• 제목/요약/키워드: Existing School Building

Search Result 453, Processing Time 0.028 seconds

Seismic Retrofit of an Existing School Building using CIP-Infilled Shear Walls and Steel Braces (현장타설 끼움 전단벽 및 철골가새를 활용한 기존 학교 건물의 내진보강)

  • Youn, Gil-Ho;Kim, Sung-Ho;Kim, Yong-Cheol;Yun, Hyun-Do
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.19 no.4
    • /
    • pp.21-28
    • /
    • 2012
  • This study proposes a procedure for evaluating the seismic performance and retrofit of a typical reinforced building (R/C) school buildings contructed in the 1980s. The procedure is derived from the Japanese Standard for Evaluation of Seismic Capacity of Existing Reinforced Concrete Buildings and Nonlinear Static Procedure (NSP) specified in Federal Emergency Management Agency (FEMA 356). In this study, the Japanese Standard was applied for evaluating the additionally required seismic performance in the existing school building. Cast-in-place (CIP) reinforced concrete infill walls and steel braces were used to seismically retrofit the existing school building located in the region of Hongsung in Chungnam. In the pushover analysis, i.e NSP, the hinge properties of columns, beams, infill walls and steel braces were carefully calibrated based on the existing experiment results in the available literatures. The predicted seismic performance for the retrofitted building was compared to that for the virgin building. Based on the seismic evaluation with the Japanese Standard and the FEMA 356 criteria, the addition of CIP reinforced concrete infill walls and steel braces have superior constructablility and can improve effectively the seismic performance of the existing school buildings constructed in 1980s.

A Study on the Formation of Presbyterian Missionary Architecture in Andong Area (미국(美國) 북장로회(北長老會) 안동선교부(安東宣敎部) 건축형성과정(建築形成過程)에 대한 연구(硏究))

  • Dho, Sunboong;Han, Kyuyoung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.2 no.2
    • /
    • pp.47-62
    • /
    • 2000
  • The purpose of this study is to analyze and explain the formation and character of presbyterian missionary architecture in Andong area from 1900 to 1945, which we may call "the modem architecture of Korea". I have surveyed and analyzed the 26 buildings. and so, the major findings of this study are as follows. Firstly, the phase of building is 1) buy the existing Korean traditional building and lot-a thatch roofed house. 2) modify the existing Korean traditional building-a thatch and tile roofed hose. 3) build the Korean style building-a thatch and tile roofed building. 4) build the Western style Building-a timber structured and zinc roofed building. 5) build the Western style Building- a masonry structured and zinc(or tile)roofed building. Secondly, the character of building is 1) In the Korean traditional building, the missionaries change the function for their purpose-office, church, school, hospital. they modify the existing Korean timber frame construction by introducing the material-brick, plaster, glass, Japanese style timber etc .. they live in the Korean existing residential area. 2) In the Western style building, the missionaries build the house according to their life style. they build the timber structured building-church, and the masonry (brick or stone)structured building such as a house, church, school and dormitory, and hospital. their building located on the hill depart from the existing Korean residential area.

  • PDF

An Evaluation of Seismic Performance for Existing School Building Using Capacity Spectrum Method (성능스펙트럼법을 이용한 기존 학교 건축물의 내진성능평가 및 보강효과 검증)

  • Jang, Jeong-Hyun;Hwang, Ji-Hoon;Yang, Kyeong-Seok;Takashi, Kamiya;Choi, Jae-Hyouk
    • Journal of Advanced Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.11-18
    • /
    • 2012
  • Large scale earthquake was occurred in different parts of the world like Japan (in 1995), Republic of Pakistan (2005), in China (2008) etc and enormous structures were damaged. As a result of collapse of school buildings structures numerous students are died and it had a big impact on the international community. Therefore, the interest of preparing the seismic resistant school building structures in our country is increases as school building are used as emergency shelter for local residents. But the current standard of seismic design ratio of 3.7% is applied for school building in Korea which is only significant earthquake damage is expected. In order to overcome the current situation, seismic performance evaluation is carried out for the existing school building and an accurate and appropriate seismic retrofit is required based on performance evaluation to upgrade the existing school buildings. In this paper, nonlinear analysis on existing school buildings for ATC-40(Applied Technology Council, ATC) and FEMA-356(Federal Emergency Management Agency, FEMA) are carried out using the capacity spectrum method to evaluate seismic performance and to determine the need for retrofitting. In addition, after reinforcement to enhance the seismic performance is applied the seismic performance evaluation is carried out to verify the effectiveness of seismic retrofit.

A Proposal of Energy Retrofitting Methods for Small-to-Medium Existing Building (중소규모 기존 건물의 에너지 개수 방법에 관한 실증연구)

  • Jeong, Hee-Gyu;Lee, Young-Jae;Song, Doo-Sam
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.286-292
    • /
    • 2012
  • In recent years, building energy has received much attention and there are many support system to reduce building energy consumption. In addition, It is clear that encouraging to energy efficiency investments can be beneficial to our society, because of the energy supply instability and higher energy price in Korea. Nevertheless, ESCO business, represent the existing building energy retrofit business, hardly has not expanded in Korea. besides, in the case of existing building, it is more difficult to achieve the energy retrofit measures than new building, due to the existing buildings have attributes such as a long life and a lots of energy factor, etc. Therefore, for activate ESCO business and expand ESCO bussiness target to small-to-medium building, it is needed to optimization of retrofitting methods for existing small-to medium buildings in Korea. this research was to derive energy retrofit methods through the energy audit and analysis performed for a small-to-medium building located in Suwon, Korea.

