• 제목/요약/키워드: Feasibility analysis

검색결과 3,687건 처리시간 0.032초

공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 - (Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost -)

  • 김재문
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

지적재조사사업 예비타당성분석의 타당성 검토 - 경제성 분석을 중심으로 - (A Study on the Pre-feasibility study on the Cadastral Resurvey Project)

  • 신지윤;곽병용;김창기
    • 지적과 국토정보
    • /
    • 제44권1호
    • /
    • pp.61-78
    • /
    • 2014
  • 중국이 우리 영토인 '구려벌'을 그들의 영토로 만들기 위해 동북공정을 필두로 한 영토공정을 실시하고 있는 것에 대해, 중국 영토공정의 원인과 목적 및 실태를 분석하고 그에 대한 대응 방안을 제시함으로써 잃어버린 우리 영토를 수복하는 데 본연구의 목적이 있다. 이를 위해서 본 연구에서는 중국이 실시하는 영토공정에 대해 세부적으로 검토했다. 중국이 실시하는 영토공정인 동북공정과 단대공정, 탐원공정과 요하문명론은 물론 근대공정까지 실시하게 된 원인과 목적을 밝히고 그 내용을 점검하고 실태를 분석하여 문제점을 지적한 후 그에 대한 대응 방안을 제시했다. 중국은 영토공정을 실시하기 위해서 무엇보다 문화와 역사를 왜곡하였다. 따라서 본 연구에서도 문화와 역사적인 측면에서 중국이 주장하는 왜곡의 실태를 파악하고 그 모순을 짚어서 맞대응하는 방법을 택함으로써 차별성을 가졌다. 아울러 본 연구에서는 중국의 역사와 문화 왜곡은 물론 우리 스스로 중국이 주장하는 것들을 각기 딴 생각으로 해석하는 잘못을 지적하였다. 또 우리 영토를 지키는데 정부의 적극적인 대응이 매우 중요하다는 점을 강조하였다.

공공사업 타당성 평가의 개선 방안에 관한 연구 (A Study on Improvement of Feasibility Evaluation for Public Projects)

  • 박승준
    • 한국융합학회논문지
    • /
    • 제8권2호
    • /
    • pp.163-168
    • /
    • 2017
  • 기존의 공공사업 타당성 평가는 경제성분석을 위주로 추진되었으나, 계층분석법(AHP: Analytic Hierarchy Process)을 도입하면서 정책성, 지역균형발전, 기술성 등의 항목이 추가로 평가되고 있다. 이 연구는 최근 3년간 건설사업과 연구개발사업의 예비타당성조사 데이터를 분석하고, 비용편익비(Cost-Benefit Ratio)와 계층분석의 가중치(weight) 간의 상관관계 분석을 통해 상호 관련성을 검증하고자 한다. 연구결과 비용편익비와 AHP 가중치의 상관관계가 건설사업의 경우 0.744, 연구개발사업의 경우 0.899로 나타났다. 즉, 사업시행 여부를 결정하는 AHP 결과가 비용편익분석 결과에 의해 크게 좌우됨으로, 경제성 위주의 평가를 보완하기 위해 도입된 AHP가 당초 기대와는 달리 종합적 분석의 역할을 충분히 수행하지 못하고 있다. 따라서 AHP 분석의 효과를 극대화 할 수 있는 다양한 연구설계가 지속적으로 논의될 필요가 있다.

어린이도서관 건립의 경제적 타당성 분석 - C혁신도시 사례를 중심으로 - (The Economic Feasibility Analysis of A Children's Library Construction: The Case of C Innovation City)

  • 장덕현;구본진
    • 한국문헌정보학회지
    • /
    • 제52권2호
    • /
    • pp.125-142
    • /
    • 2018
  • 최근 지역에 건립되고 있는 혁신도시에는 대체로 인구 중 고학력의 젊은 주민들이 많고 어린이 비율이 높아 어린이도서관에 대한 요구가 높다. 이러한 상황에서 이 연구에서는 최근 인구유입이 증가하고 있는 지역 혁신도시내에 어린이도서관 건립의 실현가능성을 검토하기 위해 C 혁신도시를 사례로 어린이도서관 건립의 경제적 타당성을 분석하였다. 이를 위해 지역 주민들을 대상으로 설문조사를 실시한 후 C 혁신도시 내 어린이도서관 건립의 비용편익분석을 실시하였다. 이어서 도서관 건립에 소요되는 비용을 추정하고, 도서관 건립으로 인한 편익을 산출한 후 편익비용비율, 순현재가치, 내부수익률을 계산하여 경제적 타당성을 분석하였다. 그 결과, 편익비용비율, 순현재가치, 내부수익율 등의 판단기준을 근거로 혁신도시 어린이도서관 건립은 경제적 타당성을 확보한 것으로 나타났다.

저소음·분진회수형 도로절단기 개발의 타당성 분석 (A Feasibility Analysis of a Low Noise and Dust Suction Type Pavement Cutter)

  • 김균태
    • Ecology and Resilient Infrastructure
    • /
    • 제7권4호
    • /
    • pp.274-283
    • /
    • 2020
  • 도로포장 절단 작업에서 미세먼지를 많이 발생시키고 있어, 이 작업에서 미세먼지 발생량을 줄이는 것이 전체 미세먼지 관리에 매우 중요하다. 이러한 점에 착안하여, 본 연구에서는 도로절단 현장에서 발생하는 비산먼지를 회수하는 장치의 개념설계를 제안하고, 이의 도입에 대한 경제적 타당성을 분석하였다. 제안된 개념모델의 경제성을 분석한 결과, 편익비율이 2.96으로 1을 크게 상회하였다. 그리고 수익률은 62.78%로 도로포장 절단 실무자 면담을 통해 설정한 최소기대수익률 10%를 크게 상회하였으며, 손익분기점은 약 21.6개월로 분석되었다. 따라서 제안된 저소음·분진회수형 도로절단 장비의 경제적 타당성은 충분할 것으로 예상된다.

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제24권3호
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

동적 이용률을 고려한 수소충전소 사업의 경제성 분석 (An Economic Analysis of the Hydrogen Station Enterprise Considering Dynamic Utilization)

  • 김봉진
    • 한국수소및신에너지학회논문집
    • /
    • 제28권1호
    • /
    • pp.47-55
    • /
    • 2017
  • This paper deals with the after-tax economic feasibility analysis of the hydrogen fueling station considering dynamic utilization. We selected an off-site hydrogen station in which the hydrogen is supplied by a central by-product hydrogen plant as a case study. Also, we made some sensitivity analysis by changing input factors such as the discount rate, the hydrogen station construction cost, the hydrogen demand and the hydrogen sale price. As a result, the hydrogen station will not be economical in 2020 due to the relatively high price of the hydrogen station construction cost and the low price of hydrogen sale price. In order to realize the economic feasibility of the hydrogen station in the early stage of the hydrogen economy, the subsidies on the annual operating cost as well as the construction cost are needed.

제주-해남 HVDC 시스템에 STASTCOM 적용 타당성 분석 (Feasibility Analysis of STATCOM Application for Jeiu-Haenam HVDC System)

  • 백승택;추원교;한병문;장길수
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권8호
    • /
    • pp.401-409
    • /
    • 2005
  • This paper describes a feasibility analysis result of STATCOM application for the Jeju-Haenam HVDC system. The Jeju-Haenam HVDC system is one of the typical HVDC system interconnected with the low short-circuit-ratio AC system, which is vulnerable to the commutation failure due to the AC voltage variation. STATCOM has been considered as an effective reactive-power compensator to increase short-circuit-ratio of the interconnected AC system. In this study, a simulation model of Jeju-Hacnam HVDC system with STATCOM was developed using PSCAD/EMTDC. The developed simulation model was utilized to analyze the dynamic performance analysis of Jeju-Haenam HVDC system with STATCOM. The analysis results show that STATCOM can improve the dynamic performance of Jeju-Haenam HVDC system, such as load-change recovery performance and fault recovery performance.

제주-해남 HVDC 시스템에 STATCOM 적용 타당성 분석 (Feasibility Analysis of STATCOM Application for Jeju-Haenam HVDC System)

  • 백승택;한병문;장길수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.60-62
    • /
    • 2005
  • This paper describes a feasibility analysis result of STATCOM application for the Jeiu-Haenam HVDC system. The Jeju-Haenam HVDC system is one of the typical HVDC system interconnected with the low short-circuit-ratio AC system, which is vulnerable to the commutation failure due to the AC voltage variation. STATCOM has been considered as an effective reactive-power compensator to increase short-circuit-ratio of the interconnected AC system. In this study, a simulation model of Jeju-Haenam HVDC system with STATCOM was developed using PSCAD/EMTDC. The developed simulation model was utilized to analyze the dynamic performance analysis of Jeju-Haenam HVDC system with STATCOM. The analysis results show that STATCOM can improve the dynamic performance of Jeju-Haenam HVDC system, such as load-change recovery performance and fault recovery performance.

  • PDF

서부아프리카 국가간 연계 송전망 타당성 조사 (Feasibility Study for the Ghana-Mali 225kV Interconnection Project)

  • 김종화;이철휴;이영길;최상주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.38-39
    • /
    • 2008
  • KEPCO conducted the project called the "Feasibility Study for the Han (Ghana) - Bobo Dioulasso (Burkina Faso) - Bamako (Mali) Interconnection Project" as its first African project. This paper deals with power system analysis and Transmission line and substation design of approximately 750 kilometers of the 225 kV single circuit transmission lines and six substations. The main contents of the power system analysis results and preliminary engineering design include power flow, transient stability, eigenvalue analysis, transmission line design, substation design and economic analysis.

  • PDF