• Title/Summary/Keyword: Failure factor

Search Result 2,027, Processing Time 0.025 seconds

Comparison Analyses of Implementing 6 Sigma Management between China and Korea Companies: Korea side

  • Ree, Sang-Bok;Ma, Yizhong
    • International Journal of Quality Innovation
    • /
    • v.9 no.2
    • /
    • pp.119-127
    • /
    • 2008
  • In this paper, we survey Six Sigma in Korea company real fields. Six Sigma itself are developed depend on each company culture and strategy. Our country has been more than 10 years since introduced Six Sigma in our country. Each company which work six Sigma are developed differ way depending on his company situation. Our country Six Sigma in our country is necessary to survey and analysis. Firstly, we survey how to use Six Sigma. Next, we survey to find success factor and failure factor by reports published by company and papers by published in journals.

Probabilistic Safety Assessment of Nuclear Power Plants Using Alpha Factor Method for Common Cause Failure (알파모수 공통원인고장 평가 기법을 활용한 원자력발전소 안전성 평가)

  • Hwang, Seok-Won
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.51-55
    • /
    • 2014
  • Based on the results of Probabilistic Safety Assessment(PSA) for a Nuclear Power Plant (NPP), Common Cause Failure(CCF) events have been recognized as one of the main contributors to the risk. Also, the CCF data and estimation method used in domestic PSA models have been pointed out as an issue with respect to the quality. The existing method of MGL and non-staggered testing even widely used were considered conservative in estimating the safety and had a limited capability in uncertainty analyses. Therefore, this paper presents the CCF estimation using a new generic data source and Alpha factor method. The analyses showed that Alpha factor and staggered method are effective in estimating the CCF contribution and risk insights of reference plant. This method will be a common bases for the optimization of new design for the construction plants as well as for the updating of safety assessment on the operating nuclear power plants.

Optimal Preventive Maintenance Policy with Cost-dependent Improvement Factor (비용 종속적인 개선지수를 고려한 최적 예방보전 정책)

  • Hong, Seok-Soo;Park, Jong-Hun;Lie, Chang-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.2
    • /
    • pp.108-116
    • /
    • 2010
  • The maintenance of a deteriorating system is often imperfect. Previous studies have shown that the imperfect preventive maintenance (PM) can reduce the wear out and aging effects of deteriorating systems to a certain level between the conditions of as good as new and as bad as old. In this paper, we employ the concept of the improvement factor in investigating two optimal PM policies; failure limit policy and periodic PM policy. We redefine the improvement factor model as a function of the cost of PM, using this concept, we derive the conditions of optimal PM policies and formulate expressions to compute the expected cost rate. Based on this information, the determination of the maintenance policies which minimize the cost rate is examined. Numerical examples for the Weibull distribution case are also given.

Development of limit equilibrium method as optimization in slope stability analysis

  • Mendjel, D.;Messast, S.
    • Structural Engineering and Mechanics
    • /
    • v.41 no.3
    • /
    • pp.339-348
    • /
    • 2012
  • The slope stability analysis is usually done using the methods of calculation to rupture. The problem lies in determining the critical failure surface and the corresponding factor of safety (FOS). To evaluate the slope stability by a method of limit equilibrium, there are linear and nonlinear methods. The linear methods are direct methods of calculation of FOS but nonlinear methods require an iterative process. The nonlinear simplified Bishop method's is popular because it can quickly calculate FOS for different slopes. This paper concerns the use of inverse analysis by genetic algorithm (GA) to find out the factor of safety for the slopes using the Bishop simplified method. The analysis is formulated to solve the nonlinear equilibrium equation and find the critical failure surface and the corresponding safety factor. The results obtained by this approach compared with those available in literature illustrate the effectiveness of this inverse method.

Study on slope stability of waste dump with a weak layer using finite element limit analysis method

  • Chong Chen;Huayong Lv;Jianjian Zhao;Zhanbo Cheng;Huaiyuan Wang;Gao Xu
    • Structural Engineering and Mechanics
    • /
    • v.89 no.3
    • /
    • pp.253-263
    • /
    • 2024
  • Slope stability is generally paid more attention to in slope protection works, especially for slope containing weak layers. Two indexes of safety factor and failure model are selected to perform slope stability. Moreover, the finite element limit analysis method comprehensively combines the advantage of the limit analysis method and the finite element method obtaining the upper and lower bounds of the safety factor and the failure mode under the slope stability limit state. In this study, taking a waste dump containing a weak layer as an engineering background, the finite element limit analysis method is adopted to explore the potential failure mode. Meanwhile, the sensitivity analysis of slope stability is performed on geometrical and geotechnical parameters of the waste dump. The results show that the failure mode of the waste dump slope is two wedges if the weak layer is located on the ground surface (Model A), while the slope can be observed as three wedges failure if the weak layer is below the ground surface (Model B). In addition, both failure modes are highly sensitive to the friction angle of the weak layer and the shear strength of waste disposal, and moderately sensitive to the heap height, the dip angle and cohesion of the weak layer, while the toe cutting has limited effect on the slope stability. Moreover, the sensitivity to the excavation of the ground depends on the location of the weak layer and failure mode.

