• Title/Summary/Keyword: FOREST ROAD CONSTRUCTION

Search Result 120, Processing Time 0.024 seconds

Computations of Forest Road Density considering for Forest Terrain and Characteristics (산지 지형 및 특성을 고려한 임도밀도 산정)

  • Jung, Do Hyun;Cha, Du Song;Park, Chong Min;Lee, Joon Woo;Ji, Byoung Yun;Chun, Kwon Suk;Kim, Jong Yoon
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.3 s.160
    • /
    • pp.168-177
    • /
    • 2005
  • To provide the basic policy informations for environment-friendly and economical construction of green forest road, forest road density considering for the forest terrain and characteristics was computed. As results, designing the effective forest management and protection, standard forest road density as a social overhead capital (SOC) concept was computed to 8.57 m/ha. Considering as based facilities for forest management, we also optimal forest road density for preparing the sustainable forest management system was computed to 14.01 m/ha.

Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road - (벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 -)

  • Woo, Bo-Myeong;Kim, Kyung-Hoon;Park, Jae-Hyeon;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF

Analysis on the Characteristics of Debris Flows Occurred around the Forest Road in Jinbu Area of Gangwon Province (강원도 진부지역 임도변 발생 토석류 특성분석)

  • Seo, Heung-Seok;Yune, Chan-Young;Jun, Kyoung-Jea
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.698-707
    • /
    • 2010
  • Because of localized extreme rainfall followed by Typhoon Ewiniar in 2006, a lot of landslides and debris flows were occurred in Jinbu area of Gangwon Province. Field investigation performed in this area found that it can be divided into three categories i.e. large debris flow, small debris flow, and debris flow around forest road. We performed field investigation especially for the sites where debris flow occurred around forest road. And the characteristics of the debris flow around forest road were analyzed and compared with the other site of debris flow.

  • PDF

A Study on the Change of Work and Improvement in the Private Forest Road of Chungcheongnam Province (충청남도 민유임도에 적용된 공종의 변화 및 개선방안에 관한 연구)

  • Lee, Joon Woo;Kim, Ju Baek;Choi, Yeon Ho;Kim, Myeong Jun;Park, Bum Jin;Park, Jong-Min
    • Journal of Forest and Environmental Science
    • /
    • v.23 no.1
    • /
    • pp.21-28
    • /
    • 2007
  • In my study, I analysed and criticised the change of applied works based on a design drawing of a private forest road in Chungchengnam province from 1990 to 2003. The aim of this study is to obtain the fundamental resources for establishment the green forest road which is environment friendly. Working expenses of forest road was gradually increased by a business year. In particular, the working expenses dramatically increased in 1999-2000. In change rate of cost of construction by works, earth work rate of the cost of constructions was declined: from 25.4% in 1990-1999, to 18.5% in 2000-2003. However, the total cost of the construction of slope protection work and structural work increased. Nevertheless the rate of the cost of constructions are not increased where as the earth work rate of the cost of constructions were reduced. The rate of the price construction materials and the cost of construction was the main causes which was led by the extension of the standard requirement of applied work and the increase of the materials of applied work. In other word, materials of structural work and slope protection work increased. If the increase of the cost of construction has seem through the increase of contractual materials and extension of the standard requirement would led to weak competitiveness of forest road. Therefore, diverse method of constructions need to apply and a new method should be developed.

  • PDF

Speed Index of Logging Truck in Forest Road (임도에서 운재차량의 속도지수)

  • Lee, Joon Woo
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.138-149
    • /
    • 1996
  • This study was aimed at predicting to running speed related to alignment factors of forest road, and recommending the improvement method of forest road construction using the running speed of vehicles. For these purposes, this study proceeds to select forest roads after reviewing the planning papers and maps, to measure the road alignment factors such as longitudinal gradient, width of roadway, radius of curve, length of curve, superelevation, and conditions of road surface on the subject forest road. It was found that the average running speed of logging truck showed lower value than that of the expected speed of 'Forest Road Construction Regulations and Rules', and the average running speed of loaded truck showed 70-85% of the speed of empty truck. According to the road conditions, speed index (reductive ratio of running speed) was also calculated with respect to radius of curve, longitudinal dradient. The results of the study on the running speed of vehicle subject to the alignment of forest roads make it possible for one to judge the quality of the existed and to be constructed forest roads, to select the structure of forest road to improve the running speed of vehicle on forest road.

  • PDF

Analyses of Forest Road Construction Policy Using LISREL Approach (리즈렐모형을 이용한 임도사업의 계량적 분석)

  • Choi, Kwan
    • Journal of Korean Society of Forest Science
    • /
    • v.97 no.1
    • /
    • pp.22-29
    • /
    • 2008
  • The objective of this study is to provide useful information for the establishment of efficient policy implementation strategies of forest road construction policy in South Korea. Data needed for the analysis was collected by a questionnaire survey. For the analysis, policy evaluation model was constructed based on theories of public policy. Evaluation model contains three independent variables (policy initiative factor, policy content, policy environment) and two dependent variables (policy result, policy impact). Since, these variables are unobservable latent variables, observable indicators are needed as proxy measures. LISREL (Linear Structural Relationships) was employed for the analysis since it is a useful measure for analysing linear structural model which consists of structural and measurement equations. It was confirmed that forest road construction is an effective policy mean for the development of rural region and activating forest resources management. The policy outcome, however, was not satisfactory. To improve the effectiveness of forest road construction policy some modification of policy contents are needed such as increased construction budget, allowing more flexibility and participation to the implementation personal and providing technical support.

Analysis of Individual Tree Change Using Aerial Photograph in Deforested area Before and After Road Construction (항공영상을 활용한 도로개발 전·후 산림 훼손지 개체목 분석)

  • Choi, Jae-Yong;Kim, Seoung-Yeal;Kim, Whee-Moon;Song, Won-Kyong;Lee, Ji-Young;Choi, Won-Tae;Moon, Guen-Soo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.65-73
    • /
    • 2018
  • Although the road construction in forest is increasing and there is a need for development ecological restoration on deforest area, no consideration has been given to individual trees in there. This study analyzed aerial photographs of deforest area before and after road construction for determining the degree of forest destruction by extracting individual trees. Study area was selected in the sites where are damaged by road construction in GongJu-si, YuSung-gu, and YeongDong-gun. The aerial photograph taken 1979 before construction is panchromatic image of 80cm in GSD (Ground Sample Distance) and other photograph taken 2016 after construction is multi-spectral image of 10cm in GSD. In order to minimize the difference of GSD, we conducted image re-sampling process for setting to same GSD for the two photographs. After that we carried out visual interpretation method for determining to change of individual tree. The result found that for GongJu-si of the number of individual tree was 1,014 in 1979 and 886 in 2016, which decreased by 128 (12.6%) and the average width of those decreased from 5.77m to 5.75m by 0.47%. In case of YoungDong-gun, the number of it was 761 in 1979 and 746 in 2016, which decreased by 2.0% and the average width of it decreased from 8.99mm to 8.90m by 1.1%. Lastly in case of YuSung-gu, the number of it was 1,578 in 1979 and 988 in 2016, which decreased by 37.4% and the average width of it decreased from 7.09m to 6.65m by 6.21%. these result imply that road construction causes destruction of forests. Since there are limitations such as errors due to researcher, it is necessary to construct a quantitative analysis method for the change of the deforest area. It is need to study the method of extracting individual tree in deforest area more accurately using high-resolution image of GSD 10cm or more as well. This study can be used as a basic data for the ecological restoration of the deforest area considering characteristics of individual tree such as height, diameter at breast height, and biomass.

