Japanese government college researchers, including Sekino Tadashi(關野貞), have conducted research studies and collected data, on overall Korean cultural relics as well as Silla tumuli(新羅古墳) in the early modern times under the Japanese imperialistic rule. They were supported by the Meichi government in the early stage of research, by the Chosun government-general, and by their related organizations after Korea was coIonialized to carry out investigations on Korean antiquities, fine arts, architecture, anthropology, folklore, and so on. The objective for which they prosecuted inquiries into Korean cultural relics, including Silla tumuli, may be attributed to the purport to find out such data as needed for the theoretical foundation to justify their colonialization of Korea. Such a reason often showed locally biased or distorted views. Investigations and surveys had been incessantly carried out by those Japanese scholars who took a keen interest in Korean tumuli and excavated relics since 1886. 'Korea Architecture Survey Reports' conducted in 1904 by Sekino in Korea gives a brief introduction of the contents of Korean tumuli, including the Five Royal Mausoleums(五陵). And in 1906 Imanishi Ryu(今西龍) launched for the first time an excavation survey on Buksan Tumulus(北山古墳) in Sogeumgangsan(小金剛山) and on 'Namchong(南塚)' in Hwangnam-dong, which greatly contributed to the foundation of a basic understanding of Wooden chamber tombs with stone mound(積石木槨墳) and stone chambers with tunnel entrance(橫穴式石室墳). The ground plan and cross section of stone chambers made in 1909 at his excavation survey of seokchimchong(石枕塚) by Yazui Seiyichi(谷井第一) who majored in architecture made a drawing in excavation surveys for the first time in Korea, in which numerical expressions are sharply distinguished from the previous sketched ones. And even in the following excavation surveys this kind of drawing continued. Imanishi and Yazui elucidated that wooden chambers with stone mound chronologically differs from the stone chambers with tunnel entrance on the basis of the results of surveys of the locational characteristics of Silla tumuli, the forms and size of tomb entrance, excavated relics, and so forth. The government-general put in force 'the Historic Spots and Relics Preservation Rules' and 'the Historic Spots Survey Council Regulations' in 1916, establishing 'Historic Spots Survey Council and Museum Conference. When museums initiated their activities, they exhibited those relics excavated from tumuli and conducted surveys of relics with the permission of the Chosun government-general. A gold crown tomb(金冠塚) was excavated and surveyed in 1921 and a seobong tomb(瑞鳳塚) in 1927. Concomitantly with this large size wooden chamber tombs with stone mound attracted strong public attention. Furthermore, a variety of surveys of spots throughout the country were carried out but publication of tumuli had not yet been realized. Recently some researchers's endeavors led to publish unpublished reports. However, the reason why reports of such significant tumuli as seobong tomb had not yet been published may be ascribed to the critical point in those days. The Gyeongju Tumuli Distribution Chart made by Nomori Ken(野守健) on the basis of the land register in the late 1920s seems of much significance in that it specifies the size and locations of 155 tumuli and shows the overall shape of tumuli groups within the city, as used in today's distribution chart. In the 1930s Arimitsu Kyoichi(有光敎一) and Saito Tadashi(齋藤忠) identified through excavation surveys of many wooden chamber tombs with stone mound and stone chambers with tunnel entrance, that there were several forms of tombs in a tomb system. In particular, his excavation survey experience of those wooden chamber tombs with stone mound which were exposed in complicated and overlapped forms show features more developed than that of preceding excavation surveys and reports publication, and so on. The result of having reviewed the contents of many historic spots surveyed at that time. Therefore this reexamination is considered to be a significant project in arranging the history of archaeology in Korea.
Accurate prediction of mixed ground conditions ahead of a tunnel face is of vital importance for safe excavation using tunnel boring machines (TBMs). Previous studies have primarily focused on electrical resistivity surveys from the ground surface for geotechnical investigation. In this study, an FE (finite element) numerical model was developed to simulate electrical resistivity surveys for the prediction of risky mixed ground conditions in front of a tunnel face. The proposed FE model is validated by comparing with the apparent electrical resistivity values obtained from the analytical solution corresponding to a vertical fault on the ground surface (i.e., a simplified model). A series of parametric studies was performed with the FE model to analyze the effect of geological and sensor geometric conditions on the electrical resistivity survey. The parametric study revealed that the interface slope between two different ground formations affects the electrical resistivity measurements during TBM excavation. In addition, a large difference in electrical resistivity between two different ground formations represented the dramatic effect of the mixed ground conditions on the electrical resistivity values. The parametric studies of the electrode array showed that the proper selection of the electrode spacing and the location of the electrode array on the tunnel face of TBM is very important. Thus, it is concluded that the developed FE numerical model can successfully predict the presence of a mixed ground zone, which enables optimal management of potential risks.
Journal of Korean Tunnelling and Underground Space Association
/
v.24
no.3
/
pp.279-292
/
2022
Unexpected anomalies in the geotechnical investigation at design stage may cause problems during tunnel excavation. Therefore, it is important to predict the ground condition ahead of a tunnel face during tunnel excavation in order to prevent tunnel collapse. Despite the fulfillment of an electrical resistivity survey at the tunnel face, the existing electrical resistivity survey program can produce distorted results by the limitation of tunnel modelling. In this background, this study develops a modelling program for an electrical resistivity survey considering the tunnel shape. Numerical simulation and inverse calculation were performed for the electrical resistivity survey in the tunnel using the developed program. As a result, it was proved that the developed program could predict accurately the anomalous object's location and condition ahead of the tunnel face.
