• Title/Summary/Keyword: Fenton sludge

Search Result 23, Processing Time 0.024 seconds

A study on reduction of excess sludge in activated sludge system from a petrochemical plant using electro fenton process (전기펜톤공정을 이용한 석유화학공장 폐활성슬러지의 감량화 가능성 평가)

  • Chung, Chong Min;Kim, Kyung Il;Shim, Natalia;Park, Chul Hee;Lee, Sang Hyup
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.5
    • /
    • pp.669-678
    • /
    • 2009
  • The reduction of excess activated sludge from petrochemical plant was investigated by the electro fenton (E-Fenton) process using electrogenerated hydroxyl radicals which lead to mineralization of activated sludge to $CO_2$, water and inorganic ions. Factors affecting the disintegration efficiency of excess activated sludge in E-Fenton process were examined in terms of five criteria: pH, $H_2O_2/Fe^{2+}$ molar ratio, current density, initial MLSS (mixed liquid suspended solids) concentration, $H_2O_2$ feeding mode. TSS total suspended solid and $TCOD_{cr}$ reduction rate increased with the increasing $H_2O_2/Fe^{2+}$ molar ratio and current density until 42 and $6.7 mA/cm^2$, respectively but further increase of $H_2O_2/Fe^{2+}$ molar ratio and current density would reduce the reduction rate. On the other hand, as expected, increasing pH and initial MLSS concentration of activated sludge decreas TSS and $TCOD_{cr}$ reduction rate. The E-Fenton process was gradually increased during first 30 minutes and then linearly proceed till 120 minutes. The optimal E-Fenton condition showed TSS reduction rate of 62~63% and $TCOD_{cr}$ (total chemical oxygen demand) reduction rate of 55~56%. Molar ratio $H_2O_2/Fe^{2+} = 42$ was determined as optimal E-Fenton condition with initial $Fe^{2+}$ dose of 5.4 mM and current density of $6.7{\sim}13.3 mA/cm^2$, initial MLSS of 7,600 mg/L and pH 2 were chosen as the most efficient E-Fenton condition.

Study of optimal reduction plan for wastewater sludge generated from oil refinery (정유 공장에서 발생된 폐수 슬러지의 최적 감량화 방안 연구)

  • Choi, Jae-Woo;Jung, Jong-Min;Shim, Natalia;Lee, Sang-Hyup;Park, Cheol-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.4
    • /
    • pp.395-406
    • /
    • 2010
  • In this study, anaerobic digestion, electro-oxidation and electro-fenton oxidation processes were investigated to reduce oily refinery sludge. Anaerobic digestion process was not suitable for oily activated sludge reduction because of characteristics itself and, as experimental results revealed, reduction efficiency was low for electro-oxidation process. However, 40% total suspended solid reduction of oily activated sludge was obtained by electro-fenton oxidation process, operating at pH=1, 0.5 A and $Fe^{2+}$:$H_2O_2$ ratio = 1:30. In addition, higher reduction efficiency was obtained as reaction time was increased (30, 60, 90, 120 min) despite of low $H_2O_2$ concentration. From the results, it has been investigated that electro-fenton oxidation is efficient process for oily activated sludge reduction.

Methodology Development for the Reuse of Sludge Generated from Fenton's Oxidation Process (펜톤산화 공정에서 발생하는 슬러지의 재활용 방안)

  • Koo, Tai-Wan;Cho, Soon-Haing;Choi, Young-Soo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.6
    • /
    • pp.1083-1091
    • /
    • 2000
  • The objective of this study is to develop effective and economical treatment processes for the removal of non-biodegradable organics by reusing the sludge generated from Fenton's Oxidation Process. It was found that about 50% of coagulants and 50% of catalyst can be reduced by reusing the sludge generated from Fenton's Oxidation Process. It was also found that the amount of sludge generation can be reduced in coagulation process and Fenton's Oxidation Process. From the results of bench-scale test, it was found that the average removal efficiency increased to 8.5% and the amount of sludge generation was reduced up to 35% by reusing the sludge as coagulant. The average organic removal efficiency increased to 5.3% and the amount of sludge generation was reduced up to 14% by reusing the sludge as catalyst in Fenton's Oxidation. It can be concluded that the reuse of sludge generated from Fenton's Oxidation Process would be reduced cost of chemical consumption and Fenton's sludge treatment.

  • PDF

Organic Wastewater Treatment Using Modified Fenton's Oxidation (변형 펜턴산화법을 이용한 유기폐수의 처리)

  • Kim, Ji Yeon;Yoon, Tai Il;Park, Se Jin
    • Clean Technology
    • /
    • v.5 no.1
    • /
    • pp.49-61
    • /
    • 1999
  • Fenton's oxidation can improve the biodegradability of refractory organic wastewater by generating $OH{\cdot}$ which is one of the most reactive species. Fenton's reagent is used to treat a variety of industrial waste containing a range of toxic organic compounds. But this process cannot be economical because of high chemical cost of $H_2O_2$, ferrous ion solution and high sludge disposal cost. In this study, we proposed a modified Fenton's oxidation process which can reduce the reagent cost and obtain better removal efficiencies with less Fenton's reagents, and have a good potential of sludge recycling. In modified Fenton reaction, ferrous ion solution is adjusted to optimal pH with NaOH. Then it added to the sample and reacted to $H_2O_2$. For the experiment, synthetic wastewater made of phenol, which is one of the typical water pollutants, was used and the ionic strength of this wastewater was controlled by adding $NaHCO_3$. The effects of DO, ionic strength, and $H_2O_2$ dosing methods were investigated. As a result, modified Fenton's treatment efficiencies are better than conventional Fenton's reaction treating leachate and dyeing wastewater. And modified Fenton's treatment efficiencies combined to the sludge recycling for a half of Iron dosage are as good as the conventional Fenton's for a normal Iron dosage.

  • PDF

Reuse Technology Development and Economic Evaluation of Dyeing Wastewater Treatment Sludge (폐수처리슬러지의 재활용기술개발 및 경제성 평가 -B염색조합을 중심으로-)

  • 임재호;이정연
    • Resources Recycling
    • /
    • v.9 no.1
    • /
    • pp.36-43
    • /
    • 2000
  • This study was carried out for treatment and reuse of inorganic sludge from Fenton process at B dyeing wastewater treatment plant. The parameters for pilot-scale treatment system were derived from the results of this study. It was found that $COD_{cl}$ of the treated effluent became lower than 100 mg/l approximately on the optimal reaction condition. 2nd sludge which was generated after redissolving sludge was analyzed, and it showed that reduction ratio of ash in 2nd sludge and total dry sludge weight in comparison with current sludge were 85% and 65%. Also Fe salt in sludge was redissolved about 90~95% of initial Fe by weight. It was estimated almost ₩350,000,000 for sludge reuse process. It was estimated saving of about ₩1,300,000 per day (₩420,000,000 per year) in operating cost based on 30,000 $m^3$/d treatment, which these were about ₩430,000 per day in chemical, ₩1,100,000 per day in sludge transportation and ₩200,000 per day in equipment maintenance. Payback period with interest charge for investment cost was estimated about 10.5 months. Also, net present value (NPV) was ₩792,000,000 and internal rat of return (IRR) was about 110%.

  • PDF

Evaluation on the Biodegradability of the MBT Wastewater (MBT 폐수의 생분해성 평가)

  • Lim, Ji-Young;Park, Jung-hwan;Kim, Jin-Han
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.86-92
    • /
    • 2016
  • The possibility of the biological treatment of MBT wastewater generated from the vulcanization accelerator manufacturing process was investigated. MBT wastewater is not biodegradable because it hinders the activity of microorganisms, and approximately 10% of the total COD can be removed after a 7 day acclimation period. The optimal conditions of the MBT wastewater for the chemical pre-treatment was pH of 3.5 and the Fenton oxidation with the addition of $Fe^{3+}$ to the wastewater after agitation for 2 hours. The Fenton-treated MBT wastewater showed approximately 20% removal of COD when treated with the activated sludge process for the mixed paper wastewater and Fenton treated wastewater.

Effective Treatment System for the Leachate from a Small-Scale Municipal Waste Landfill (소규모 쓰레기 매립장 침출수의 효율적인 처리 방안에 관한 연구)

  • Cho Young-Ha;Kwon Jae Hyun
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.1
    • /
    • pp.51-65
    • /
    • 2002
  • This study was carried out to apply some basic physical and chemical treatment options including Fenton's oxidation, and to evaluate the performances and the characteristics of organic and nitrogen removal using lab-scale biological treatment system such as complete-mixing activated sludge and sequencing batch reactor(SBR) processes for the treatment of leachate from a municipal waste landfill in Gyeongnam province. The results were as follows: Chemical coagulation experiments using aluminium sulfate, ferrous sulfate and ferric chloride resulted in leachate CO $D_{Cr}$ removal of 32%, 23% and 21 % with optimum reaction dose ranges of 10,000~15,000 mg/$\ell$, 1,000 mg/$\ell$ and 500~2,000 mg/$\ell$, respectively. Fenton's oxidation required the optimum conditions including pH 3.5, 6 hours of reaction time, and hydrogen peroxide and ferrous sulfate concentrations of 2,000 ~ 3,000 mg/$\ell$ each with 1:1 weight ratio to remove more than 50% of COD in the leachate containing CO $D_{Cr}$ between 2,000 ~ 3,000 mg/$\ell$. Air-stripping achieved to remove more than 97% of N $H_3$-N in the leachate in spite of requiring high cost of chemicals and extensive stripping time, and, however, zeolite treatment removing 94% of N $H_3$-N showed high selectivity to N $H^{+}$ ion and much faster removal rate than air-stripping. The result from lab-scale experiment using a complete-mixing activated sludge process showed that biological treatability tended to increase more or less as HRT increased or F/M ratio decreased, and, however, COD removal efficiency was very poor by showing only 36% at HRT of 29 days. While COD removal was achieved more during Fenton's oxidation as compared to alum treatment for the landfill leachate, the ratio of BOD/COD after Fenton's oxidation considerably increased, and the consecutive activated sludge process significantly reduced organic strength to remove 50% of CO $D_{Cr}$ and 95% of BO $D_{5}$ . The SBR process was generally more capable of removing organics and nitrogen in the leachate than complete-mixing activated sludge process to achieve 74% removal of influent CO $D_{Cr}$ , 98% of BO $D_{5}$ and especially 99% of N $H_3$-N. However, organic removal rates of the SBR processes pre-treated with air-stripping and with zeolite were not much different with those without pre-treatment, and the SBR process treated with powdered activated carbon showed a little higher rate of CO $D_{Cr}$ removal than the process without any treatment. In conclusion, the biological treatment process using SBR proved to be the most applicable for the treatment of organic contents and nitrogen simultaneously and effectively in the landfill leachate.e.

The Reduction of Waterworks Sludge by Hydrogen Peroxide Treatment (과산화수소 산화처리에 의한 정수슬러지의 감량화)

  • Kwon, Jae-Hyun;Kim, Young-Do;Park, Ki-Young;Lee, Seock-Heon;Kim, II-Kyu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.1
    • /
    • pp.123-130
    • /
    • 2007
  • The effects of hydrogen peroxide treatment on the reduction of waterworks sludge were investigated in this study. Sludge treated by peroxidation $H_2O_2$ oxidation) was dewatered using a pressure filter at 3atm. It was observed that $H_2O_2$ treatment at the acidic condition significantly reduce both cake water content and specific resistance to filtration (SRF), indicating the enhancement of dewaterability and filterability. The filterability by hydrogen peroxide treatment at pH 3.5 was better than acidic treatment and became comparable with polymer conditioning. The sludge filterability evaluated by SRF was optimal at a dose 2ml $H_2O_2$/sludge($0.02g\;H_2O_2/gTS$) after adjusting of pH to 3.5. The $H_2O_2$ oxidation at pH 3.5 also produced even more dewatered cake when compared with polymer conditioning. The reduction rate of sludge mass at an optimal condition showed 34% compared with untreated sludge. The effects of peroxidation on sludge properties including zeta potential, bound water and particle size were also evaluated. Peroxidation at the acidic condition reduced both bound water and zeta potential. By $H_2O_2$ combined with sulfuric acid leached iron caused Fenton's reaction, which showed a potential to significantly reduce the amount of solids mass and to produce more compact cake with higher filterability.

Eveluation of Comparable Removal Efficiency of Organics and Color for the Dyeing Wastewater by Fenton Oxidation and Ozonation (펜톤산화와 오존산화 조합에 따른 염색폐수의 유기물질 및 색도 처리효율 비교 평가에 관한 연구)

  • Kim, Sun Hee;Lee, Sang Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.6
    • /
    • pp.778-784
    • /
    • 2004
  • Dyeing wastewater contains recalcitrant organics which can not be easily treated by conventional biological treatment. Therefore it has to be treated by other advanced oxidation process in order to remove COD and Color more efficiently. Fenton oxidation process is one of the most commonly applied processes in removal of COD and color for the dyeing wastewater. However it increase the treatment cost and the production of sludge by the use of the excessive chemical reagent. Ozonation is not suitable in Single treatment process because it is not effective in organics removal compared with Color removal. The purpose of this research in order to evaluate the comparable removal efficiency of COD and color by the combination of advanced oxidation processes for the dyeing wastewater. The sequential treatment processes of Fenton process and ozonation was more effective to remove organics and color than ozonation and Fenton process. The result of Fenton process for the pretreatment presented as the 81% removal of organics whereas ozonation process for the pretreatent presented as the 22.1% removal of organics. The removal of colour was higher as 81.3% for the ozonation as the pretreatment than 77.7% for the Fenton process as the pretreatment.

Optimal Condition of Operation Parameter for Livestock Wastewater Treatment using Photo-Fenton Process (PHOTO-FENTON 공정을 이용한 축산폐수처리시 운전인자의 최적조건)

  • Park, Jae-Hong;Chang, Soon-Woong;Cho, Il-Hyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.3
    • /
    • pp.284-288
    • /
    • 2005
  • In this study, photochemical advanced oxidation processes (AOPs) utilizing the Photo Fenton reaction ($Fe^{2+}+H_2O_2+UV$) were investigated in lab-scale experiments for the treatment of livestock wastewater. For the experimets, the livestock wastewater was pretreated by coagulation with $3,000mg/L\;FeCl_3$. The optimal conditions for Photo-Fenton processes were determined: pH was 5, the concentration of ferrous ion (Fe II) was 0.01 M. The concentration of hydrogen peroxide was 0.1 M, and molar ratio ($Fe^{2+}/H_2O_2$) was 0.1. The optimal reaction time was 80 min. Under the optimal condition of Photo-Fenton process, chemical oxygen demand (COD), color and fecal coliform removal efficiencies were about 79, 70, and 99.4%, respectively and sludge production was 7.5 mL from 100 mL of solution.