Development of penetration rate prediction model using shield TBM excavation data (쉴드 TBM 현장 굴진데이터를 이용한 굴착속도 예측모델 개발)

  • La, You-Sung;Kim, Myung-In;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.519-534
    • /
    • 2019
  • Mechanized tunneling methods, including shield TBM, have been increasingly used for tunnel construction because of their relatively low vibration and noise levels as well as low risk of rock-falling accidents. In the excavation using the shield TBM, it is important to design penetration rate appropriately. In present study, both subsurface investigation data and shield TBM excavation data, produced for and during ${\bigcirc}{\bigcirc}{\sim}{\bigcirc}{\bigcirc}$ high-speed railway construction, were analyzed and used to compare with shield TBM penetration rates calculated using existing penetrating rate prediction models proposed by several foreign researchers. The correlation between thrust force per disk cutter and uniaxial compressive strength was also examined and, based on the correlation analysis, a simple prediction model for penetration rate was derived. The prediction results using the existing prediction models showed approximately error rates of 50~500%, whereas the results from the simple model proposed from this study showed an error rate of 15% in average. It may be said, therefore, that the proposed model has higher applicability for shield TBM construction in similar ground conditions.

Comprehensive Monitoring System for the Prediction of Failure Behavior and the Ground Control of Large Scale Underground Excavation (대규모 지하공동의 파괴거동 예측 및 지반제어를 위한 종합시스템)

    • Tunnel and Underground Space
    • /
    • v.8 no.2
    • /
    • pp.130-138
    • /
    • 1998
  • Comprehensive monitoring system for the safe and economical excavation of underground opening has been established by employing the 3 independent models each of which can i) predict the ultimate convergence, ii) assess the in-situ stresses and the elastic modulus of excavating rock, iii) calculate the time-dependent opening behavior with respect to the face advance rate and support pressure at the equilibrium state. Accuracy of each model has been verified through illustrative examples. The step-by-step procedures of comprehensive monitoring system for analyzing the rock behavior and the optimum support installation has been explained. The capability and applicability of this system to the practical excavation also has been discussed.

  • PDF

Experimental and numerical study on performance of long-short combined retaining piles

  • Xu, Chang J.;Ding, Hai B.;Luo, Wen J.;Tong, Li H.;Chen, Qing S.;Deng, Jian L.
    • Geomechanics and Engineering
    • /
    • v.20 no.3
    • /
    • pp.255-265
    • /
    • 2020
  • Laboratory tests are conducted to investigate the performance of retaining system with different combinations of long-short piles. Numerical analysis implemented using ABAQUS are verified by comparing numerical results with measured data. By performing numerical studies, the horizontal displacement of piles, heave of excavation bottom and bending moment of pile for various pile system with different pile lengths are investigated. Results show that long piles share higher bending moments than short piles. The increase in the number of short piles leads to a slight increase in the heave at excavation bottom for long-short pile retaining system. Retaining system with different long and short pile combinations have greater effects on the horizontal displacement of pile above the excavation bottom, compared to its counterparts below excavation bottom. For a given length of long pile, the bending moment and displacement of piles increase with the decrease in length of short piles, while the increasing rate of maximum moment of retaining pile system is insignificant. Results highlight that a reliable and economical pile retaining system can be designed by optimizing the number and length of short piles, provided that the working performance of retaining structures above excavation bottom meets the design requirement in practice.

A Study of Weighing System to Apply into Hydraulic Excavator with CNN (CNN기반 굴삭기용 부하 측정 시스템 구현을 위한 연구)

  • Hwang Hun Jeong;Young Il Shin;Jin Ho Lee;Ki Yong Cho
    • Journal of Drive and Control
    • /
    • v.20 no.4
    • /
    • pp.133-139
    • /
    • 2023
  • A weighing system calculates the bucket's excavation amount of an excavator. Usually, the excavation amount is computed by the excavator's motion equations with sensing data. But these motion equations have computing errors that are induced by assumptions to the linear systems and identification of the equation's parameters. To reduce computing errors, some commercial weighing system incorporates particular motion into the excavation process. This study introduces a linear regression model on an artificial neural network that has fewer predicted errors and doesn't need a particular pose during an excavation. Time serial data were gathered from a 30tons excavator's loading test. Then these data were preprocessed to be adjusted by MPL (Multi Layer Perceptron) or CNN (Convolutional Neural Network) based linear regression models. Each model was trained by changing hyperparameter such as layer or node numbers, drop-out rate, and kernel size. Finally ID-CNN-based linear regression model was selected.

Analysis of Monthly Excavation Length Depending on Ground Condition and TBM Diameter (터널 보링 머신 공법 구경별 지질조건에 따른 월굴진장 분석)

  • Choi, Jae Jin;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.141-150
    • /
    • 2014
  • This study analyzed monthly excavation length and amount of time occupied by the work item based on drilling reports to record the entire work process of TBM tunnel site. TBM equipment( ${\varnothing}2.6m$, ${\varnothing}3.0m$, ${\varnothing}3.5m$, ${\varnothing}3.8m$) was developed by WIRTH company in Germany. In addition, This study analyzed rising expected monthly excavation length based on the lowest loss rate of operating shifts among the field of nine. Analysis results are confident to be a useful tool when Planning and Managing TBM method construction to the primary planning steps in the field similar to geological conditions and analyzed geological conditions.

Suggestion of empirical formula between FPI and specific energy through analysis of subsea tunnel excavation data (해저 터널 굴진자료 분석을 통한 FPI와 비에너지의 경험식 제시)

  • Kim, Kyoung-Yul;Bae, Du-San;Jo, Seon-Ah;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.687-699
    • /
    • 2018
  • The construction of subsea tunnel differs from that of inland tunnel because of high water pressure due to sea water level and difficulties to reinforce the ground under construction. Therefore, it is very important to prevent trouble in advance when the subsea tunnel is constructed. In this paper, we established lots of databases about characteristics of geological and mechanical parameters on the construction of subsea tunnel using micro slurry TBM which depth is about 60 m. The correlation analysis is conducted to confirm the effect of thrust, torque and RPM among the excavation database on the net penetration rate. Also, An empirical formula is suggested to predict the net penetration rate through the correlation analysis between FPI (Field Penetration Index) and specific energy from the subsea tunnel excavation database.

The Plan Types of Excavation Remains during the Mid to Late Joseon Period around Jong-ro in Seoul (서울 종로 주변 발굴유적에서 보이는 조선 중·후기 건물지의 평면형식)

  • Bae, Chang-Hyun;Jeon, BongHee;Huh, Yoojin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.5
    • /
    • pp.79-88
    • /
    • 2018
  • The purpose of this study is to analyze the plan type of excavation remains during the Mid to Late Joseon period around Jong-ro area in Seoul. 523 building remains were selected in accordance with plan type could identified through the excavation investigation report. Among these, 276 building remains were verified to the $15-16^{th}$, 145 and 102 building were verified to the 17-18th and the $19^{th}$ century. By classifying excavation remains, four dominant plan type of the each century came out. First, -shape was the most common plan type took nearly 50 percent. In a considerable proportion of cases, this plan type seems an annex of main building. However, -shape plan type also seemed to be used for main building in some cases. ㄱ and ㄷshape plan type took the second and the third. In most cases, these types seemed typical plan used for a main housing building. For the last, ㅁshape plan type identified the most unusual. This plan type merely took under five percent but, these cases are meaningful because it shows the plan alteration from ㄷshape to ㅁshape plan type. Existence proportion between each plan types of the $15-16^{th}$ century were continued to the $18-19^{th}$century without small changes between -and ㄱ types in $17-18^h$ century. By examining selected excavation remains, installing front Toi space on ㄱ, ㄷ and ㅁshape plan type stand out clearly compared with -shape plan type. From this tendency, it could be considered that plan type became a significant factor influenced installing Toi space. Similar to periodical tendency of plan type was not changed dramatically, the rate of installing Toi space in the $15-16^{th}$ century was not changed much until the $18-19^{th}$ century. It also shows the close relation between plan type and installing Toi space. In some excavation remains, floor type in the $15-16^{th}$ century also verified. There are some points of similarities on installing typical location of On-dol, Ma-ru and Bu-eok in these excavation remains with later period housing type such as Ut-Bang-Gguk-Oem-Jib and Ddeul-Jib.

