• Title/Summary/Keyword: Field Construction

Search Result 5,520, Processing Time 0.038 seconds

A case study of digital twin construction based on geospatial building information modeling (GeoBIM) - Focusing on the case of Jaeamcheon-gul and Jeonggusu-gul in Jeju Island - (지하공간건설정보모델링(GeoBIM) 기반의 디지털 트윈 구축사례에 관한 연구 - 제주도 재암천굴, 정구수굴 사례를 중심으로 -)

  • Lee, Jong-Hyun;An, Joon-Sang;Choi, Jae-Woong;Baek, Yong
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.20-30
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction is actively researched, in the domestic construction field, and one of the key elements in this field is Building Information Modeling(BIM). In Korea, smart construction is being implemented through BIM-based digitization and intelligence. The geotechnical engineering field should also prepare for the introduction of BIM. In this study, the concept and application status of GeoBIM were identified, and the direction of future research was presented. This study is a part of the study "Establishment of GeoBIM-based Digital Twin Maintenance System" in the current "Technology Development for Establishment of Jeju Ground Collapse Response System for Safe Road Operation". The subject and scope of the study is continuous excavation at caves located under roads in Jeju Island, and initial research is being conducted on Jaeamcheon-gul and Jeonggusu-gul. This study aims to build a digital twin through individual data construction and integration processes such as cave shape modeling using laser scanners, 3D stratum modeling using borehole information and geophysical exploration data, and modeling of surrounding conditions using drones.

Investigation on Factors Influencing Creep Prediction and Proposal of Creep Prediction Model Considering Concrete Mixture in the Domestic Construction Field (크리프 예측 영향요인 검토 및 국내 건설현장 콘크리트 배합을 고려한 크리프 예측 모델식 제안)

  • Moon, Hyung-Jae;Seok, Won-Kyun;Koo, Kyung-Mo;Lee, Sang-Kyu;Hwang, Eui-Chul;Kim, Gyu-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.503-510
    • /
    • 2019
  • Recently, construction technology of RC structures must be examined for creep in concrete. The factors affecting the creep prediction of concrete and the results of creep in domestic construction field were reviewed. The longer the creep test period and the higher the compressive strength, the higher the creep prediction accuracy. The higher the curing temperature, the higher the initial strength development of the concrete, but the difference in the creep coefficients increased over time. Based on the results of creep evaluation in the domestic construction field and lab. tests, a modified predictive model that complements the ACI-209 model was proposed. In the creep prediction of real members using general to high strength concrete, the test period and temperature should be considered precisely.

An Improvement of Quality Standard and Construction Quality Control for Field Application of Epoxy-Coated Reinforcing Bars (에폭시 피복철근 현장적용을 위한 품질 기준 및 시공품질관리 개선에 관한 연구)

  • Jung, Chan-Gu;Jung, Hie-Young;Kim, Jee-Sang;Shim, Sung-Pho;Shim, Jin-Ah
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.3
    • /
    • pp.190-198
    • /
    • 2018
  • The Epoxy-coated Reinforcing bars have been proved to be able to extend a durability life because of its excellent corrosion resistance in bridges and structures under marine and severe environments. The usage of epoxy-coated reinforcement is continuously increasing in developed countries such as the US and Japan. However, domestic use is extremely limited due to lack of research and development, poor production facilities, low quality, increase of initial costs, and difficulty of field management. This study suggests the improvement of construction quality management such as manufacturing, transportation and construction for the field application through the test construction of the proven product in the related test results of the epoxy coated steel bars produced in the recently improved manufacturing facility.

Field Survey on the Construction Errors for the Members of Reinforced Concrete Structures (현장조사를 통한 철근콘크리트 구조 부재의 시공오차에 관한 연구)

  • Yoon, Sang-Chun;Jee, Nam-Yong;Choi, Ki-Bong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.201-208
    • /
    • 2010
  • Information on the distribution characteristics of construction errors is very important to determine the member factors, which are to be introduced in a new Korean design code for reinforced concrete structures. The new design code, which is under development for reinforced concrete structures, is based on the performance design concept. The construction errors of reinforced concrete members are mainly caused by the firmness and dimensional accuracy of forms, the arranging condition of reinforcing bars, the pouring and compaction methods of concrete, the skills of field workers, and the experience of supervisors. To find out the construction errors of reinforced concrete structures already built in Korea, a field survey for cover thickness, effective depth of reinforcement, the thickness of slabs and walls, and the dimension of beams and columns has been performed. Based on the survey, which is the first time in Korea, the analysis results are presented. The measuring methods for the construction errors, which have been established through the laboratory tests, are also presented. In addition, the measured construction errors from the survey are compared with the allowable tolerances in the current domestic and foreign specifications.

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

Construction and Quality Control Example of Cold Weather Concreting in Field (현장에서의 한중콘크리트의 시공 및 품질관리 사례)

  • Park, Jong-Gun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.171-175
    • /
    • 2001
  • The quality control application of concrete are one of the most important problems to be considered in cold weather concreting. And, the construction is going on now Therefor, the major test variables are compressive strength of concrete, curing method and volume of air content. This shown to be possible to construction and quality control of cold weather concreting in field.

  • PDF

Field Compaction Characteristics of Domestic Bed Sediment as Levee Fill Material (제체재료로서 국내 하상토의 현장다짐특성)

  • Kim, Jin-Man;Kim, Kyung-Min;Choi, Bong-Hyuck;Lee, Dae-Yeong
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.10
    • /
    • pp.113-120
    • /
    • 2008
  • It is difficult to acquire good-quality fill material for levee in field and it is the most important factor of levee construction technology to use the bed sediment for the safe and economic construction. So, it is necessary to evaluate geotechnical characteristics of bed sediment, design and construction method through field application tests. In this study geotechnical characteristics of Hyunpoong bed sediment (SP) in Daegu were analyzed, and laboratory/field compaction test for mixing granite weathered soil (SW) was performed. And field mixing method was suggested.

A Study on the Characteristics of Propagation and Effects of Vibration by Sand Drain Method in Construction Field (건설현장에서의 Sand Drain 시공에 의한 진동특성과 영향에 관한 연구)

  • Kwak, Kwang-Soo;Kim, Jae-Soo
    • KIEAE Journal
    • /
    • v.1 no.2
    • /
    • pp.13-19
    • /
    • 2001
  • Recently, With the increase of income level, many people desire to have agreeable and quiet surrounding. However, the extent and time of the exposure to construction noise and vibration is increasing, which is a factor that ruins the quietness of the surrounding and increasingly raises interests in its effects. In this point, this study attempts to survey the characteristics of construction vibration by SD(Sand drain) method in construction field. In addition, the result of study is presumed to be usable as the fundamental materials for an efficient counter-plan in case of the public resentment in relations to the construction vibration occurring henceforth.

  • PDF

A Study on the Productivity of Form Work by using Work Analysis Method (작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구)

  • Jung, Hea-kyang;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work