• Title/Summary/Keyword: Evacuation performance

Search Result 208, Processing Time 0.022 seconds

A Basic Study on the Evacuation Safety Performance of High-rise Apartment Building (고층 공동주택의 피난성능에 관한 기초적 연구)

  • 이용재
    • Fire Science and Engineering
    • /
    • v.15 no.1
    • /
    • pp.75-83
    • /
    • 2001
  • It has been recognized that the evacuation planning is very important for effective evacuation of occupants on fire event. However the present evacuation planning and regulation for fire safety usually tend to meet the minimum requirements based on the existing laws and regulations. The ultimate goal of the evacuation planning is evacuate occupants rapidly from building fires to the safe areas. In this study, First, analyzed occupants load density and occupants characteristics in high-rise apartment buildings, Second, A evacuation safety performance of high-rise apartment buildings was analyzed with various typical floor plans. The purpose of this study is to figure out the evacuation characteristics in high-rise apartment buildings and improve countermeasure through comparative study on the Evacuation regulation and floor plans for High-rise Apartment buildings.

  • PDF

Developing an Evacuation Evaluation Model for Offshore Oil and Gas Platforms Using BIM and Agent-based Model

  • Tan, Yi;Song, Yongze;Gan, Vincent J.L.;Mei, Zhongya;Wang, Xiangyu;Cheng, Jack C.P.
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.32-41
    • /
    • 2017
  • Accidents on offshore oil and gas platforms (OOGPs) usually cause serious fatalities and financial losses considering demanding environment platforms locate and complex topsides structure platforms own. Evacuation planning on platforms is usually challenging. The computational tool is a good choice to plan evacuation by emergency simulation. However, the complex structure of platforms and varied evacuation behaviors usually weaken the advantages of computational simulation. Therefore, this study developed a simulation model for OOGPs to evaluate different evacuation plans to improve evacuation performance by integrating building information modeling (BIM) and agent-based model (ABM). The developed model consists of four parts: evacuation model input, simulation environment modeling, agent definition, and simulation and comparison. Necessary platform information is extracted from BIM and then used to model simulation environment by integrating matrix model and network model. During agent definition, in addition to basic characteristics, environment sensing and dynamic escape path planning functions are also developed to improve simulation performance. An example OOGP BIM topsides with different emergent scenarios is used to illustrate the developed model. The results showed that the developed model can well simulate evacuation on OOGPs and improve evacuation performance. The developed model was also suggested to be applied to other industries such as the architecture, engineering, and construction industry.

  • PDF

Proposals on the Input Data Standardization Needs of Fire and Evacuation Simulation in Performance Based Design (성능위주 화재와 피난시뮬레이션 입력데이터의 표준화 필요성에 대한 제안)

  • Jang, Keun Ho
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.18-25
    • /
    • 2016
  • National performance-based design methods and prescribed standards for various input data not defined as separated regulation, ASET and RSET fire and evacuation simulations on the data cited by different designers. This is also directly connected reliability problems for the evacuation simulation and performance-based fire. standardizing the various input to performance-based fire and evacuation simulations of a similar risk, regardless of the experience of designer or technical skills. The performance-based targets proper fire-fighting and emergency equipment installed reasonable initial investment cost to done ensure safety.

A Study on the Analysis of Simulation for Improvement Evacuation Safety Assessment of Building in Fire (건축물의 화재 시 피난안전성 평가 개선을 위한 시뮬레이션 분석 연구)

  • Kim, Hye-won;Kim, Yoon-Seong;Lee, Byeong-Heun;Jin, Seung-Hyeon;Koo, In-Hyuk;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.107-108
    • /
    • 2020
  • There is a need to analyze various factors in evacuation safety assessment of building in fire. In the current performance based design, evacuation safety assessment in case of fire is being conducted through the simulation as FDS and Pathfinder. However, the location and size of the door, the location of evacuation in the event of a fire are not considered when design. Accordingly, it is difficult to determine the worst case scenario considering the actual fire. Therefore in this study, in this study, we will propose an appropriate evaluation plan through simulation considering the worst-case scenario that may occur in case of fire.