  • PDF

The Improvement of Building Envelope Performance in Existing School Building (기존 학교 건물의 외피 성능 개선 방안에 관한 연구)

  • Bang, Ah-Young;Park, Se-Hyeon;Kim, Jin-Hee;Kim, Young-Jae;Kim, Jun-Tae
    • KIEAE Journal
    • /
    • v.15 no.4
    • /
    • pp.69-76
    • /
    • 2015
  • Purpose: This study is to investigate the effects of facade insulation and window remodeling of an existing old middle school building on the reduction of energy consumption. Method: To analyze energy performance of building, using DesignBuilder v3.4, building energy simulation tool based EnergyPlus engine. Energy consumption and problem of target building was analyzed based on data and survey. Based on building energy simulations it analyzed the variation of energy demand for the building according to U-value of wall, glazing properties and external shading devices. Result: When insulation of building was reinforced, cooling and heating load was decreased. Glazing properties that minimize cooling and heating energy consumption were analyzed. In conclusion, it is important to choose SHGC and U-value of window fit in characteristic of target building. Setting external blind for cooling load decreases 5%.

Proposal of the Energy Retrofit in a Small Sized Office Building and its Application (기존 건물의 에너지 개수방법의 제안 및 사례연구)

  • Jeong, Hee-Gyu;Park, Jun-Won;Lee, Young-Jae;Song, Doo-Sam
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.9
    • /
    • pp.663-670
    • /
    • 2012
  • Recently, energy saving in building sector is of great important to meet national $CO_2$ reduction goals in Korea. In this sense, it is crucial to improve the energy performance for existing building. The energy efficiency investments, ESCO business, can be beneficial to expand the chance of energy retrofit for existing building. However, ESCO business hardly expand in Korea because it has many limitations in guarantee for energy saving. Also, it is more difficult to apply the energy retrofit measures in existing building than new building. Therefore, the retrofitting methods for existing small-and medium-sized buildings should be improved to initiate ESCO business and expand it in Korea. In this study, the energy retrofit methods for small sized office building were suggested and the case study for a small sized office building located in Suwon was accomplished.

Proposed Seismic Performance Evaluation Enhancement for Existing School Building (기존 학교 건축물의 내진성능평가 및 보강방안 제안)

  • Hwang, Ji-Hoon;Jang, Jeong-Hyun;Yang, Kyeong-Seok;Choi, Jae-Hyouk
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.19 no.4
    • /
    • pp.29-38
    • /
    • 2012
  • Recently large scale earthquake s are occurred around the world following the damage of buildings. So the interest of preparing for earthquake seismic design and seismic performance has becoming high. School buildings are though used for educational purpose; they are also used as emergency shelter for local residents during earthquake disaster. However, the current seismic design ratio of our country (Korea) is 3.7% and if massive earthquake is occurred it follows a serious damage. In order to overcome this situation, seismic performance evaluation is carried out for existing school building and an accurate and appropriate seismic retrofit is required based on performance evaluation to upgrade the existing school buildings. In this paper, nonlinear static analysis on existing school buildings for ATC-40 and FEMA-356 are carried out using the capacity spectrum method to evaluate seismic performance and to determine the need for retrofitting. In addition, after reinforcement to verify the effect of retrofit enhance the seismic performance is applied the seismic performance evaluation is carried out to verify the effect of seismic retrofit time history analysis using nonlinear dynamic analysis is also performed and nonlinear behavior of earthquake load of seismic retrofit of structures was also investigated.

Development of Standard Agreement for a School Complex Project (학교시설 복합화를 위한 표준협약서 개발)

  • Park, Sung-Chul;Park, Hee-Won;Jung, Tae-Hwan
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.2
    • /
    • pp.1-12
    • /
    • 2014
  • A school building complex means building both the learning spaces of students and convenience space of community within school lands. The projects have has a positive effect on saving the national budget as well as expanding the learning spaces. The absence of standard agreement contracted through discussion of participants, however, has made many problems in the operated projects. Through analysis on the previous researches and conference, the paper finds main problems discussed in the operating step. And, the feasibility study is carried out in order to analyze the appropriateness of on the existing agreements on the problems. Finally, the paper presents the standard agreement for the school building complex projects. The practitioners can prevent the existing problems from new projects through using the proposed agreement. Furthermore, it is expected that the school building complex projects will be activated.

AUTOMATIC AS-IS BIM EXTRACTION FOR SUSTAINABLE SIMULATION OF BUILT ENVIRONMENTS

  • Chao Wang;Yong K. Cho
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.47-51
    • /
    • 2013
  • Existing buildings now represent the greatest opportunity to improve building energy efficiency. Building performance analysis is becoming increasingly important because decision makers can have a better visualization of their building's performance and quickly make the solution for improving building energy efficiency and reducing environmental impacts. Nowadays, building information models (BIMs) have been widely created during the design phase of new buildings, and it can be easily imported to third party software to conduct various analyses. However, a BIM is not always available for all existing buildings. Even if a BIM is available during the design and construction phases, it is very challenging to keep updating it while a building is aged. A manual process to create or update a BIM is very time consuming and labor intensive. A laser scanning technology has been a popular tool to create as-is BIM. However it still needs labor-intensive manual processes to create a BIM out of point clouds. This paper introduces automatic as-is simplified BIM creation from point clouds for energy simulations. A framework of decision support system that can assist decision makers on retrofits for existing buildings is introduced as well. A case study on a residential house was tested in this study to validate the proposed framework, and the technical feasibility of the developed system was positively demonstrated.

  • PDF

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF