• Title/Summary/Keyword: Falling rate

Search Result 365, Processing Time 0.024 seconds

A Study on Article 78 CISG: Interest on Sums in Arrears (CISG 제78조(연체이자(延滯利子) 청구권(請求權))에 대한 고찰(考察))

  • Kim, Tae-Gyeong
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.31
    • /
    • pp.3-25
    • /
    • 2006
  • This study focus on interest for arrears and filling of the gaps left in Article 78 of CISG. In the case of CISG, Article 78 provides for interest any time a payment under a contract is untimely, but does not specify a particular rate of interest or a method to determine such a rate. This issue did not cause any uncertainty under ULIS, the CISG's antecedent, since Article 83 of ULIS provided for 1%p above the official discount rate in the creditor's country. Lacking any CISG general principle as well as any indication by the very same CISG, one can only conclude that the matter must be deferred to the domestic rule of private international law. Actually, resorting to private international law is not only admissible, but expressly required by Article 7(2). In the interpretation and filling of the gaps left in Article 78, there is a considerable difference of opinion especially amongst commentators on whether the gap is a lacuna praeter legem, i.e., one being governed by, but not expressly settled in the CISG, or whether it is an issue falling outside the scope of application of the CISG, i.e. a lacuna intra legem. The protagonists of the former view lay emphasis on the overall objective of the CISG, namely to create a uniform law, whereas the supporters of the latter view refer to the legislative history of Article 78 as the dominant principle in interpreting Article 78. Some authors believe that the issue of determining the rate of interest is not dealt with by CISG and it is, therefore, governed by the applicable domestic law, which is the subsidiary law applicable to the sales contract, since "no special connecting points seem to have developed for the entitlement to interest." In the light of the relevant case law, it seems correct to conclude that the interest rate is not determined by CISG and that courts normally determine it according to their own rules of private international law. While CISG Article 78 expressly does not deal with this issue, PICC Article 7.4.9 and PECL Article 9.508, on the other hand, set forth a precise method for computing interest. Although a method like the one set by PICC may be useful and may encourage uniformity, it still cannot be used under the CISG. The PICC or PECL formula may, however, be a very good starting point in a de jure condendum analysis when a new Article 78 will be drafted, if an interest rate method will ever be embodied in the text of an international convention.

  • PDF

A Study on Industrial Accidents of Workers in Jeonbug Areas (전북지역(全北地域) 산업근로자(産業勤勞者)의 산업재해(産業災害)에 관(關)한 조사연구(調査硏究))

  • Hwang, In-Dam;Park, Young-Soo;Suh, Suk-Kwon
    • Journal of Preventive Medicine and Public Health
    • /
    • v.14 no.1
    • /
    • pp.89-96
    • /
    • 1981
  • Of 2,740 industries in Jeonbug area which are covered by industrial insurance policy, 462 facilities which the accidents related to industry occured during the year of 1979 were studied. and the results are summarized as follows: 1. The accidents related to industry occured in 462 industries of the total 2,740 industrial facilities in Jeonbug area as of 1979. 2. The incidence rate of accident per 1,000 workers was 34.3 (49.2 in male workers and 12.8 in female workers), the frequency rate of the total industries in jeonbug area was 13.36, and severity rate was 1.3. 3. The frequency rates and severity rates by type of industry in study area were quite different to compare with those of national rates. 4. The incidence rate of construction industry was 223.6 per 1,000 workers, and that of transportation-communication industries were 78.6. 5. The proportion of industrial accidents of $20{\sim}24$ age group was 22.1 per cent of the total accidents, and the proportions decreased according to age increase. 6. The incidence rate in the industry having less than 49 workers was 20.6 per 1,000 workers, that of industry with $50{\sim]99$ workers was 26.7, that of industry with $100{\sim}199$ was 51.9, that of industry with $200{\sim}499$ was 80.2 and that of with more than 500 worker was 40.7. 7. The accidents which occured in the workers with experience of less than one year was 69.4 per cent of the total accidents, otherwise, the longer the workers have worked the less accident they have. 8. The most accidents occured in tile shift between 10 to 12 o'clock, and 16 to 18 hour 9. The primary causes of the industrial accidents were found to be collisions, machinery falling objects and falls. 10. The site of injury by type of industry were quite different, and the major site of injury was finger. 11. The laceration and open injuries of the accidents related to industry were 37.2 per cent of the total cases, and fractures or dislocations were 23.5 per cent, and contusions were 6.5 per cent. 12. Death rate of industrial accident was 5.0 per 10,000 workers, and those of industry were 47.6 in transportation, 42.8 in construction industry, 24.4 in mine industry, and 2.0 in manufacturing industry.

