• 제목/요약/키워드: FIDIC

검색결과 36건 처리시간 0.019초

지체상금 개선방안에 관한 기초연구 (A Basic Study on the Improvement for Liquidated Damages at Construction Delay)

  • 국동훈;손기영;김선국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.458-461
    • /
    • 2006
  • 건설시장의 개방과 함께 보다 다양화되고 국제화된 건설문화를 받아들이게 된 시점에서 우리나라 건설문화수준 및 정책은 아직 국제기준에 미치지 못하고 있는 실정이다. 그 예로 시공자 귀책사유로 인한 공기지연시 위약금 성격의 지체상금 산정방법은 손해배상금 성격의 국제기준과 차이를 보여 추후 잠재적 클레임의 가능성을 지닌다. 이에 본 연구는 지체상금 산정방법을 국제기준 및 공기연장비용과의 비교 ${\cdot}$ 분석을 통해 실제 발생되는 항목을 선정하여 손해배상금 성격의 지체상금 산정방법 개선방안을 위한 기초연구를 진행하였다.

  • PDF

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

Development Scheme of Transport Infrastructure in Poland as the European Union Member by Public Private Partnership

  • Stanislaw Barbuzynski;Kim Soo-Yong;Lee Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.120-127
    • /
    • 2004
  • 2004년 5월에 폴란드와 다른 동유럽 국가들이 EU에 가입되었다. EU에 가입 후에 폴란드는 도로부분의 투자 현실화를 촉진할 수 있을 것이고, 2005년에 도로 네트워크 상태의 중요한 개선을 이룰 수 있을 것이다. 폴란드 정부는 고속도로의 건설에 요구되는 전체 투자를 하는 것이 불가능하므로, 공공$\cdot$민간 파트너쉽에 기반한 프로젝트 투자의 최신의 기법을 개발하기를 원한다. 높은 품질의 교통 네트워크 없이는 경제적인 경쟁을 할 수가 없다. 이것은 EU에서 유럽 교통 네트워크를 구축하려고 하는 이유 때문이다. 유럽 교통 네트워크는 서유럽의 15개국과 폴란드와 같이 새로 가입된 회원국들 사이에 연결 고리를 제공해 줄 것이다. 그 결과로서, 폴란드는 향상된 교통 기반시설 네트워크를 확립할 것이다.

해외건설공사에서 독립보증에 관한 분쟁과 그 대책 (A Study on First Demand Guarantees in International Construction Projects -Disputes arising from the DG and Recommendations for their Drafting-)

  • 최명국
    • 무역상무연구
    • /
    • 제47권
    • /
    • pp.129-156
    • /
    • 2010
  • Since the 1970s, international construction employers have commonly requested first demand guarantees upon their contractors as a form of security for due performance of their works. Contractors prefer the greater protection offered by more traditional forms of security requiring presentation of an arbitral award or other evidence of the caller's entitlement to compensation. Many contractors nonetheless feel that they have no alternative but to provide these unconditional guarantees in order to compete. However, these unconditional first demand guarantees are controversial and have given rise to numerous disputes both in arbitration and litigation. Disputes arising from first demand guarantees can be broken down into a) applications to prevent a perceived fraudulent or otherwise unfair or improper calling of a guarantee, b) claims arising from such abusive calls and c) claims relating to the consequences of such calls even if the call itself may not be abusive as such. The contractors should carefully assess the risk of an abusive call being made bearing in mind the difficulties he may face in seeking to prevent such a call. He should also bear in mind the difficulties, delays and cost he is likely to encounter in seeking to recover any monies wrongfully called. One option would be to provide that the call can only be made once and to the extent that the employer's damages have been assessed or even incurred or even for the default to have been established by an arbitral tribunal or court. Another option would be to provide that any call be accompanied by a decision of a competent and impartial third party stating that the contractor is in breach. For example, such a requirement could be incorporated into a construction contract based on the FIDIC Conditions by submitting this decision to a Dispute Adjudication Board. Another option would be to provide for the "ICC Counter-Guarantee Scheme". In sum, there would appear to be room for compromise between the employer and the contractor in respect of first demand guarantees by conditioning the entitlement to call such guarantees to the determination of a competent and impartial third party.

  • PDF

해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법 (Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects)

  • 이황구;신동우;김경래;차희성;김영재
    • 한국건설관리학회논문집
    • /
    • 제18권6호
    • /
    • pp.65-77
    • /
    • 2017
  • 최근 대형 건설회사의 해외시장 비중 확대와 함께 해외 프로젝트에서의 공기지연에 따른 경영 손실에 대한 이슈가 지속적으로 제기되고 있다. 일반적으로 대형 프로젝트의 수행 과정에서 변경은 필연적으로 발생한다. 대부분의 변경은 공기지연과 연결되기 때문에 변경으로 인하여 공기연장이 필요한 경우 건설사는 계약에서 정한 기준에 따라 공기지연을 관리해야 공기지연에 따른 리스크에 효과적으로 대응할 수 있다. 공기지연을 유발하는 변경에 대한 계약적 대응이 부족할 경우 클레임이 해결되지 않고 분쟁으로 확대되는 경우가 많다. 프로젝트 초기 단계에 계약에서 요구하는 공기지연 관리 절차와 방법을 분석하는 것이 중요하나 이에 대한 방법 및 도구를 제시하지 못하고 있었다. 본 논문에서는 국내 주요 건설사들의 공정관리 실무 및 해외 공사에서의 클레임 및 분쟁사례에 대한 고찰을 통해 문제를 제시하고 해외 건설 계약조건상에 포함된 공기지연 관리 리스크를 평가할 수 있는 방법을 제시하였다. 공기지연의 합리적 대응과 관련된 계약조건상의 리스크 평가 틀을 제시하기 위하여 FIDIC Red Book(1999), PSSCOC(2014) 및 SIA 9th Edition(2010) 등 국제 표준 계약조건 뿐만 아니라 ARAMCO 및 QP를 포함한 해외 대형 발주자의 표준계약조건에 나타나 있는 공기지연 관리 요건 및 수준을 검토하여 전체 7개 영역, 62개 항목으로 구성된 계약조건 리스크 평가모델을 제안하였다. 계약조건 리스크 평가 모델은 계약조건상의 공기지연리스크 확인을 위한 구조적 틀을 제공하며 개별 리스크 항목별 표준적인 수준을 제시함으로써 해당 프로젝트의 리스크 수준을 확인하고 이에 효과적으로 대응할 수 있는 단초를 제공한다. 제안된 모델의 유효성 검증을 위하여 실제 제안한 모델을 실제 프로젝트에 적용하여 그 효과를 입증하였다.

EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용 (Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques)

  • 이현상;이원석;조보근;이희준;오상진;유상우;남마루;이현식
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제12권11호
    • /
    • pp.471-480
    • /
    • 2023
  • 국내 건설수주 규모는 2013년 91.3조원에서 2021년 총 212조원으로 특히 민간부문에서 크게 성장하였다. 국내외 시장 규모가 성장하면서, EPC(Engineering, Procurement, Construction) 프로젝트의 규모와 복잡성이 더욱 증가되고, 이에 프로젝트 관리 및 ITB(Invitation to Bid) 문서의 위험 관리가 중요한 이슈가 되고 있다. EPC 프로젝트 발주 이후 입찰 절차에서 실제 건설 회사에게 부여되는 대응 시간은 한정적일 뿐만 아니라, 인력 및 비용의 문제로 ITB 문서 계약 조항의 모든 리스크를 검토하는데 매우 어려움이 있다. 기존 연구에서는 이와 같은 문제를 해결하고자 EPC 계약 문서의 위험 조항을 범주화하고, 이를 AI 기반으로 탐지하려는 시도가 있었으나, 이는 레이블링 데이터 활용의 한계와 클래스 불균형과 같은 데이터 측면의 문제로 실무에서 활용할 수 있는 수준의 지원 시스템으로 활용하기 어려운 상황이다. 따라서 본 연구는 기존 연구와 같이 위험 조항 자체를 정의하고 분류하는 것이 아니라, FIDIC Yellow 2017(국제 컨설팅엔지니어링 연맹 표준 계약 조건) 기준 계약 조항을 세부적으로 분류할 수 있는 AI 모델을 개발하고자 한다. 프로젝트의 규모, 유형에 따라서 세부적으로 검토해야 하는 계약 조항이 다를 수 있기 때문에 이와 같은 다중 텍스트 분류 기능이 필요하다. 본 연구는 다중 텍스트 분류 모델의 성능 고도화를 위해서 최근 텍스트 데이터의 컨텍스트를 효율적으로 학습할 수 있는 ELECTRA PLM(Pre-trained Language Model)을 사전학습 단계부터 개발하고, 해당 모델의 성능을 검증하기 위해서 총 4단계 실험을 진행했다. 실험 결과, 자체 개발한 ITB-ELECTRA 모델 및 Legal-BERT의 앙상블 버전이 57개 계약 조항 분류에서 가중 평균 F1-Score 기준 76%로 가장 우수한 성능을 달성했다.