• Title/Summary/Keyword: Excessive displacement

Search Result 203, Processing Time 0.022 seconds

Analysis of underground post-tensioned precast concrete box utility tunnel under normal fault displacement

  • Wu, Xiangguo;Nie, Chenhang;Qiu, Faqiang;Zhang, Xuesen;Hong, Li;Lee, Jong-Sub;Kang, Thomas H.K.
    • Computers and Concrete
    • /
    • v.29 no.2
    • /
    • pp.69-79
    • /
    • 2022
  • For long underground box utility tunnels, post-tensioned precast concrete is often used. Between precast tunnel segments, sealed waterproof flexible joints are often specified. Fault displacement can lead to excessive deformation of the joints, which can lead to reduction in waterproofing due to diminished contact pressure between the sealant strip and the tunnel segment. This paper authenticates utilization of a finite element model for a prefabricated tunnel fault-crossing founded on ABAQUS software. In addition, material parameter selection, contact setting and boundary condition are reviewed. Analyzed under normal fault action are: the influence of fault displacement; buried depth; soil friction coefficient, and angle of crossing at the fault plane. In addition, distribution characteristics of the utility tunnel structure for vertical and longitudinal/horizontal relative displacement at segmented interface for the top and bottom slab are analyzed. It is found that the effect of increase in fault displacement on the splice joint deformation is significant, whereas the effects of changes in burial depth, pipe-soil friction coefficient and fault-crossing angle on the overall tunnel and joint deformations were not so significant.

Lateral Load Test for Various Aseismatic Methods of Pile Heads of Pier Type Quay Walls (잔교식 안벽의 말뚝 두부 내진 보강기법에 따른 수평재하실험)

  • 이용재;한진태;장인성;김명모
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.98-106
    • /
    • 2003
  • To construct pile-supported wharf structures that must support heavy horizontal loads, both vertical piles and batter piles are used. Batter piles are used to secure the bearing capacity against the horizontal loads. However, past case histories have shown that the heads of batter piles are vulnerable because these heads are subjected to excessive axial loads during earthquakes. Therefore, the aseismatic reinforcement method must be developed to prevent batter pile heads from breaking due to excessive seismic loads. Two different connecting methods of either inserting rubber or ball-bearing between batter pile head and upper plate were proposed to improve the aseismatic efficiency. Three large-scale pile head models(rubber type model, ball-bearing type model, and fixed type model) were manufactured and horizontal loading tests were peformed for these models. The results showed that the force-displacement relationship of the fixed type model was linear, but that of the rubber type model and the ball-bearing type model was bilinear. The increase in the horizontal displacement led to the increase in the horizontal stiffness of the rubber type models and the decrease in that of the ball-bearing type model. Compared with the values for fixed type model, the damping ratios of the rubber type model and the ball-bearing type model increased about 33~185% and 263~269%, respectively.

  • PDF

A case study on excessive displacements occurred in the tunnels caused by rainfall (강우로 인한 터널내부 과다변위 사례 연구)

  • Kim, Nag-Young;Kim, Hong-Jong;Oh, Young-Seok;Kim, Chang-Yong;Yang, Tae-Sun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.561-573
    • /
    • 2012
  • Recently, tunnel constructions have been increased in Korea. According to the increment of tunnel constructions, cases of tunnel collapses also have been increased under tunnel construction. Among these tunnel collapses, after a certain amount of time has elapsed due to excessive displacements on slope of tunnel exit or entrance, cases of tunnel collapse have been increased rapidly. Therefore, the case study was conducted in this study to figure out factors effect on the tunnel collapses due to excessive displacements on tunnel exit or entrance slopes. Base on the case study, the fragmental zone of fault and the rainfall were most important factors on the collapse.

Effects of Strut Preloading on the Restraining of Adjacent Ground Displacement at Braced Excavations (버팀 굴착시 버팀대 선행하중의 인접지반 변위 억제 효과)

  • 백규호;조현태
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.1
    • /
    • pp.31-40
    • /
    • 1999
  • The bracing system using screw jack is not effective for the restraining of adjacent ground displacement. since the screw jack dose not induce sufficient preloading on struts. In order to protect excessive displacement of adjacent ground at braced excavation, new preloading jack was developed in the country. In this paper, the new preloading jack and the measurement results of the lateral displacement of braced wall at three deep excavation sites in Seoul city are introduced. The measurement results showed that the maximum displacements of braced wall are smaller than 0.15% of excavation depth, therefore the wall displacements can be minimized by preloading which is acted on bracing. If the bracing system with new preloading jack is used in braced excavation, it is effective for reducing the cost and period of construction.

  • PDF

Numerical Study on the Behavior of Corner Areas in Excavation Site (굴착 모서리부 거동에 대한 수치해석 연구)

  • Seok, Jeong-Woo;Hwang, Dae-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.757-764
    • /
    • 2004
  • This paper deals with the numerical study on the displacement behavior of corner areas in an excavation site. Several corner areas always exist in the excavation site. The corner area has two free surfaces, which may become serious weak point from the viewpoint of structural stability. If the structural reinforcements are not applied adequately in corner areas, significant displacement of retaining wall could occur. What is worse, the collapse of retaining system rarely happens. In this paper, 3D numerical analyses were performed to investigate the effect of the arrangement of diagonal and normal strut. From the analysis results, it is found that the spacing between diagonal strut and normal strut should be less than 4m to avoid excessive displacement due to excavation.

  • PDF

Electrical Resistivity Survey at the Ground with Micro-subsidence by Excessive Pumping of Groundwater (지하수 과잉양수에 따른 미세 지반변형 지역에서의 전기비저항 탐사)

  • Song Sung-Ho;Lee Kyu-Sang;Yong Hwan-Ho;Kim Jin-Ho
    • Geophysics and Geophysical Exploration
    • /
    • v.7 no.3
    • /
    • pp.197-206
    • /
    • 2004
  • Because the minute displacement of ground accompanied by excessive pumping of groundwater at specified site is mainly generated from ill-balancing of water budget within groundwater basin, It is necessary to monitor the variation of micro-subsidence for a long time at representative points. We made up the conceptual model using two-dimensional electrical resistivity survey and three-dimensional soil profile consisted of loam and sand. In verifying the reliability of this conceptual model using numerical modeling for ground settlement and groundwater flowing, two-dimensional electrical resistivity survey with short distance of electrode following soil sampling with hand auger would be useful for interpreting hydrogeological structure related to the minute displacement of ground consisted of loam and sand.

Effects of Taping the Lower Back on the Lumbopelvic Region and Hip Joint Kinematics During Sit-to-Stand

  • Kim, Si-Hyun;Park, Kyue-Nam;Kwon, Oh-Yun;Choi, Houng-Sik
    • Physical Therapy Korea
    • /
    • v.21 no.4
    • /
    • pp.49-55
    • /
    • 2014
  • Excessive lumbar flexion during sit-to-stand (STS) is a risk factor for lower back pain. Postural taping can prevent unwanted flexion of the lumbar spine. This study aimed to demonstrate the effect of taping the lower back on the lumbopelvic region and hip joint kinematics during STS. Sixteen healthy subjects participated. All subjects performed the STS with and without taping of the lower back. A three-dimensional motion analysis system was used to measure the kinematics of the lumbar spine, pelvis, and hip joint during STS. The angle of the peak lumbar flexion, pelvic anterior tilting, and hip flexion and angular displacement of the lumbar spine between starting position and maximal lumbar flexion were collected. Paired t-tests, or Wilcoxon's rank-sum test for non-parametric distribution, were used to assess differences in the measurements with and without taping. A p-value <.05 was taken to indicate a significant difference. Significant differences were observed in the angle of the peak lumbar flexion, pelvic anterior tilting, hip flexion and angular displacement of the lumbar spine (p<.05). Taping was associated with a significant decrease in the angle of peak lumbar flexion and angular displacement of the lumbar spine between the starting position and maximal lumbar spine flexion. In addition, the peak angle of pelvic anterior tilting and hip flexion were significantly increased with taping. The findings of this study suggest that taping the lower back can decrease excessive lumbar flexion, and increase the pelvic anterior tilting and hip flexion motion during STS.

A Probabilistic Study on Seismic Response of Seismically Isolated Nuclear Power Plant Structures using Lead Rubber Bearing (LRB 면진장치를 적용한 원전구조물의 지진응답에 따른 확률론적 연구)

  • Kim, Hyeon-Jeong;Song, Jong-Keol;Moon, Ji-Ho
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.2
    • /
    • pp.45-54
    • /
    • 2018
  • The seismically isolated nuclear power plants shall be designed for design basis earthquake (DBE) and considered to ensure safety against beyond design basis earthquake (BDBE). In order to limit the excessive displacement of the seismic isolation system of the seismically isolated structure, the moat is installed at a certain distance from the upper mat supporting the superstructure. This certain distance is called clearance to stop (CS) and is calculated from the 90th percentile displacement of seismic isolation system subjected to BDBE. For design purposes, the CS can be obtained simply by multiplying the median displacement of the seismic isolation system against DBE by scale factor with a value of 3. The DBE and BDBE used in this study were generated by using 30 sets of artificial earthquakes corresponding to the nuclear standard design spectrum. In addition, latin hyper cube sampling was applied to generate 30 sets of artificial earthquakes corresponding to maximum - minimum spectra. For the DBE, the median displacement and the 99th percentile displacement of the seismic isolation system were calculated. For the BDBE, the suitability of the scale factor was assessed after calculating the 90th percentile displacement of the seismic isolation system.

Effects of Anchor Block on Stability of Concrete Electric Pole (콘크리트전주의 안정성에 미치는 근가의 영향)

  • Ahn, Tae-Bong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.11
    • /
    • pp.5-10
    • /
    • 2012
  • Many electric poles in the softground have been collapsed due to external load. In this study, several tests were performed with variation of numbers and depths of anchor blocks to find effects of anchor blocks on stability of concrete electric poles through earth pressure and displacement analysis. 1.50m depth of anchor block seems appropriate among three kinds of depths. The 2.25m depth of anchor block makes larger displacement due to disturbance caused by excessive excavation. The deeper anchor block, the less earth pressure of passive zone, an active earth pressure gets larger. When two anchor blocks were installed, displacement at top pole decreased 43.8% and 55.6% at ground when 1 anchor block was installed.

The Allowable Displacement Limit on the Approach Slab for a Railway Bridge with Ballastless Track (콘크리트궤도부설 교량의 접속슬래브 허용변위한도에 관한 연구)

  • Choi, Jin-Yu;Yang, Shin-Chu;Yoo, Jin-Young;Cho, Hyun-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1149-1155
    • /
    • 2007
  • The transition area between a bridge and an earthwork is one of the weakest area of track because of the track geometry deterioration caused unequal settlement of backfill of abutment. In case of a ballastless track, the approach slab is installed to prevent the phenomenon. But, if there is occurred the inclined displacement on the approach slab by a settlement of the foundation or formation, the track is also under the inclined displacement. And this defect causes reducing the running stability of a vehicle, the riding comfort of passengers, and the deteriorations of track by excessive impact subjected to the track. In this study, parametric studies were performed to know what is the allowable displacement limit on the approach slab to avoid such a bad effect. The length and amount of unequal settlement of the approach slab was adopted as parameter for numerical analysis. And car body accelerations, variations of wheel force and rail stress and uplift force induced on a fastener clip are investigated. From the result, resonable settlement limits of an approach slab according to slab length was suggested.

  • PDF