  • PDF

Statistical Analysis of the Structure and Performance of Fire Doors for Evacuation Space and Common Areas in Apartment Housing (공동주택 대피공간·공용부 방화문 구조 및 성능에 관한 통계적 분석)

  • Shim, Han-Young;Park, Won-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.239-249
    • /
    • 2022
  • Fire resistance performance and performance design of fire doors are becoming more important to prevent the spread of fire and support the rapid evacuation of apartment buildings. In this study, a database using 182 evacuation spaces and 308 common areas that passed the fire performance test was established, and fire door performance influencing factors were derived through an analysis of the structure(12 elements) of the fire door. As a result, the effects of fire-resisting filler density, adhesive, and foam gasket were confirmed for evacuation space, and the effects of fire-resisting filler, adhesive, and fire fins were confirmed for common areas. In the fire door fire resistance test, flames and cracks were analyzed as the most frequent failure factors.

A Study on the Evacuation Performance of Evacuation System using Real-time IoT Information (실시간 IoT 정보 활용 피난시스템의 피난성능 연구)

  • Lee, Chul Gyoo;Moon, Sang Ho;Lee, Sang Kyu;Lee, Gye Eun
    • Journal of Korea Multimedia Society
    • /
    • v.22 no.2
    • /
    • pp.281-291
    • /
    • 2019
  • In order to reflect complex and diverse building types, resident characteristics and disaster factors, it is necessary to introduce a flexible situation-based response system based on real-time information. Intelligent CCTV, hybrid sensor, location scanner, and customized broadcasting device were examined to introduce for the real-time response intelligent response system and its feasibility was verified through field test. In addition, based on the real-time information, the evacuation simulation was executed by assuming the dormitory building and the resident of the school, and the safety of the evacuation and the shortening of the pinnacle time were confirmed. The feasibility of real time information based evacuation comparing with the existing evacuation system were verified in the case of evacuation.

A Study of the Evacuation Safety for Workers on the Theater Stage Plan Shapes

  • Yong-Gyu, Park;Heung-Sik, Woo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.3
    • /
    • pp.149-157
    • /
    • 2023
  • The purpose of this study is to suggest that performers in the performing arts actively utilize the loading dock and stage door when evacuating from the stage space of a performance hall in a crisis situation. Therefore, first, we analyzed the system related to the performance hall's safety. The stage evacuation type was classified into A, B, C, and D forms by applying the building law audience evacuation standards. Second, statistical data were organized based on measurement data, and the characteristics of each form were summarized. Third, the network reliability measurement method was borrowed to evaluate the evacuation safety of the evacuation route in the stage space. We confirmed quantitatively that the direction of the loading dock direction and stage door direction on the stage is advantageous for evacuation. In this study, it was possible to distinguish the advantage of evacuation according to the type of evacuation, (A(0.1274)>B(0.1228).>.C(0.0487)) with A being the most advantageous. These results can be expected to improve the evacuation safety of the stage, and furthermore, they are expected to be used as basic data for stage evacuation.

Measures to Increase Evacuation Safety through Performance-Based Design of Escape Room Cafes (방탈출카페의 성능위주설계에 의한 피난안전성 확대 방안)

  • Hong-Sang Lee;Jai Young Lee;Ha-Sung Kong
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.95-104
    • /
    • 2023
  • The purpose of this study is to propose measures to increase evacuation safety by calculating the habitable time using a fire and evacuation simulation program for the Room-escape cafe currently in operation, and comparing and analyzing it with the evacuation required time. Assuming a fire due to overheating of electric heaters in use in front of the warehouse, the habitable time was calculated through fire simulation, and the occupant's evacuation time calculated through evacuation simulation according installation of safety facilities, etc. was compared and analyzed with the habitable time. In the case of escape room cafes with safety facilities installed, evacuation safety was satisfied, but in escape room cafes without safety facilities, the evacuation safety was not secure. As a result of analyzing evacuation safety for each scenario based on the ASET analyzed in the fire simulation, it was found that in scenario 1, evacuation safety was secured and everyone successfully evacuated, while in scenario 2, no one succeeded in evacuation. These results can be said to confirm that the installation of safety facilities is very important in business establishments such as escape room cafes, which become enclosed structures when games are started.