Exploring the Priority Area of Policy-based Forest Road Construction using Spatial Information (공간정보를 활용한 산림정책 기반 임도시공 우선지역 선정 연구)

  • Sang-Wook, LEE;Chul-Hee, LIM
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.25 no.4
    • /
    • pp.94-106
    • /
    • 2022
  • In order to increase timber self-sufficiency, Korea's 6th Basic Forest Plan aims to increase the density of forest roads to 12.8 m ha-1 by 2037. However, due to rapid re-forestation, current management infrastructure is insufficient, with just 4.8 m ha-1 of forest roads in 2017. This is partly due to time and cost limitations on the process of forest road feasibility evaluation, which considers factors such as topography and forest conditions. To solve this problem, we propose an eco-friendly and efficient forest road network planning method using a geographic information system (GIS), which can evaluate a potential road site remotely based on spatial information. To facilitate such planning, this study identifies forest road construction priorities that can be evaluated using spatial information, such as topography, forest type and forest disasters. A method of predicting the optimal route to connect a forest road with existing roads is also derived. Overlapping analysis was performed using GIS-MCE (which combines GIS with multi-criteria evaluation), targeting the areas of Cheongsong-gun and Buk-gu, Pohang-si, which have a low forest-road density. Each factor affecting the suitability of a proposed new forest road site was assigned a cost, creating a cost surface that facilitates prioritization for each forest type. The forest path's optimal route was then derived using least-cost path analysis. The results of this process were 30 forestry site recommendations in Cheongsong-gun and one in Buk-gu, Pohang-si; this would increase forest road density for the managed forest sites in Cheongsong-gun from 1.58 m ha-1 to 2.55 m ha-1. This evaluation method can contribute to the policy of increasing timber self-sufficiency by providing clear guidelines for selecting forest road construction sites and predicting optimal connections to the existing road network.

Differences in Field Sign Abundance of Mammal Species Around the Roads in Baekdudaegan Mountains

  • Hur, Wee-Haeng;Lee, Woo-Shin;Choi, Chang-Yong;Park, Young-Su;Lee, Chang-Bae;Rhim, Shin-Jae
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.2 s.159
    • /
    • pp.112-116
    • /
    • 2005
  • This study was conducted to obtain the information of distribution, protection and management for mammal species in fragmented forest areas around the road from June 2002 to May 2003 in 9 study sites of Baekdugdaegan mountains, Korea. Field signs of twelve mammals, moles Molera robusta, Korean hares Lepus coreanus, Manchurian chipmunk Tamias sibiricus, red squirrels Sciurus vulgaris, Korean racoon dogs Nyctereutes procyonoides, Siberian weasels Mustela sibirica, badgers Meles meles, otters Lutra lutra, Bengal cats Felis bengalensis, wild boars Sus scrofa, water deer Hydropotes inermis and roe deer Capreolus pygargus were recorded in this study. There were no differences in total number of species between 50 m areas and 50-100 m areas from road in snow and non-snow season. Number of mammals' field signs were different in non-snow season between both areas. Red squirrels and Siberian weasels were more abundant in 50 m areas, and Korean hares and Manchurian chipmunks were in 50-100 m areas. Habitat using pattern of mammal species may be affected by the road. Reasonable road construction and maintenance would be needed for protection and management of wildlife and their habitats.

Application Method of GIS for Planning of Forest Road Network (임도망의 계획에 있어서 GIS 활용방안)

  • Jeon, Kwon-Seok;Ma, Ho-Seop
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.99-106
    • /
    • 2002
  • The application method of GIS for planning of forest road network can be save the efforts and cost by frequently change of forest road and evaluation the forest road route before construction. The purpose of this study is to suggest the proper method for planning an optimal forest road network in mountains forest using geographic information system(GIS) in the national forest of Mt. Kumsan at Namhae-gun, Gyungsangnam-do. In the forest road network planning by the minimum longitudinal gradient, The total length was 20.41km, and road density was 6.92m/ha. In the forest road network planning by mixed with the minimum longitudinal gradient and the maximization of investment effect, The total length was 21.15km, and road density was higher than that of the minimum longitudinal gradient as 7.17m/ha. The road length overlapped by cost path was more short than 3.52m/ha of the minimum longitudinal gradient as 1.73km. So, it appeared that forest road has an high effectiveness in yarding function. Therefore, it considered that the geographic information system could provide an effective and resonable solutions for planning of optimal forest road network.

  • PDF