A Study on the Excavation Damage Zone (EDZ) under TBM Advancement Based on Large Deformation Technique (Coupled Eulerian-Lagrangian) (대변형 해석기법(Coupled Eulerian-Lagrangian Technique)을 이용한 TBM 굴착손상영역 분석)

  • Lee, Seung-Yeon;Kim, Do-Hyun;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.12
    • /
    • pp.5-13
    • /
    • 2016
  • In this study, Coupled Eulerian-Lagrangian (CEL) analysis, which is one of the large deformation analyses, was incorporated to investigate excavation damage zone (EDZ) under TBM advancement. Considering the quasi-static condition, the dynamic analysis was performed to simulate the real TBM advancement and subsequently a case study on mesh and TBM excavation rate was carried out for satisfying a balance of accuracy and economic computational time. Based on this, a series of parametric studies were performed for different rock types and tunnel diameters. From the numerical analysis results, it is found that EDZ was taken to range within 0.4D(D=tunnel diameter) for most rocks. It is also found that the EDZ tends to increase as the tunnel diameter increases.

Sequential prediction of TBM penetration rate using a gradient boosted regression tree during tunneling

  • Lee, Hang-Lo;Song, Ki-Il;Qi, Chongchong;Kim, Kyoung-Yul
    • Geomechanics and Engineering
    • /
    • v.29 no.5
    • /
    • pp.523-533
    • /
    • 2022
  • Several prediction model of penetration rate (PR) of tunnel boring machines (TBMs) have been focused on applying to design stage. In construction stage, however, the expected PR and its trends are changed during tunneling owing to TBM excavation skills and the gap between the investigated and actual geological conditions. Monitoring the PR during tunneling is crucial to rescheduling the excavation plan in real-time. This study proposes a sequential prediction method applicable in the construction stage. Geological and TBM operating data are collected from Gunpo cable tunnel in Korea, and preprocessed through normalization and augmentation. The results show that the sequential prediction for 1 ring unit prediction distance (UPD) is R2≥0.79; whereas, a one-step prediction is R2≤0.30. In modeling algorithm, a gradient boosted regression tree (GBRT) outperformed a least square-based linear regression in sequential prediction method. For practical use, a simple equation between the R2 and UPD is proposed. When UPD increases R2 decreases exponentially; In particular, UPD at R2=0.60 is calculated as 28 rings using the equation. Such a time interval will provide enough time for decision-making. Evidently, the UPD can be adjusted depending on other project and the R2 value targeted by an operator. Therefore, a calculation process for the equation between the R2 and UPD is addressed.

Variation of abrasive feed rate with abrasive injection waterjet system process parameters (연마재 투입형 워터젯 시스템의 공정 변수에 따른 연마재 투입량 변화)

  • Joo, Gun-Wook;Oh, Tae-Min;Kim, Hak-Sung;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.141-151
    • /
    • 2015
  • A new rock excavation method using an abrasive injection waterjet system has been developed to enhance the efficiency and reduce the vibration of tunnel excavation. The abrasive feed rate is an important factor for the cutting performance and the economical efficiency of waterjet-based excavation. In this study, various experiments were performed to explore the effects of major process parameters for both the abrasive feed rate and the suction pressure occurring inside the mixing chamber when the abrasives are inhaled. Experimental results reveal that the abrasive feed rate is affected by geometry parameters (abrasive pipe height, length, and tortuosity), abrasive parameters (abrasive particle size), and jet energy parameters (water pressure and water flow rate). In addition, the relation between the cutting performance and the abrasive feed rate was discussed on the basis of the results of an experimental study. The cutting performance can be maximized when the abrasive feed rate is controlled appropriately via careful management of major process parameters.