Journal of Korean Tunnelling and Underground Space Association
/
v.19
no.3
/
pp.489-501
/
2017
The collapse accidents during a open ground excavation in urban areas not only lead to human injuries and material damages in the construction site, but also lead to road sinks and damages to the adjacent facilities due to settlement of ground around the construction site. Therefore, during a open ground excavation in the urban areas, it is necessary to thoroughly prepare for prevention of collapse accidents, and consider whole construction stage such as planning, design and construction. In this study, the priorities to be managed mainly were obtained in order to prevent collapse accidents during a open ground excavation. After analyzing results from past accidents cases for open ground excavations, priorities were evaluated regarding collapse-inducing elements using the Delphi technique which is a decision-making method by consensus among experts. As a result, insufficient groundwater treatment, bad geotechnical investigation and instability on construction, etc. were obtained as priorities for prevention of collapse accidents.
The video production, as a recording data about the archeological survey, has advantages to be visualized in actuality and historical fact presented objects with elements such as moving images, audio(voice) and text(subtitle). While the report with text and images such as photographs and drawings does not present exactly, the video production can record a concrete excavation process to be difficult of represent with former media. To make a practical use the video production in archeological surveys, the use dimension should be expanded to the entire archeological excavations and the shooting and editing work should be done by those video production-specialized staffs. Ultimately, when this video production device is used but also for the survey purposes but also for the education, exhibition, and even commercial purposes, it can have the substantial meaning as a survey tool.
This article was prepared for the purpose of reviewing maintenance plans and strategies for designating the celadon kiln site in Banam-ri, Gochang, a monument designated by the city and province as a historical site. Prior to the discussion, the high academic potential of this site, which is attracting attention as a main point of early celadon main point, was explained, and expectations for the future designation of the monument were reviewed. Next, the current status of preservation and maintenance plans of the celadon kiln site in Banam-ri, Gochang were examined. In particular, the current preservation situation was reviewed through an on-site survey on how the ruins, which have not been designated as a monument, should be maintained for historical designation in the future. Above all, it was argued that it was necessary to conduct excavation and literature surveys to clarify the characteristics of the ruins, investigate the surrounding areas, improve information facilities for visitors, and carry out promotion in connection with them. Finally, the definition of historical sites and the status of historical designation of ceramic kilns, along with the strategies necessary for designation, were presented. In particular, the examples of the existing historical designated celadon kiln site in Dotong-ri, Jinan, and Buncheong Kiln Site in Undae-ri, Goheung were reviewed, and three types of excavation surveys, literature surveys, and academic conferences were presented as the target directions for historical designation. The result of the excavation survey is the basis for suggesting that it has cultural property values with completeness, authenticity, and identity. The literature survey is the basis for supplementing the historical and cultural character of the remains that have not been revealed by excavation. The academic conference explained that it is an opportunity to understand the nature and value of cultural assets, such as the location of cultural assets, the status of relics, and events related to relics.
Borehole radar reflection surveys were carried out in the horizontal borehole to detect EDZ while constructing the tunnel for the research facility of the nuclear waste disposal in Korea. The horizontal borehole has been bored at a length of 35 m from shelter to be parallel with the tunnel which would be planed. While the tunnel has been constructing with the explosive excavation, the borehole radar reflection surveys carried out 5 times with the interval of 2 or 4 days for monitoring EDZ. The most typical change of the reflection event resulted from the face of the wall of tunnel which had been produced newly by the excavation of the tunnel daily, EDZ has been detected with constructing images of difference between two measurement stages, and also the change of EDZ through the time has been done, which is due to the generation of crack and weakening of the rock strength of the face of the tunnel's wall near previous portion of the face of a blind end of tunnel according to explosive excavation.
Kim, Young-Geun;Han, Byeong-Hyun;Lee, Seung-Bok;Kim, Eung-Tae
Tunnel and Underground Space
/
v.21
no.4
/
pp.251-263
/
2011
The geomechanical characteristics of rock and the structural geological feature of the fault should be studied and examined for the successful construction of large-span tunnel. In this case study, that is a important case for the tunnel collapse and reinforcement during the construction for the waterway tunnel at large thrust fault zone in schist, we carried out geological and geotechnical survey for make the cause and mechanism of tunnel collapse. Also, we have designed the reinforcement and re-excavation for the safe construction for collapse zone and have carried out successfully the re-excavation and finished the final concrete lining.
Detailed survey of the rock mass is essential for design, construction and maintenance of rock slope. However, geological survey of poor outcrops and various geophysical aids provides limited information for slope engineering. Remote measurement system for excavation surface (Surface Mapper) and projection s/w for borehole data (Fracjection) are developed for further support of slope surveying. The Surface Mapper measures orientation of joint, fault, foliation on excavated rock surface and database the measured data. The Fracjection projects measurements in boreholes, which are obtained by BIPS, Televideo and DOM operation, to any expected excavation space. These methods promise new approaches for surveying, designing, constructing and maintaining processes of slope.
Proceedings of the Korean Geotechical Society Conference
/
1999.10a
/
pp.201-208
/
1999
The NATM(New Austrian Tunnelling Method) has been used for tunnelling since 1980's. But Collapses of tunnel under construction take place frequently, especially at urban areas because of adjacent buildings, underground conduits and traffic loads. This paper is a case study on the reinforcement method of subway tunnel at urban areas. In this study, ground inspection, geological investigation, laboratory test and numerical analysis by means of FDM program were carried out. The tunnel excavation was stopped because of over excessive brake of tunnel crown and shotcrete was installed to prevent deformation of adjacent ground as the temporary method. From the result of field survey and geological investigation, it is found that the soft weathered soil was distributed to the ground of tunnel invert unlike original investigation. The results of the analysis and the study show that the SGR(Space Grouting Rocket) method and Umbrella method can be applied for the stability of tunnel excavation and in addition the reinforcement of concrete lining is required for long-term stability of tunnel.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.