  • PDF

Development of penetration rate prediction model using shield TBM excavation data (쉴드 TBM 현장 굴진데이터를 이용한 굴착속도 예측모델 개발)

  • La, You-Sung;Kim, Myung-In;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.519-534
    • /
    • 2019
  • Mechanized tunneling methods, including shield TBM, have been increasingly used for tunnel construction because of their relatively low vibration and noise levels as well as low risk of rock-falling accidents. In the excavation using the shield TBM, it is important to design penetration rate appropriately. In present study, both subsurface investigation data and shield TBM excavation data, produced for and during ${\bigcirc}{\bigcirc}{\sim}{\bigcirc}{\bigcirc}$ high-speed railway construction, were analyzed and used to compare with shield TBM penetration rates calculated using existing penetrating rate prediction models proposed by several foreign researchers. The correlation between thrust force per disk cutter and uniaxial compressive strength was also examined and, based on the correlation analysis, a simple prediction model for penetration rate was derived. The prediction results using the existing prediction models showed approximately error rates of 50~500%, whereas the results from the simple model proposed from this study showed an error rate of 15% in average. It may be said, therefore, that the proposed model has higher applicability for shield TBM construction in similar ground conditions.

Identification of Defect Type by Analysis of a Single PD Pulse in Gas Insulated Structure (가스절연 구조에서 단일 부분방전펄스 분석에 의한 결함 판별)

  • Jo, Hyang-Eun;Kim, Sun-Jae;Jeong, Gi-Woo;Kil, Gyung-Suk
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.28 no.5
    • /
    • pp.320-325
    • /
    • 2015
  • This paper dealt with a defect identification algorithm which is based on single partial discharge (PD) pulse analysis in gas insulated structure. Four types of electrode systems such as a needle-plane, a plane-needle, a free particle and a crack inside spacer were fabricated to simulate defects in gas insulated switchgear (GIS). We measured single PD pulse by an oscilloscope with a sampling rate of 5 GS/s and a frequency bandwidth of 1 GHz. Data aquisition and signal processing were controlled by a LabVIEW program. Physical shapes of PD pulses were compared with kurtosis, skewness and time-based parameters as rising time, falling time and pulse-width. These parameters were analysed by an algorithm with a back propagation algorithm (BPA). By applying the algorithm, the identification rate was 97% for the needle-plane electrode, 96% for the plane-needle electrode, 91% for the free particle and 93% for the crack inside spacer. The results verified that the algorithm could identify the type of defects in GIS.

Bipolar Integrated Optical Link Receiver with Low Supply Voltage (바이폴라 집적된 저전압구동 광연결 수신기)

  • 장지근;이상열
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.10 no.4
    • /
    • pp.9-14
    • /
    • 2003
  • The new optical link receiver with data transfer rate higher than 10Mbps at the supply voltage of 1.8V was designed and fabricated using bipolar technology. The fabricated IC showed the dissipation current of 4.6mA under high level input voltage of 1.5V. The high level output voltage($V_{OH}$) and the low level output voltage($V_{OL}$) were 1.15V and 0V, respectively, for a given 10 Mbps signal which has duty ratio of 50%, $V_{IL}$(low level input voltage) of 0.5V, and $V_{IH}$(high level input voltage) of 1.5V, The duty ratio of output waveform was 52.6%. The rising time(t$_{r}$) and the falling time(t$_{f}$) were 9.5ns and 6.8ns, respectively. The propagation delay difference($t_{PHC}-t_{PLH}$) and the jitter($t_j$) were 11.7ns and 4.3ns, respectively.y.

  • PDF

Characteristics of Fall Events and Fall Risk Factors among Inpatients in General Hospitals in Korea (입원 환자의 낙상실태 및 위험요인 조사연구: 국내 500병상 이상 종합병원을 중심으로)

  • Choi, Eun Hee;Ko, Mi Suk;Yoo, Cheong Suk;Kim, Mi Kyoung
    • Journal of Korean Clinical Nursing Research
    • /
    • v.23 no.3
    • /
    • pp.350-360
    • /
    • 2017
  • Purpose: The purpose of this study was to investigate the present status of falls among inpatients in general hospitals and to identify the fall risk factors that reflect the characteristics of domestic hospitals. Methods: Data were collected between December 15, 2016 and January 15, 2017 from 32 Korean hospitals having 500 or more beds. First, 42 risk factors were extracted based on literature review and expert opinions. Then the importance of each factor was evaluated by 223 nurses from medical and surgical adult ward and intensive care units in 40 hospitals. Results: The incidence rate of falls in 18 hospitals was 3.87 per 1,000 total discharged patients and 0.55 per 1,000 patient-days, and the rate of injury-related falls was 40.5%. Major risk factors for falling were identified as the following: being over 65 years of age, history of falls during admission, physical mobility disorders requiring assistance, physical factors (dizziness or vertigo, unstable gait, general weakness, walking aids, visual problems), cognitive factors (delirium, lack of understanding on limitations), neurological disease, CNS medications Conclusion: The findings provide information that can be in the development of a fall risk assessment tool for inpatients in general hospitals in Korea.

Experimental Study on Reduced Amount of Rebound in Wet Process Shotcrete Works by Upon Accelerator Contents (급결제 함유량에 따른 습식 Shotcrete 리바운드 감소량에 대한 실험적 연구)

  • Jeon, Jun Tai;Park, Hong Tae;Lee, Yang Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.615-622
    • /
    • 2012
  • The aim of shotcrete is to increase the bearing capacity and to protect the excavated surface from erosion by preventing falling of rock mass. Shotcreting method is divided into two types as dry process and wet process. Since 1997, wet process method has been used more frequently than dry process method in field works. The failure to bond, so called rebound, occurs in many case during shotcrete works. The excess amount of rebound has a significant effect on the total construction cost. For example, material and craft-man cost increases, the shooting time delays due to deceleration of work execution stage, work efficiency of craft-man decreases and additional cost to remove the muck generates. In this study, therefore, the experimental analysis of rebound amount and strength was conducted by analyzing the actual construction data for wet process type of shotcreting method upon accelerator contents. Also, the effective and rational method was suggested, which can be actually implemented in the Korea construction sites.

Comparison of Postural Sway in the Elderly Males and Females during Quiet Standing and Squat-and-Stand Movement (정적 서기와 쪼그려 앉았다 서기 동작에서 고령자남녀의 자세 동요 비교)

  • Kim, Ji-Won;Kim, Da-Hye;Moon, Ki-Wook;Eam, Gwang-Moon;Nam, Jung-Sook;Kim, Yo-Han;Hong, Jeong-Hwa;Park, Bung-Kyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.11
    • /
    • pp.2131-2137
    • /
    • 2008
  • In this paper, COP (center of pressure) during quiet standing and squat-and-stand movement was analyzed to compare the postural control of young and elderly subjects with special interest in the elderly females who were reported to have higher fall rate than the elderly males. Subjects include the young subjects (10 males: $21.8{\pm}2.6yrs$, 10 females: $20.4{\pm}0.3yrs$) and the elderly subjects (8 males: $75.5{\pm}4yrs$, 8 females: $72.3{\pm}3.5yrs$). Analysis parameters were the mean of the distance between the instantaneous COP and the average COP (COP distance) and the mean of the COP movement velocity (COP velocity) in both AP (anterio-posterior) and ML (media-lateral) directions. During quiet standing, the COP distance in ML direction of elderly females was significantly greater than that of elderly males and the COP velocity of elderly females in both ML and AP direction were significantly greater than those of all the other groups. During squat and stand movement, the COP distance of elderly females was not significantly different with that of the elderly males. However, the COP velocity of elderly females was significantly greater than that of all the other groups. The large lateral weight shift (COP distance) of elderly females during quiet standing may explain their greater fall rate. However, this does not apply to squat-and stand movement. In contrast, COP velocity results show that the elderly females' COP is rapidly trembling compared to that of elderly males during both quiet standing and squat and-stand movement. This results suggest that rapid trembling or postural sway may reflect the reduced postural control ability and the risk of falling.

Level of Safety Awareness of Construction Workers (건설현장 작업자의 내면적 안전의식 수준)

  • Lee, Wang Gi;Park, Seong Yong;Son, Ki Sang
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.3
    • /
    • pp.48-53
    • /
    • 2017
  • Many construction accidents can be lead to a death occurring at construction sites. These are considerably due to potentially-hazardous equipment and machine or unexpected collapsion at earth work due to land slide and so on. Almost 50% of the total death and injury, occurred in construction sites in 2015. 66% of those serious accidents are due to falling occurring from construction sites when they work. Therefore, causes and recommendations of each accident should be deeply thought and analysed The indirect causes are directly related to safe consciousness of the construction workers. Actually, their safety consciousness are not high, even very low, it is thought. Questionnaire survey sheets have been distributed to Seoul, Incheon, and Gyunggi-Do area, first. And then, the authors have collected those directly at sites, in order to increase collection rate of the sheets. The totally, collected sheets are 295 sheets. And, they are analysed using SPSS version 19 package program. Workers internal consciousness has been investigated and reviewed and analysed by statistical method such as frequency rate, crossed, and correlated analysis. And finally the conclusions for the above analyses are as follows; Heavy weight worth a crew of more than two workers should be necessarily considered for the advanced safety plan and needed for making a highly potential hazard group at construction sites. Safety consciousness, earing p.p.e, workman ship should be mainly considered for investing safety costs with an aspect of human factor.

Sensitivity Analysis and Optimization of Design Variables Related to an Algorithm for Loss of Balance Detection (균형상살 검출 알고리즘에서 검출과 관련된 설계변수의 민감도 해석 몇 최적화)

  • Ko, B.K.;Kim, K.H.;Son, K.
    • Journal of Biomedical Engineering Research
    • /
    • v.32 no.1
    • /
    • pp.7-14
    • /
    • 2011
  • This study suggested an optimized algorithm for detecting the loss of balance(LOB) in the seated position. And the sensitivity analysis was performed in order to identify the role of each design variable in the algorithm. The LOB algorithm consisted of data processing of measured signals, an internal model of the central nervous system and a control error anomaly(CEA) detector. This study optimized design variables of a CEA detector to obtain improved values of the success rate(SR) of detecting the LOB and the margin time(MT) provided for preventing the falling. Nine healthy adult volunteers were involved in the experiments. All the subjects were asked to balance their body in a predescribed seated posture with the rear legs of a four-legged wooden chair. The ground reaction force from the right leg was measured from the force plate while the accelerations of the chair and the head were measured from a couple of piezoelectric accelerometers. The measured data were processed to predict the LOB using a detection algorithm. Variables S2, h2 and hd are related to the detector: S2 represents a data selecting window, h2 a time shift and hd an operating period of the LOB detection algorithm. S2 was varied from 0.1 to 10 sec with an increment of 0.1 sec, and both h2 and hd were varied from 0.01 to 1.0 sec with an increment of 0.01 sec. It was found that the SR and MT were increased by up to 9.7% and 0.497 sec comparing with the previously published case when the values of S2, h2 and hd were set to 4.5, 0.3 and 0.2 sec, respectively. Also the results of sensitivity analysis showed that S2 and h2 had considerable influence on the SR while these variables were not so sensitive to the MT.