• 제목/요약/키워드: Facility Location Planning

검색결과 112건 처리시간 0.024초

공급사슬에서 실제 시설물 운영시간을 고려한 시설배치계획에 관한 연구 (Facility Location Planning with Realistic Operation Times in Supply Chain)

  • 이상헌;김숙한
    • 한국경영과학회지
    • /
    • 제30권2호
    • /
    • pp.143-156
    • /
    • 2005
  • Facility location planning (FLP) problem is the strategic level planning in supply chain. The FLP is significantly affected by the operation time of each facility. In most of the FLP researches, operation time of facility has been treated as a fixed value. However, the operation time is not a static factor in real situations and the fixed operation time may lead unrealistic FLP. In this paper, a mixed integer programming (MIP) model is proposed for solving the 3-stage FLP problem and operation times are adjusted by the results from the simulation model and an iterative approach combining the analytic model and simulation model is proposed to obtain more realistic operation plans for FLP problems.

해양치유시설 계획기준에 관한 연구 (A Study on the Planning Criteria for Thalassotherapy Facility)

  • 이한석;강영훈;성해민
    • 한국항해항만학회지
    • /
    • 제44권1호
    • /
    • pp.20-31
    • /
    • 2020
  • 본 연구는 해양치유시설의 계획기준을 마련하는 연구로서 해양치유시설의 주요 계획항목인 입지선정, 환경계획, 공간계획을 대상으로 한다. 이를 위해 먼저 해양치유시설 특성을 살펴보고 해양치유시설계획의 기초가 되는 치유자원과 치유요법을 조사하며 해양치유시설 관련 해외기준을 분석한다. 이상의 결과를 바탕으로 해양치유시설의 입지선정, 환경계획, 공간계획을 위한 기준을 제시한다. 연구결과 입지선정기준으로는 해안선에서 1km 이내 거리에 위치하고 오염물질 배출시설이 없으며 더위체감지수와 체감온도가 연중 80%이상 '주의' 이하로 유지되는 곳으로 한다. 환경계획기준에서 수질은 국내기준 혹은 ISO 17680 기준 가운데 가장 엄격한 기준으로 하고 공기의 질은 「환경정책기본법」의 대기환경기준치의 60% 수준으로 하며 공기 중 SO2, NO2, O3, PM10 농도는 연간기준초과횟수를 EU기준에 맞도록 하고 소음은 주간 50dB 이하, 야간 40dB 이하로 한다. 공간계획기준은 공간의 특성에 따라 「건축법」의 기준, 건축계획실무기준, 국제기준을 따르도록 한다.

Urban facility construction planning system using location-time information

  • Shin, Jaehyeon;Lee, Sang-Joon;Kwak, Ho-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권1호
    • /
    • pp.187-195
    • /
    • 2019
  • In this paper, a shared model of systematic urban facility construction planning system is proposed. As the scope of construction on urban facilities has expanded, the construction process may occur simultaneously in the same location and short period of time by the different public agencies. This kind of construction duplications may cause the inefficiency of construction time and cost. In order to improve this, we studied the sharing method of the construction information which are produced by the different construction agencies. And also studied the method of find out the duplicate constructions occurring in the same place and short period of time. And Then we suggest a system that can rearrange the order of urban facility construction.

지역 사회복지관 및 보건시설의 배치계획을 위한 기초연구 (A Basic Study on the Planning of Location to the Community Welfare Center and the Healthcare Facility in a District)

  • 채희재
    • 한국농촌건축학회논문집
    • /
    • 제1권3호
    • /
    • pp.77-86
    • /
    • 1999
  • Recently the change of social environment has influence on the living of human for the complexity and the variety. And so the relation of architecture and function required the complex space. The government tried to complex the service for healthcare and social welfare by the exhibition model for health and welfare center. In this sence, this study aims to explore the basic data for the planning of location to the community welfare center and the healthcare facility in a district by grasping the difference of level at facility among region. In sum, the useful data were collected, analyzed, and synthesized through this study and could be used in the relevant research in the future as reference informations.

  • PDF

도시쾌적성을 위한 학교용지의 입지결정방향에 관한 연구 - 학교용지와 공원용지와의 연관적 배치를 중점으로- (A Study on School Location decision direction for Urban Amenity - The focus on Location relation school and park of land use planning-)

  • 김형돈;김성중;남정훈
    • 교육녹색환경연구
    • /
    • 제8권1호
    • /
    • pp.34-46
    • /
    • 2009
  • The purpose of this study was to analyze the school location decision direction for land use planning of public land development. And this research proposed the school location decision direction for urban amenity. So this research present the implication on urban planning and design for architecture, park-school complex. This study perform the relationship with land use planning out side environment of school land. This research proved the fact that the school land relationship with the park, the other school land etc. And this result will be used in decision-making-process of land use planning, public land development construction, urban design and city policy.