Evaluation Methodology of System Interruption Cost Taking into Consideration Failure Rate of Distribution Facilities (배전기자재별 고장확률을 고려한 배편계통 수용가 정전비용 산출 기법)

  • Choe, Sang-Bong;Kim, Dae-Gyeong;Jeong, Seong-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.5
    • /
    • pp.232-237
    • /
    • 2002
  • It is increased for methodology to evaluate distribution power system interruption cost in power supply zones under competitive electricity market. This paper presents algorithms to evaluate system interruption cost in distribution power supply zones taking into consideration failure rate of distribution facilities and composite customer interruption cost. In this paper, it is introduced for weighting factor for each customer failure duration and failure rate of distribution facilities to evaluate reasonable system interruption cost in distribution power supply area. Also, this Paper estimates evaluation results of system interruption cost using a sample model system. Finally, evaluation results of system interruption cost based on failure rate of distribution facilities and composite customer interruption cost are shown in detail.

Reliability analysis of wind-excited structures using domain decomposition method and line sampling

  • Katafygiotis, L.S.;Wang, Jia
    • Structural Engineering and Mechanics
    • /
    • v.32 no.1
    • /
    • pp.37-53
    • /
    • 2009
  • In this paper the problem of calculating the probability that the responses of a wind-excited structure exceed specified thresholds within a given time interval is considered. The failure domain of the problem can be expressed as a union of elementary failure domains whose boundaries are of quadratic form. The Domain Decomposition Method (DDM) is employed, after being appropriately extended, to solve this problem. The probability estimate of the overall failure domain is given by the sum of the probabilities of the elementary failure domains multiplied by a reduction factor accounting for the overlapping degree of the different elementary failure domains. The DDM is extended with the help of Line Sampling (LS), from its original presentation where the boundary of the elementary failure domains are of linear form, to the current case involving quadratic elementary failure domains. An example involving an along-wind excited steel building shows the accuracy and efficiency of the proposed methodology as compared with that obtained using standard Monte Carlo simulations (MCS).

Nonlinear first ply failure analysis of composite skewed hypar shells using FEM

  • Ghosh, Arghya;Chakravorty, Dipankar
    • Structural Engineering and Mechanics
    • /
    • v.68 no.1
    • /
    • pp.81-94
    • /
    • 2018
  • This paper uses the finite element method (FEM) considering geometrically nonlinear strains to study the first ply failure of laminated composite skewed hypar shell roofs through well-established failure criteria along with the serviceability criterion of deflection. Apart from validating the approach through solution of benchmark problems, skewed hypars with different practical parametric variations are studied for failure loads and tendencies. First ply failure zones are also identified to suggest design and non-destructive monitoring guidelines to the practising engineers. Recommendation tables regarding the design approaches to be adopted in specific cases and factor of safety values needed to be imposed on first ply failure load values for varying shell curvatures are also suggested in this paper. Providing practical inputs to design engineers is the main achievement of the present study.

The Novel Concepts for Reliability Technology

  • Ryu, DongSu
    • Corrosion Science and Technology
    • /
    • v.4 no.5
    • /
    • pp.201-206
    • /
    • 2005
  • Starting with the meaning of the word quality, diverse concepts connoted by the term are examined. Instead of a bathtub curve, the desirable shape of a failure rate covering the entire life of a good product, which might be called hockey-stick line, is introduced. From the hockey-stick line and the definition of reliability, two measurements are extracted. The terms r-reliability (failure rate) and durability (product life) are explained. The conceptual analysis of failure mechanics explains that reliability technology pertains to design area. The desirable shape of hazard rate curve of electronic items, hockey-stick line, clarifies that Mean-Time-to-failure (MTTF) as the inverse of failure rate can be regarded a nominal life. And Bx life, different from MTTF, is explained. Reliability relationships between components and set products are explained. Reshaped definitions of r-reliability and durability are recommended. The procedure to improve reliability and the reasons for failing to identify failure mode are clarified in order to search right solutions. And generalized Life-Stress failure model is recommended for the calculation of acceleration factor.

Risk Assessment Program of underground buried Pipeline Development (지하매설배관의 위험성평가 프로그램 개발)

  • Kim Tae Wook;Sung Jun Sik;Cho Yong Hyun
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.2 s.10
    • /
    • pp.37-45
    • /
    • 2000
  • The underground buried pipelines of Natural gas are relatively safer than any other pipelines of chemical plants, because Natural gas is non-corrosive fluid. But Natural gas is supplied normally the downtown area. So, it may be a disaster because of corrosion which is caused interference facilities, environment and third party accident which is caused facilities construction. Especially, it is very difficult to find out and inspect damages of pipeline because of buried pipelines. Therefore this paper approached to select and manage risk region pipelines according to introduction of underground buried pipeline's risk concept. Risk was indicated three parts - corrosion factor, design and construction factor, maintence and management factor - in this paper, Therefore qualitive risk of pipelines showed score as quantitative number. Also it was thought to be helpful in confidence and safety management that the concept of key index and failure supplementation measures to cost introduces this program. We developed this risk assessment program using visual basic tool and interfaced GIS.

  • PDF