• Title/Summary/Keyword: FEBEX 현장시험

Search Result 2, Processing Time 0.019 seconds

Numerical analysis of FEBEX at Grimsel Test Site in Switzerland (스위스 Grimsel Test Site에서 수행된 FEBEX 현장시험에 대한 수치해석적 연구)

  • Lee, Changsoo;Lee, Jaewon;Kim, Geon-Young
    • Tunnel and Underground Space
    • /
    • v.30 no.4
    • /
    • pp.359-381
    • /
    • 2020
  • Within the framework of DECOVALEX-2019 Task D, full-scale engineered barriers experiment (FEBEX) at Grimsel Test Site was numerically simulated to investigate an applicability of implemented Barcelona basic model (BBM) into TOUGH2-MP/FLAC3D simulator, which was developed for the prediction of the coupled thermo-hydro-mechanical behavior of bentonite buffer. And the calculated heater power, temperature, relative humidity, total stress, saturation, water content and dry density were compared with in situ data monitored in the various sections. In general, the calculated heater power and temperature provided a fairly good agreement with experimental observations, however, the difference between power of heater #1 and that of heater #2 could not captured in the numerical analysis. It is necessary to consider lamprophyre with low thermal conductivity around heater #1 and non-simplified installation progresses of bentonite blocks in the tunnel for better modeling results. The evolutions and distributions of relative humidity were well reproduced, but hydraulic model needs to be modified because the re-saturation process was relatively fast near the heaters. In case of stress evolutions due to the thermal and hydraulic expansions, the computed stress was in good agreement with the data. But, the stress is slightly higher than the measured in situ data at the early stage of the operation, because gap between rock mass and bentonite blocks have not been considered in the numerical simulations. The calculated distribution of saturation, water content, and dry density along the radial distance showed good agreement with the observations after the first and final dismantling. The calculated dry density near the center of the FEBEX tunnel and heaters were overestimated compared with the observations. As a result, the saturation and water content were underestimated with the measurements. Therefore, numerical model of permeability is needed to modify for the production of better numerical results. It will be possible to produce the better analysis results and more realistically predict the coupled THM behavior in the bentonite blocks by performing the additional studies and modifying the numerical model based on the results of this study.

Overseas Review on the In-situ Demonstration of EBS for IN-DEBS Development (공학적방벽 현장실증 시스템 (IN-DEBS) 개발을 위한 해외 실증연구 현황 분석)

  • Lee, Minsoo;Choi, Heui-Joo;Lee, Jong-Youl;Lee, Changsoo;Lee, Jae-Owan;Kim, Inyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.12 no.2
    • /
    • pp.107-119
    • /
    • 2014
  • The worldwide Status-of-Art survey for the in-situ experiments of the engineered barrier system for HLW underground disposal was performed as a preliminary action for the design of the in-situ demonstration at KURT. Some nations, which have executed or is ongoing the in-situ experiments at their underground research facilities, were summarized in this review. The demonstration projects reviewed were TBT/Sweden-France, LOT/Sweden, HE-E/Switzerland, PRACLAY/Belgium, FEBEX/Spain, HORONOBE/Japan, and BCE/Canada. The investigated items for the projects were mainly their purposes, constitutional structures, test conditions, monitoring parameters and the measuring tools, and test results. In this review, the hardware design and the assembling of the test system were more concentrated rather than their experimental results, because the purpose of this review is to achieve the necessary information for the practical design of the in-situ experiment to be installed at KURT. A mid scale in-situ demonstration of EBS at KURT, that is called IN-DBES, will be launched right after the completion the expanding project of KURT in 2015. It is hoped that the structural design, installing methods, hardware equipments required in the establishment of IN-DEBS will be referred on this review.