  • PDF

주거지내 초등학교의 활용을 위한 계획 방향 (Planning and Design Guidelines for the Utilization of Elementary Schools in Urban Housing Blocks)

  • 임은정;양우현
    • 한국주거학회논문집
    • /
    • 제15권1호
    • /
    • pp.205-214
    • /
    • 2004
  • The intent of this study is to investigate the current situations and planning implications of elementary schools in urban housing blocks, and to propose the planning and design guidelines for them. The premise of this research is that an elementary school should function as a communal facility, shared by its community, so called open-school. 32 schools in three new towns were selected as sample cases and they were closely surveyed in terms of their site planning issues in residential blocks, and three sample open-elementary schools were analyzed in a comparative manner for finding their roles and functional fulfillment as a communal facility in the neighborhoods. Based on the findings, several planning principles and design techniques or devices are suggested for the utilization of elementary schools by local residents, mainly making issues of location, relationship to other facilities and open spaces in residential blocks, access, apartment layout, school building and outdoor spaces, and open program.

학교 급식시설의 식당계획 개선방안에 관한 연구 - 대구광역시 초등학교 사례 조사를 통해 (A Study on Improvement of the Cafeteria Planning in Educational Facility Case study on Elementary School in Daegu City)

  • 이택훈;이정란;이상홍
    • 한국주거학회논문집
    • /
    • 제15권6호
    • /
    • pp.99-106
    • /
    • 2004
  • The purpose of the study is to propose architectural design standards of the cafeteria planning in educational facilities. In the spatial organization planning, the preferred location of the cafeteria is on the first floor and the types of the floor plan are followed by the forms and space structure of the school building. The area of the cafeteria is related to the size of seating area per person. The direction must sublate northern faced. In interior moving lines for service, the arrange of dining tables has to reflect distance of dining tables or location of pillars. The dining space should better have more than two entrances in terms of occupancy type and convenience. Thus the serving line has to be planed thoughtfully by various factors to avoid confusion caused in serving process. In multipurpose use of the cafeteria, it is feasible when hygiene and management is considered.

설비배치합리화에 관한 연구 - 다품종소량생산형태를 중심으로 - (On the Study of Rationalization of Plant Layout - Orient ed Non-massing Jobbing Production Shop -)

  • 조남호;이근희
    • 산업경영시스템학회지
    • /
    • 제7권10호
    • /
    • pp.1-16
    • /
    • 1984
  • The purpose of this paper is to develop rational layout model for small and medium scale industry in Korea. The methodology of this paper is to light the importance of small and medium scale company. Moreover, to overcome the problem of layout in non-massing jobbing production shop this paper is proposed four techniques. So proposed layout model is obtained analytically in single, multiple facility location problem The result of this paper is as follows : First, alternatives to overcome abnormal layout in small and medium company are 1) GT (Group Technology) 2) SLP (Systematic Layout Planning) 3) OR (Operations Research) 4) Computer Second, in single facility location problem, Gradient method and square weighted average method are studied. Lastly in multiple facility location problem, heuristic method is obtained.

  • PDF

제한용량이 있는 설비입지결정 문제에 대한 적응형 평균치교차분할 알고리즘 (Adaptive Mean Value Cross Decomposition Algorithms for Capacitated Facility Location Problems)

  • 김철연;최경현
    • 대한산업공학회지
    • /
    • 제37권2호
    • /
    • pp.124-131
    • /
    • 2011
  • In this research report, we propose a heuristic algorithm with some primal recovery strategies for capacitated facility location problems (CFLP), which is a well-known combinatorial optimization problem with applications in distribution, transportation and production planning. Many algorithms employ the branch-and-bound technique in order to solve the CFLP. There are also some different approaches which can recover primal solutions while exploiting the primal and dual structure simultaneously. One of them is a MVCD (Mean Value Cross Decomposition) ensuring convergence without solving a master problem. The MVCD was designed to handle LP-problems, but it was applied in mixed integer problems. However the MVCD has been applied to only uncapacitated facility location problems (UFLP), because it was very difficult to obtain "Integrality" property of Lagrangian dual subproblems sustaining the feasibility to primal problems. We present some heuristic strategies to recover primal feasible integer solutions, handling the accumulated primal solutions of the dual subproblem, which are used as input to the primal subproblem in the mean value cross decomposition technique, without requiring solutions to a master problem. Computational results for a set of various problem instances are reported.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF