• 제목/요약/키워드: Existing tunnel

검색결과 627건 처리시간 0.022초

원심모형실험을 이용한 터널 측방배수관에 퇴적되는 침전물 저감방안 연구 (A study on the Reduction Scheme of Sediments Deposited on a Lateral Drain Pipe in Tunnel using Centrifugal Tests)

  • 김태영;김유석;박종관
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1380-1384
    • /
    • 2006
  • Sediments deposited on lateral drain pipes in a tunnel make lateral porous pipes clogged. Since the safety of the tunnel can be affected by this phenomenon, it requires a regular maintenance of the lateral drain pipes. In this study, a series of centrifugal tests were conducted in order to find out the method which can reduce the clogging effect considerably. Four different types of tunnel drain configurations were selected in the experiments. By analysis of sediments for each configuration, the optimum drain configuration that can minimize sedimentation of cement constituents was investigated. As a results, the existing drain configuration which uses filter concrete appear to produce much sediments. In contrast, the new drain configuration appears to be able to reduce sedimentation ratio up to almost 50% comparing with the existing one. From these observations, it may be concluded that the new drain configuration, in which the lateral porous pipes of a tunnel are surrounded by gravel layer and non-woven geotextile, has high efficiency in maintenance.

  • PDF

Deformation Monitoring and Prediction Technique of Existing Subway Tunnel: A Case Study of Guangzhou Subway in China

  • Qiu, Dongwei;Huang, He;Song, Dong-Seob
    • 한국측량학회지
    • /
    • 제30권6_2호
    • /
    • pp.623-629
    • /
    • 2012
  • During the construction of crossing engineering one of the important measures to ensure the safety of subway operation is the implementation of deformation surveying to the existing subway tunnel. Guangzhou new subway line 2 engineering which crosses the existing tunnel is taken as the background. How to achieve intelligent and automatic deformation surveying forecast during the subway tunnel construction process is studied. Because large amount of surveying data exists in the subway construction, deformation analysis is difficult and prediction has low accuracy, a subway intelligent deformation prediction model based on the PBIL and support vector machine is proposed. The PBIL algorithm is used to optimize the exact key parameters combination of support vector machine though probability analysis and thereby the predictive ability of the model deformation is greatly improved. Through applications on the Guangzhou subway across deformation surveying deformation engineering the prediction method's predictive ability has high accuracy and the method has high practicality. It can support effective solution to the implementation of the comprehensive and accurate surveying and early warning under subway operation conditions with the environmental interference and complex deformation.

기존시가지의 규모(면적)에 따른 공동구 설치 타당성에 관한 연구 (A Feasibility Study for the Multi-Utility Tunnel by City Scale (Area))

  • 오원준;나귀태;조중연;이민재
    • 대한토목학회논문집
    • /
    • 제39권6호
    • /
    • pp.903-911
    • /
    • 2019
  • 공동구는 필수적인 사회기반시설 중의 하나이나, 국토계획법의 공동구 설치의무규모(200만㎡)로 인하여 공동구의 설치가 어려운 실정이다. 본 논문에서는 공동구 설치 활성화를 위하여 기존시가지에서의 공동구 설치에 대한 타당성을 분석하였다. 타당성 분석을 위하여 관련법규를 근거로 규모를 4가지로 분류하였으며, 타당성과 경제성 분석을 활용하여 관련지표 선정 및 평가를 진행하였다. 그 결과 기존시가지의 규모에 적합한 터널식 공동구는 3종/4종으로 나타났으며, 200만㎡ 이상의 신도시는 5종의 개착식 공동구가 적합한 것으로 분석되었다. 현재 공동구 설치 의무 규모인 신도시 200만㎡ 이상에서 개착식과 기존시가지의 터널식 공동구의 종합평가결과가 많은 차이를 보이지 않으므로, 기존시가지에서 다양한 규모의 공동구 설치가 타당하다는 것을 제시하고자 한다.

발파진동이 터널구조물에 미치는 영향 (Effect of blast-induced vibration on a tunnel)

  • 문훈기;신종호
    • 한국터널지하공간학회 논문집
    • /
    • 제10권3호
    • /
    • pp.207-219
    • /
    • 2008
  • 도심지내 굴착공사는 기존 지하구조물의 근접시공의 시계가 증가하는 추세이다. 근접시공에 따른 터널의 안정성은 가이드라인이 제시되어 있으나, 굴착공사에서 유발되는 발파신동이 터널구조물에 미치는 영향에 대한 연구는 미미한 실정이다. 본 연구는 국내외의 터널 안전영역 기준과 발파진동의 허용기준을 검토하고 진동가이드라인을 추정하기 위하여 수치해석적인 방법을 사용하여 수행하였다. 해석에 사용된 발파하중은 이론식인 International Society of Explosive Engineers(2000) 제안식을 이용하여 폭굉압력(detonation pressure)을 산정하였고 해석 모델은 서울지하철을 대상으로 하였다. 실제발파현장에 인접한 지하철 구간의 진동계측치를 수치해석결과와 비교하여 수치해석의 적정성을 검토하였다. 동적수치해석 결과 라이닝의 절점에 작용하는 진동속도의 영향원으로부터 허용값을 만족하는 영역을 제시하였다.

