration test center. Furthermore, performance of each PV system e.g. electric power and loss factor is reviewed.

  • PDF

녹색경영시스템 시범인증기업 심사 자료의 이해 (Understanding of Audit Results from Demonstration Companies toward Green Management System Certificate)

  • 박동준;강병환;김호균
    • 경영과학
    • /
    • 제30권2호
    • /
    • pp.107-116
    • /
    • 2013
  • Climate changes and environmental pollution recently became a matter of global interest. Korean government established low carbon green growth act in the light of international environment regulation and started demonstration certificate project for GMS (Green Management System). We aim to explore audit data resulted from demonstration companies that pursued the GMS certificate. The demonstration companies are consisted of 11 companies that a certification body L gave the certificate. The audit data results were formed by minor nonconformities detected in the field evaluation based on GMS standards, KS I 7001/2 : 2011. We found out significant differences for minor nonconformities between types of industry and between major clauses of Part 1 and Part 2 in GMS standards. We make an effort to figure out the implication of causes of the significant differences. These results are expected to contribute to understand GMS operation situations and are utilized as a reference for energy management, social responsibility, and green gas reduction.

Performance Analysis of Grid-Connected PCS for PV System by Field Demonstration Test

  • So J.H.;Jung Y.S.;Yu G.J.;Jung M.W.;Kang G.H.;Choi J.Y.
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 춘계전력전자학술대회 논문집(2)
    • /
    • pp.516-519
    • /
    • 2003
  • 3kW photovoltaic (PV) systems and data acquisition system are constructed for performance analysis of PV system at field demonstration test center (FDTC) of Korea. As climatic and irradiation conditions are varied, the performance characteristics of PV system are collected and analyzed in data acquisition system. From these results, the performances of gird-connected power conditioning system (PCS) fur PV system have been evaluated and analyzed. Furthermore, performance indices of grid-connected PCS e.g. output power, efficiency, loss factor, and the other index at the site are reviewed.

  • PDF

3kW급 계통연계형 태양광발전시스템의 실증시험 분석평가 (Analysis and Evaluation of 3kW Grid-Connected PV System by Field Demonstration Test)

  • 소정훈;유권종;정명웅;정영석;최주엽
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 B
    • /
    • pp.1353-1355
    • /
    • 2003
  • Total six units of 3kW photovoltaic (PV) system and data acquisition system (DAS) are constructed for analyzing performance of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data-acquisition system. Furthermore, not only performance test of each PV system component such as PV module and power conditioning system, but also performance of total PV system e.g. system efficiency, electric power and loss factor at the site are reviewed.

  • PDF

3㎾ 태양광발전시스템 실증연구 I (The Field Demonstration Study of Residential 3㎾ PV System)

  • 김형석;박정국;임홍우;조금배;백형래;최창주
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2003년도 학술대회논문집
    • /
    • pp.365-367
    • /
    • 2003
  • Total six units of 3㎾ photovoltaic system and data acquisition system (DAS) are constructed for analyzing performance of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied. operation characteristics of the PV system are collected and analyzed in data-acquisition system furthermore, not only performance test of each PV system component such as PV module and power conditioning system but also performance of total PV system e.g. system efficiency power and loss factor at the site are reviewed.

  • PDF

배전용 STATCON 설치 사례-설치 및 평가 (Field Demonstration of the Distribution STATCON-Installation & Evaluation)

  • 차재덕;김준모;홍순욱;이학성;이기선;오관일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 F
    • /
    • pp.2641-2643
    • /
    • 1999
  • This paper describes the first field demonstration of the distribution STATCON in Korea including installation and its evaluation for improving power quality in distribution system. The purpose of installation is to verify functionally the voltage source inverter based equipment for voltage regulation and harmonic mitigation in distribution line. The operational data resulting from field test and the site figure are included.

  • PDF

포터블 기반 스마트 구조 응답 모니터링 시스템 개발 및 현장 적용성 평가 (Development of a Portable-Based Smart Structural Response Monitoring System and Evaluation of Field Applicability)

  • 박상기;서동우;박기태;김호진
    • 한국방재안전학회논문집
    • /
    • 제16권4호
    • /
    • pp.147-156
    • /
    • 2023
  • 케이블 교량의 거동은 동적 응답에 의해 지배적이며 상대적으로 복잡하므로 교량의 상태를 평가하기 위한 장단기 현장 계측이 요구되는 경우가 빈번하다. 영구적인 SHMS(Structural Health Monitoring System)가 설치되지 않은 경우 성능평가를 위해 이동식 모니터링 시스템이 필요하다. 이 경우 교량의 위치와 형태에 따라 전력, 통신 등의 제한된 여건으로 인해 이동식 모니터링 시스템 운영에 어려움이 발생할 수 있다. 본 연구에서는 국내는 물론 동남아 지역 교량의 장 ‧ 단기 모니터링에 효과적으로 활용될 수 있는 포터블 기반의 스마트 구조응답 모니터링 시스템을 개발하였다. 개발된 시스템은 현장에서 자체 전원 공급 시스템을 이용하여 장시간 운용이 가능한 다채널 휴대용 데이터 수집 및 분석 장비이며, 실시간 데이터를 이용하여 케이블 교량의 동적 특성을 자동으로 분석할 수 있는 알고리즘을 탑재하고 있다. 개발된 시스템의 현장 적용성을 평가하기 위해 한국과 베트남의 케이블 교량에서 현장 실증을 수행하였으며, 이를 통해 개발된 시스템의 현장 운영의 신뢰성과 효율성을 확인하였고, 추가적으로 케이블 교량 모니터링 분야에서의 해외 시장 적용 가능성을 확인하였다.