• Title/Summary/Keyword: Evacuation safety ssessment

Search Result 1, Processing Time 0.014 seconds

A Study on the Safety of Evacuation according to Evacuation Delay Time and Fire Door Openness: Based on Residence Types (피난 지연시간의 적용과 방화문 개방 정도에 따른 피난 안전성 확보에 관한 고찰 : 주거형태를 중심으로)

  • Seo, Dong-Gil;Kim, Mi-Seon;Gu, Seon-Hwan;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.156-165
    • /
    • 2020
  • In this paper, the application of evacuation delay time (Cognition time + initiation time) and examine the degree of opening of fire doors in households for evaluating evacuation safety and suggest a realistic alternative. In order to proceed with this study, first of all, the preliminary investigation on evacuation safety evacuation of residential-type buildings (Apartment, urban living houses, etc.) among the performance-oriented design targets of Gwangju Metropolitan City, which was implemented until June 2018. Then, for the two representative types that are commonly used among the previously surveyed buildings, evacuation delay time is applied to W1, W2, and respectively simulating the opening of the doors is applied to th full open, 1/4 open, the leakage gap and evacuation safety evaluation was performed. As a result of evaluating evacuation safety was found that it is difficult to secure evacuation safety regardless of evacuation delay time W1 and W2 when the fire door is fully open and 1/4 open, Only when the leakage gap is applied evacuation safety was ensured even if evacuation delay time W2 was applied. Therefore, when a residential building is subject to performance-oriented design, evaluating the application of W2 rather than W1 is considered for evacuation delay time to reflect concern about privacy infringement due to CCTV installation, etc. In order to secure the Smoke blocking performance of the fire door and to improve the performance-oriented design, I would like to propose to consider the method of applying a leak gap to the degree of opening of the fire door. Through this, it is expected that the performance-oriented design will be a step further by performing evacuation safety evaluation with more realistic data.