A Study on the Evacuation Performance Review for the Office Buildings (업무용 빌딩의 피난 성능 검토에 관한 연구)

  • 오혁진;백승태;김우석;이수경
    • Fire Science and Engineering
    • /
    • v.17 no.3
    • /
    • pp.1-6
    • /
    • 2003
  • In this study, it reviewed about evacuation performance of a specified Office Building. assessment tools is FAST 3.1.7 (Estimation of Flash Over, Estimation of Layer Height Down Flow Time), SIMULEX 32-bit (Estimation of Evacuation Time), JASMINE 3.25d. (Smoke Flow Assessment of a specified time) Result from Fire Scenario # 1, Flash Over is not generated in Compartment. Evacuation Time is estimated 25.2 sec by SIMULEX 32-bit. layer height until this time (25.2 sec) was estimated 2.4 m by FAST 3.1.7. After ignition until this time (25.2 sec), smoke was not release to the a corridor. In consequence, We concluded that people in building are completing the safe evacuation without the damage of smoke. Result from Fire Scenario # 1, Flash Over generated 6 min 33.2 sec in Compartment. Evacuation Time is estimated 1 min 25.5 sec by SIMULEX 32-bit. layer height down flow time is 1 min 40.8 sec by FAST 3.1.7 and 5 min 23 sec by theoretical calculation. Also, total building evacuation time was estimated 2 min 26.6 sec. After ignition until this time (2 min 26.6 sec), smoke released to the a corridor but it amount was few little. Therefore, generated smoke in compartment not effected to the people in buildings.

A Study on the Safety of Evacuation according to Evacuation Delay Time and Fire Door Openness: Based on Residence Types (피난 지연시간의 적용과 방화문 개방 정도에 따른 피난 안전성 확보에 관한 고찰 : 주거형태를 중심으로)

  • Seo, Dong-Gil;Kim, Mi-Seon;Gu, Seon-Hwan;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.156-165
    • /
    • 2020
  • In this paper, the application of evacuation delay time (Cognition time + initiation time) and examine the degree of opening of fire doors in households for evaluating evacuation safety and suggest a realistic alternative. In order to proceed with this study, first of all, the preliminary investigation on evacuation safety evacuation of residential-type buildings (Apartment, urban living houses, etc.) among the performance-oriented design targets of Gwangju Metropolitan City, which was implemented until June 2018. Then, for the two representative types that are commonly used among the previously surveyed buildings, evacuation delay time is applied to W1, W2, and respectively simulating the opening of the doors is applied to th full open, 1/4 open, the leakage gap and evacuation safety evaluation was performed. As a result of evaluating evacuation safety was found that it is difficult to secure evacuation safety regardless of evacuation delay time W1 and W2 when the fire door is fully open and 1/4 open, Only when the leakage gap is applied evacuation safety was ensured even if evacuation delay time W2 was applied. Therefore, when a residential building is subject to performance-oriented design, evaluating the application of W2 rather than W1 is considered for evacuation delay time to reflect concern about privacy infringement due to CCTV installation, etc. In order to secure the Smoke blocking performance of the fire door and to improve the performance-oriented design, I would like to propose to consider the method of applying a leak gap to the degree of opening of the fire door. Through this, it is expected that the performance-oriented design will be a step further by performing evacuation safety evaluation with more realistic data.