  • PDF

Ground-born vibration at multileveled train tunnel crossing

  • Moon, Hoon-Ki;Kim, Kang-Hyun;Kim, Ho-Jong;Shin, Jong-Ho
    • Structural Engineering and Mechanics
    • /
    • 제73권4호
    • /
    • pp.367-379
    • /
    • 2020
  • In recent railway projects where the railway connects between cities, newly planned tunnels are often located close to, or beneath an existing tunnel. Many claims and petitions have voiced public concern about the vibration and noise resulting from the situation. Vibrations and noises are engineering issues as well as environmental problems, and have become more important as people have become more concerned with their the quality of life. However, it is unlikely that the effects of vibration in situations where trains simultaneously pass a multileveled tunnel crossing have been appropriately considered in the phase of planning and design. This study investigates the superposition characteristic of ground-born vibrations from a multileveled tunnel crossing. The results from model tests and numerical analysis show that the ground-born vibration can be amplified by a maximum of about 30% compared to that resulting from the existing single tunnel. Numerical parametric study has also shown that the vibration amplification effect increases as the ground stiffness, the tunnel depth, and the distance between tunnels decrease.

Study on the behaviour of pre-existing single piles to adjacent shield tunnelling by considering the changes in the tunnel face pressures and the locations of the pile tips

  • Jeon, Young-Jin;Jeon, Seung-Chan;Jeon, Sang-Joon;Lee, Cheol-Ju
    • Geomechanics and Engineering
    • /
    • 제21권2호
    • /
    • pp.187-200
    • /
    • 2020
  • In the current work, a series of three-dimensional finite element analyses have been conducted to investigate the behaviour of pre-existing single piles in response to adjacent tunnelling by considering the tunnel face pressures and the relative locations of the pile tips with respect to the tunnel. Via numerical modelling, the effect of the face pressures on the pile behaviour has been analysed. In addition, the analyses have concentrated on the ground settlements, the pile head settlements and the shear stress transfer mechanism at the pile-soil interface. The settlements of the pile directly above the tunnel crown (with a vertical distance between the pile tip and the tunnel crown of 0.25D, where D is the tunnel diameter) with a face pressure of 50% of the in situ horizontal soil stress at the tunnel springline decreased by approximately 38% compared to the corresponding pile settlements with the minimum face pressure, namely, 25% of the in situ horizontal soil stress at the tunnel springline. Furthermore, the smaller the face pressure is, the larger the tunnelling-induced ground movements, the axial pile forces and the interface shear stresses. The ground settlements and the pile settlements were heavily affected by the face pressures and the positions of the pile tip with respect to the tunnel. When the piles were inside the tunnel influence zone, tensile forces were induced on piles, while compressive pile forces were expected to develop for piles that are outside the influence zone and on the boundary. In addition, the computed results have been compared with relevant previous studies that were reported in the literature. The behaviour of the piles that is triggered by adjacent tunnelling has been extensively examined and analysed by considering the several key features in substantial detail.

부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구 (Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction)

  • 이효범;고성일;전종훈;윤희택;이나현;최항석
    • 한국터널지하공간학회 논문집
    • /
    • 제22권1호
    • /
    • pp.59-76
    • /
    • 2020
  • 지속적인 수도권 교통 인프라 수요의 증가에 따른 광역·도시철도 노선의 급행화를 위해서는 완행과 급행철도를 동시에 운영할 수 있도록 하는 부본선의 건설이 요구된다. 그러나 기존 지하철 노선의 운행을 중단한 후 부본선을 건설하는 것은 많은 경제적 손실을 발생시키므로 기존 지하철 터널의 운영 중 확폭 방안에 대한 연구가 필수적이다. 따라서 본 논문에서는 기존 노선 급행화에 필요한 부본선 건설을 위해 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구를 수행하였다. 기존선 운영 중 부본선 건설방안 모색을 위해 지하철 4호선 과천선의 정부과천청사역을 부본선 건설 가상 역사로 선정하고, 4가지 방안의 구간별 단면 및 공법계획을 검토하였으며, 해당 역사에 대하여 부본선을 시공하였을 경우 시공성·경제성에 비해 상대적으로 안정성이 우려된다고 판단되는 방안을 선정하여 부본선 시공과정을 고려한 3차원 수치해석을 통한 안정성 검토를 수행하였다.

기존 대구경 파이프라인과 신설터널간의 상호작용 (Interactions between pre-existing large pipelines and a new tunnel)

  • 정선아;최정인;홍은수;천윤철;이석원
    • 한국터널지하공간학회 논문집
    • /
    • 제11권2호
    • /
    • pp.175-188
    • /
    • 2009
  • 도심지 등 지역적인 여전에 의하여 기존의 지하 공동 또는 터널에 근접하여 발파를 이용한 새로운 터널을 굴착할 경우, 새로운 터널의 굴착으로 인하여 지반이 이완되고 따라서 기존 지하 공동의 안정성에 문제가 발생할 수 있다. 이러한 가존 지하 공동의 안정성에 문제를 발생시킬 수 있는 가장 큰 요소로는 기존 지하 공동과 신설 터널의 이격거리가 될 수 또한 신설 터널 굴착으로 인한 소성영역의 발생에 따른 지반 이완을 문제 심을 수 있다. 따라서 본 연구에서는 기존 광역 상수관과 신설 터널의 이격거리에 따른 기존 광역 상수관의 안정성을 평가하기 위하여 이격거라가 다른 여섯 가지 모델에 대해 석고를 이용힌 2차원 축소 모형실험을 실시하였다. 실험 결과는 터널 굴착과정과 파괴 단계에서 발생된 변위 벡터와 균열양상으로 표현하였다. 터널 굴착과정 중 발생하는 변위를 분석하면, 터널과 광역 상수관의 간격이 상수관 직경의 2.5배 (2.5D)까지는 이격거리가 증가함에 따라 감소하는 경향을 보인다. 그러나 중심 간격이 2.5D를 넘으면 추가변위는 발생하지 않았다.

근접굴착 시 벽체에 선행하중 재하에 따른 터널의 거동 (Behavior of tunnel under the influence of pre-loading on braced wall during the adjacent ground excavation)

  • 김일;이상덕
    • 한국터널지하공간학회 논문집
    • /
    • 제9권4호
    • /
    • pp.331-341
    • /
    • 2007
  • 기존터널에 근접 굴착 할 때 발생하는 흙막이벽체의 수평변위를 억제시키기 위해 버팀대에 선행하중을 가했다. 이러한 목적으로 흙막이벽체에 큰 선행하중을 가할 수 있는 새로운 선행하중 시스템을 모형시험에 적용하였다. 대형 시험은 폭 2.0m, 높이 6.0m, 길이 4.0m인 모형 토조에서 수행하였고 시험지반은 모래로 조성하였다. 직경 1.2m인 모형 터널은 시험지반 굴착 전에 설치하고 지반을 조성한 후에 모형터널에 근접해서 흙막이벽체를 설치하고 시험지반을 굴착하면서 모형 터널과 흙막이벽체 및 지반의 거동을 측정하였다. 이때에 선행하중 재하효과를 확인하기 위하여 선행하중을 가하지 않는 시험은 물론 선행하중을 가하여 흙막이벽체의 수평변위를 억제하는 시험을 실시하였고 수치해석을 실시하여 대형 시험결과와 비교하였다. 그 결과 선행하중을 설계축력 이상으로 적용시켜 흙막이벽체의 수평변위를 감소시켰을 때 벽체 배면에 있는 기존 터널의 안정성이 크게 향상되는 것을 확인할 수 있었다.

  • PDF

교통흐름을 고려한 터널단면 확대 시공기술의 사회적 손실비용 산정에 관한 연구 (A study on the social cost estimation of the tunnel section enlargement method considering traffic flow)

  • 이승수;김동규;서종원
    • 한국터널지하공간학회 논문집
    • /
    • 제17권4호
    • /
    • pp.487-497
    • /
    • 2015
  • 도심지 교통량의 증가로 터널구간의 정체현상을 해결하기 위해 기존의 터널을 활용하여 증축 혹은 개축하는 단면 확대공사가 최적의 대안으로 고려되고 있다. 기존의 단면 확대기술은 교통흐름을 차단하고 시공하나, 최근 프로텍터를 활용하여 교통흐름을 유지할 수 있는 교통류 보존형 터널 단면 확대기술이 개발되었다. 이 기술은 교통흐름을 보존하여 수많은 사회적 손실을 최소화 할 수 있으나, 교통흐름을 보존하기 위한 프로텍터의 설치 및 운영으로 경제성 측면에서 불리할 수밖에 없다. 이러한 단면 확대기술들의 경제성을 적절히 평가하기 위해서는 시공중 교통흐름을 고려한 사회적 손실비용을 고려할 필요가 있다. 따라서 본 연구에서는 터널단면 확대 시공기술의 교통흐름을 고려한 사회적 손실비용을 산정하는 방법을 제시하는 것을 목표로 하였다. 그리고 매봉터널을 대상으로 사례연구를 수행하여 교통흐름에 따른 사회적 손실비용의 차이를 분석하는 것을 목표로 하였다.